19-00026-00-PV
- Let date
- Friday, March 11, 2022
- Contract
- 87760 · job page
- District
- District 3
- County
- Iroquois
- Highway
- Limits
- Roadway reconstruction, Curb and gutter, storm sewers, landscaping, streetscape, lighting, and pavement markings on North Central Street, from Crescent St. to East 3rd. Street, and on East 2nd Street from the IC Railroad to North Central Street, and on East Front Street from North Central St. to North Main Street in Gilman.
Bidders 1
| # | Contractor | Total bid | vs estimate | vs low |
|---|---|---|---|---|
| EE | Engineer's estimate | — | ||
| 1 | Iroquois Paving Corporation Low bidder | $3,193,594 |
| Seq | Bid code | Description | Qty | Unit | Estimate | #1 Iroquois Paving… |
|---|---|---|---|---|---|---|
| 1 | A2000120 | T-ACERX FREM AB 2-1/2 | 6 | EACH | $510.00 | |
| 2 | A2004820 | T-GLED TRI-I SK 2-1/2 | 20 | EACH | $530.00 | |
| 3 | A2005960 | T-PLAT X ACR MC 2.5 | 8 | EACH | $545.00 | |
| 4 | A2006720 | T-QUERCUS MACR 2-1/2 | 4 | EACH | $540.00 | |
| 5 | A2008470 | T-ULMUS AMER PRNC 2.5 | 6 | EACH | $510.00 | |
| 6 | C2C09784 | S-SPIREA BETUL T 2'C | 121 | EACH | $45.00 | |
| 7 | C2002437 | S-DIER G2X8854 CG 3G | 40 | EACH | $48.00 | |
| 8 | C2005812 | S-RHUS AROMA GRO 2 BB | 134 | EACH | $48.00 | |
| 9 | D2C03524 | E-TAXUS X MD DN 2'C | 68 | EACH | $56.00 | |
| 10 | D2015401 | E-JUNIP CHIN KC 24 | 95 | EACH | $70.00 | |
| 11 | K0012990 | P PL ORNAMENT T GAL P | 37.61 | UNIT | $1,475.00 | |
| 12 | K1005481 | SHRED BARK MULCH 3 | 1,512 | SQ YD | $5.25 | |
| 13 | XX003219 | UNIT PAVERS | 11,924 | SQ FT | $26.25 | |
| 14 | XX005735 | PLANTER CURB | 560 | FOOT | $60.00 | |
| 15 | XX007324 | RECYCLING RECEPTACLE | 5 | EACH | $3,100.00 | |
| 16 | XX008159 | PCC BAND PAVER BRICKS | 1,659 | FOOT | $42.50 | |
| 17 | XX009518 | DEC RDWY LIGHT ASSY | 26 | EACH | $11,250.00 | |
| 18 | XX009519 | CONC MAINTENANCE BAND | 1,512 | FOOT | $42.50 | |
| 19 | X0320060 | GATEWAY MON SIGN COMP | 2 | EACH | $26,000.00 | |
| 20 | X0321158 | PARK BENCHES | 8 | EACH | $2,600.00 | |
| 21 | X0325379 | DIRECTIONAL BORING | 100 | FOOT | $91.00 | |
| 22 | X0325970 | SOIL CONDITION 3 | 1,512 | SQ YD | $8.00 | |
| 23 | X0327423 | CONNECT EXIST CULVERT | 3 | EACH | $1,750.00 | |
| 24 | X0327487 | TRI GEOGRID REINF T1 | 7,961 | SQ YD | $4.35 | |
| 25 | X0327997 | TRASH RECEPTACLES | 5 | EACH | $3,100.00 | |
| 26 | X0328010 | SEATWALL 19' HT | 135 | FOOT | $450.00 | |
| 27 | X1200297 | TYPE 11 FRAME AND GRATE | 1 | EACH | $950.00 | |
| 28 | X2600034 | HIST INTRPRTV SIGN COMPLETE | 1 | EACH | $2,850.00 | |
| 29 | X4404400 | PAVT REMOVAL SPL | 545 | SQ YD | $11.00 | |
| 30 | X6026050 | SANITARY MANHOLE ADJ | 2 | EACH | $850.00 | |
| 31 | X7010216 | TRAF CONT & PROT SPL | 1 | L SUM | $45,000.00 | |
| 32 | X7240600 | REM RE-ERECT EX SIGN | 12 | EACH | $175.00 | |
| 33 | Z0013798 | CONSTRUCTION LAYOUT | 1 | L SUM | $1.00 | |
| 34 | Z0048665 | RR PROT LIABILITY INS | 1 | L SUM | $0.0100 | |
| 35 | 20200100 | EARTH EXCAVATION | 3,599 | CU YD | $42.50 | |
| 36 | 20800150 | TRENCH BACKFILL | 373 | CU YD | $50.00 | |
| 37 | 21101625 | TOPSOIL F & P 6 | 632 | SQ YD | $7.50 | |
| 38 | 21101645 | TOPSOIL F & P 12 | 1,512 | SQ YD | $15.75 | |
| 39 | 25000110 | SEEDING CL 1A | 0.1 | ACRE | $8,250.00 | |
| 40 | 25000400 | NITROGEN FERT NUTR | 12 | POUND | $3.25 | |
| 41 | 25000500 | PHOSPHORUS FERT NUTR | 12 | POUND | $3.25 | |
| 42 | 25000600 | POTASSIUM FERT NUTR | 12 | POUND | $3.25 | |
| 43 | 25100630 | EROSION CONTR BLANKET | 632 | SQ YD | $2.75 | |
| 44 | 25200200 | SUPPLE WATERING | 90 | UNIT | $165.00 | |
| 45 | 28000500 | INLET & PIPE PROTECT | 35 | EACH | $0.0100 | |
| 46 | 35101600 | AGG BASE CSE B 4 | 2,329 | SQ YD | $14.75 | |
| 47 | 35101800 | AGG BASE CSE B 6 | 1,793 | SQ YD | $15.25 | |
| 48 | 35102300 | AGG BASE CSE B 11 | 7,961 | SQ YD | $22.50 | |
| 49 | 40600275 | BIT MATLS PR CT | 17,912 | POUND | $0.0100 | |
| 50 | 40600290 | BIT MATLS TACK CT | 1,791 | POUND | $0.0100 | |
| 51 | 40602978 | HMA BC IL-9.5 N50 | 1,061 | TON | $105.00 | |
| 52 | 40604050 | HMA SC IL-9.5 C N50 | 943 | TON | $110.00 | |
| 53 | 40733705 | LONG JOINT SEALANT | 3,621 | FOOT | $4.00 | |
| 54 | 42000100 | PCC PVT 6 | 569 | SQ YD | $82.00 | |
| 55 | 42400200 | PC CONC SIDEWALK 5 | 20,969 | SQ FT | $8.50 | |
| 56 | 42400800 | DETECTABLE WARNINGS | 541 | SQ FT | $46.50 | |
| 57 | 44000100 | PAVEMENT REM | 10,584 | SQ YD | $18.00 | |
| 58 | 44000300 | CURB REM | 1,654 | FOOT | $14.50 | |
| 59 | 44000500 | COMB CURB GUTTER REM | 561 | FOOT | $14.00 | |
| 60 | 44000600 | SIDEWALK REM | 23,906 | SQ FT | $2.00 | |
| 61 | 550A0050 | STORM SEW CL A 1 12 | 885 | FOOT | $76.00 | |
| 62 | 550A0070 | STORM SEW CL A 1 15 | 377 | FOOT | $86.00 | |
| 63 | 550A0090 | STORM SEW CL A 1 18 | 7 | FOOT | $155.00 | |
| 64 | 550A0120 | STORM SEW CL A 1 24 | 265 | FOOT | $115.00 | |
| 65 | 55100300 | STORM SEWER REM 8 | 3 | FOOT | $178.00 | |
| 66 | 55100500 | STORM SEWER REM 12 | 46 | FOOT | $95.00 | |
| 67 | 56106300 | ADJ WATER MAIN 6 | 105 | FOOT | $195.00 | |
| 68 | 56106400 | ADJ WATER MAIN 8 | 30 | FOOT | $260.00 | |
| 69 | 56109210 | WATER VALVES ADJUST | 26 | EACH | $275.00 | |
| 70 | 56300300 | ADJ WATER SERV LINES | 160 | FOOT | $105.00 | |
| 71 | 56400400 | FIRE HYDNTS RELOCATED | 1 | EACH | $3,150.00 | |
| 72 | 60218300 | MAN TA 4 DIA T1F OL | 1 | EACH | $2,400.00 | |
| 73 | 60218400 | MAN TA 4 DIA T1F CL | 1 | EACH | $2,400.00 | |
| 74 | 60219000 | MAN TA 4 DIA T8G | 2 | EACH | $2,350.00 | |
| 75 | 60219300 | MAN TA 4 DIA T11F&G | 5 | EACH | $2,600.00 | |
| 76 | 60222000 | MAN TA 5 DIA T11F&G | 1 | EACH | $3,400.00 | |
| 77 | 60224461 | MAN TA 8 DIA T11F&G | 1 | EACH | $8,500.00 | |
| 78 | 60235700 | INLETS TA T3F&G | 2 | EACH | $1,500.00 | |
| 79 | 60236200 | INLETS TA T8G | 3 | EACH | $1,350.00 | |
| 80 | 60236800 | INLETS TA T11F&G | 7 | EACH | $1,800.00 | |
| 81 | 60240220 | INLETS TB T3F&G | 1 | EACH | $2,000.00 | |
| 82 | 60240301 | INLETS TB T8G | 3 | EACH | $1,750.00 | |
| 83 | 60240310 | INLETS TB T11F&G | 9 | EACH | $2,200.00 | |
| 84 | 60260400 | INLETS ADJ NEW T1F CL | 1 | EACH | $750.00 | |
| 85 | 60500060 | REMOV INLETS | 9 | EACH | $875.00 | |
| 86 | 60603800 | COMB CC&G TB6.12 | 4,928 | FOOT | $38.00 | |
| 87 | 60605000 | COMB CC&G TB6.24 | 242 | FOOT | $58.00 | |
| 88 | 61140000 | STORM SEWER SPEC 8 | 3 | FOOT | $225.00 | |
| 89 | 66900200 | NON SPL WASTE DISPOSL | 210 | CU YD | $155.00 | |
| 90 | 66900530 | SOIL DISPOSAL ANALY | 2 | EACH | $2,100.00 | |
| 91 | 66901001 | REG SUB P-CONST PLAN | 1 | L SUM | $2,500.00 | |
| 92 | 66901003 | REG SUB F CON REPORT | 1 | L SUM | $2,400.00 | |
| 93 | 66901006 | REG SUB MON | 8 | CAL DA | $1,400.00 | |
| 94 | 67100100 | MOBILIZATION | 1 | L SUM | $135,000.00 | |
| 95 | 72000100 | SIGN PANEL T1 | 4.5 | SQ FT | $42.50 | |
| 96 | 72900100 | METAL POST TY A | 40 | FOOT | $18.50 | |
| 97 | 78000100 | THPL PVT MK LTR & SYM | 196 | SQ FT | $9.10 | |
| 98 | 78000200 | THPL PVT MK LINE 4 | 4,085 | FOOT | $1.45 | |
| 99 | 78000400 | THPL PVT MK LINE 6 | 97 | FOOT | $2.50 | |
| 100 | 78000600 | THPL PVT MK LINE 12 | 125 | FOOT | $4.60 | |
| 101 | 78000650 | THPL PVT MK LINE 24 | 169 | FOOT | $9.15 | |
| 102 | 81028330 | UNDRGRD C PVC 1 1/4 | 2,366 | FOOT | $12.95 | |
| 103 | 81028390 | UNDRGRD C PVC 4 | 100 | FOOT | $24.00 | |
| 104 | 81400100 | HANDHOLE | 2 | EACH | $2,185.00 | |
| 105 | 81702417 | EC C XLP 3-1C#6 1C#6G | 3,158 | FOOT | $9.75 | |
| 106 | 82500370 | LT CONT BASEM 240V200 | 1 | EACH | $14,900.00 | |
| 107 | 83600200 | LIGHT POLE FDN 24D | 156 | FOOT | $245.00 | |
| 108 | 84200500 | REM LT UNIT SALV | 12 | EACH | $385.00 | |
| 109 | 84200804 | REM POLE FDN | 12 | EACH | $670.00 |