Filtered by: County: Kankakee Clear all
| Let date | Contract / PPS | County / Division | Highway | Description | Estimate | Status | Low bidder | |
|---|---|---|---|---|---|---|---|---|
| Jan 17, 2025 | 66P99 | KankakeeDistrict 3 | Repair and maintain traffic signals, flashing beacons, roadway lighting, speed display signs, and other electrical services within Kankakee County. | — | Active | Outsen Electric, Incorporated $193,820 · | ||
| Jan 17, 2025 | 87805 | KankakeeDistrict 3 | Reconstruction of Manteno-Deslem Road to provide a 3-lane roadway with bi-directional turn lane from US 45/52 to Spuce Street in Manteno. | — | Executed | Kankakee Valley Construction Company, Inc. $9,569,046 · | ||
| Mar 7, 2025 | 66P84 | KankakeeDistrict 3 | Cleaning and painting all steel components of structure 046-0114 carrying I-57 over Minnie Creek, 4.3 miles north of the Chebanse interchange. | — | Executed | ERA-Valdivia Contractors, Inc. $127,908 · | ||
| Apr 25, 2025 | 66A85 | KankakeeDistrict 3 | HMA milling and resurfacing (designed overlay), culvert replacement, pavement marking, ditch cleaning and raised reflective markers on FAS 1317 (IL 113) from the Will County Line to Edgewater Dr in Limestone, 6.14 miles gross. | — | Executed | Kankakee Valley Construction Company, Inc. $3,511,811 · | ||
| Apr 25, 2025 | 66N61 | KankakeeDistrict 3 | Installation of a flashing red beacon at each of the stop controlled approaches to the intersection of IL 115 and S 7000 W Rd (Lehigh RD), and installation of a flashing yellow beacon at each of the advanced intersection warning signs adjacent to IL 115. | — | Executed | D. Construction, Inc. $165,198 · | ||
| Apr 25, 2025 | 66R33 | KankakeeDistrict 3 | Milling and resurfacing 1 1/2" (SMART), patching, aggregate shoulders, pavement marking, and raised reflectors on FAP 332 (IL 1) from Will County Line to IL 17, 3.91 miles total. | — | Executed | Gallagher Asphalt Corporation $1,938,778 · | ||
| Apr 25, 2025 | 66R35 | KankakeeDistrict 3 | 8.84 miles milling and SMART resurfacing from 0.5 miles south of Larry Power Road to Will County Line. | — | Executed | Kankakee Valley Construction Co., Inc. & Gallagher Asphalt Corporation $19,511,604 · | ||
| Jun 13, 2025 | 66R18 | KankakeeDistrict 3 | Centerline joint sealing, microsurfacing, shoulder widening and rumble strips on IL Route 17 at two locations, 1: beginning at the east approach of SN 046-0027 and ending 0.5 mi. east of 19000W Rd; 2: beginning 0.01 mi. west of 12000W Rd. and ending 0.11 mi. east of 5000W Rd. | — | Executed | Kankakee Valley Construction Company, Inc. $1,599,488 · | ||
| Jun 13, 2025 | 66R42 | KankakeeDistrict 3 | Traffic Signal Mast Arm Replacement at the intersections of US 45/US 52 and River Road and at US 45/ US 52 and South Tec Drive. | — | Active | Van-Mack Electric Co. $689,984 · | ||
| Jun 13, 2025 | 87860 | KankakeeDistrict 3 | Resurfacing CH 41 from the Will County line to South Street. | — | Executed | Kankakee Valley Construction Company, Inc. $580,188 · | ||
| Jun 13, 2025 | 87874 | KankakeeDistrict 3 | Streetscaping improvements at various locations in Grank Park. | — | Executed | M & J Underground Inc. $2,806,802 · | ||
| Jun 13, 2025 | 87883 | KankakeeDistrict 3 | Construction of shared-use paths at various location in Bradley. | — | Executed | M & J Underground Inc. $327,924 · | ||
| Feb 27, 2026 | 66R39 | KankakeeDistrict 3 | Routing and filling primarily longitudinal but includes transverse as needed from the intersection of IL 17 and IL 1 continuing south on IL 1 to the north city limits of St. Anne, IL. 6.76 gross miles. | — | Executed | Freehill Asphalt, Inc. $39,585 · | ||
| Apr 24, 2026 | 66R68 | KankakeeDistrict 3 | Joint replacement, bearing replacement, deck and approach patch, HMA shoulder and concrete repairs at structure No. 046-0021 carrying IL 1 over Trim Creek 0.2 miles west of Grant Park in Kankakee County. | — | Executed | Tobey's Construction & Cartage, Inc. $591,428 · | ||
| Apr 24, 2026 | 66T17 | KankakeeDistrict 3 | Intermittent HMA milling and resurfacing, pavement marking, raised reflective markers, and detector loops on F Work consists of intermittent HMA milling and resurfacing, pavement marking, raised reflective markers, and detector loops on FAP 840 (IL-50) from north of US 45/52 to south of Brookmont Blvd and Indiana Ave to Fair St in Kankakee. 4.09 miles gross length. | — | Executed | Kankakee Valley Construction Company, Inc. $2,380,597 · | ||
| Jun 12, 2026 | 66T42 | FordIroquoisKankakeeDistrict 3 | Litter picking_on interstate I-57, throughout Ford, Iroquois, and Kankakee Counties. | — | Executed | The Final Connection, Inc. $75,170 · | ||
| Jun 12, 2026 | 87851 | KankakeeDistrict 3 | Replace the bridge carrying CH 14 over Trim Creek located 3.3 miles south of IL 17. | — | Executed | Riber Construction, Inc. $1,225,921 · | ||
| Jul 31, 2026 | 66T35 | KankakeeDistrict 3 | Removing and replacing high-mast tower, underpass and roadway lighting luminares at the I-57 and IL 50 Interchange and at the south IL 1/17 intersection. | — | Executed | Laser Electric, Inc. $447,135 · | ||
| Sep 18, 2026 | 66863 | KankakeeDistrict 3 | Reconstructing the interchange to provide a single point urban diamond interchange This project is located on FAI 57 (I-57) at IL-17 interchange in Kankakee. Work consists of reconstructing the interchange to provide a single point urban diamond interchange. The proposed interchange will accommodate a future six lane section on I-57. Bridges SN 046-0006 (NB) and SN 046-0007 (SB) will be replaced with SN 046-0154, and SN 046-0005 carrying the KBandS RR over I-57 with SN 046-9904. The work consists of reconstruction of 1.6 miles of I-57, and 0.73 miles of IL 17. Work includes pa | — | Executed | |||
| Sep 18, 2026 | 87918 | KankakeeDistrict 3 | HMA surface removal, HMA overlay and shoulders on CH 17 from Will County line to E 9000 N Road. | — | Executed |
1–20 of 20
Lettings: IDOT Transportation Bulletin (Notice of Letting and Contract Detail pages). Planned projects: IDOT Multi-Year Highway Improvement Program (roadway, structure and spot layers on the IDOT open data hub), listed by program year, not let date. "Added" is the first date Bid Potato saw the job. Always confirm against the official proposal before bidding.