11-00116-04-BR
Bidders 2
| # | Contractor | Total bid | vs estimate | vs low |
|---|---|---|---|---|
| EE | Engineer's estimate | — | ||
| 1 | Rausch Infrastructure, LLC Low bidder | $1,885,543 | ||
| 2 | Iroquois Paving Corporation | $1,971,882 | +4.6% |
| Seq | Bid code | Description | Qty | Unit | Estimate | #1 Rausch Infrastr… | #2 Iroquois Paving… |
|---|---|---|---|---|---|---|---|
| 1 | X2501000 | SEEDING CL 2 SPL | 0.2 | ACRE | $4,500.00 | $12,750.00 | |
| 2 | X7011800 | TRAF CONT-PROT BLR 21 | 1 | L SUM | $7,000.00 | $39,000.00 | |
| 3 | Z0001904 | STRUCT STEEL REMOV | 1 | L SUM | $80,000.00 | $66,000.00 | |
| 4 | Z0007112 | C&D LEAD PT CL RES | 1 | L SUM | $30,000.00 | $45,500.00 | |
| 5 | Z0010501 | CLEAN & PT STL BR N1 | 1 | L SUM | $82,000.00 | $149,000.00 | |
| 6 | Z0012754 | STR REP CON DP = < 5 | 9 | SQ FT | $300.00 | $250.00 | |
| 7 | Z0018004 | DRAINAGE SCUPPR DS-12 | 9 | EACH | $2,300.00 | $1,635.00 | |
| 8 | Z0046304 | P UNDR FOR STRUCT 4 | 116 | FOOT | $10.00 | $23.50 | |
| 9 | Z0073500 | TEMP SUPPORT SYSTEM | 1 | L SUM | $80,000.00 | $61,000.00 | |
| 10 | Z0076600 | TRAINEES | 2,000 | HOUR | $0.8000 | $0.8000 | |
| 11 | Z0076604 | TRAINEES TPG | 2,000 | HOUR | $15.00 | $15.00 | |
| 12 | 20100500 | TREE REMOV ACRES | 0.1 | ACRE | $40,000.00 | $105,780.00 | |
| 13 | 20200100 | EARTH EXCAVATION | 249 | CU YD | $70.00 | $53.75 | |
| 14 | 28000250 | TEMP EROS CONTR SEED | 29 | POUND | $17.00 | $27.00 | |
| 15 | 28000400 | PERIMETER EROS BAR | 1,082 | FOOT | $8.50 | $1.60 | |
| 16 | 28100209 | STONE RIPRAP CL A5 | 77 | TON | $175.00 | $225.00 | |
| 17 | 28200200 | FILTER FABRIC | 70 | SQ YD | $30.00 | $2.00 | |
| 18 | 35101400 | AGG BASE CSE B | 611 | TON | $38.00 | $35.00 | |
| 19 | 40600275 | BIT MATLS PR CT | 2,011 | POUND | $1.00 | $0.0100 | |
| 20 | 40600290 | BIT MATLS TACK CT | 185 | POUND | $1.00 | $0.0100 | |
| 21 | 40603080 | HMA BC IL-19.0 N50 | 103 | TON | $140.00 | $145.00 | |
| 22 | 40604050 | HMA SC IL-9.5 C N50 | 69 | TON | $165.00 | $156.00 | |
| 23 | 42000070 | PVT CON HMA BR APP SL | 338 | SQ YD | $120.00 | $93.00 | |
| 24 | 44000100 | PAVEMENT REM | 1,175 | SQ YD | $25.00 | $16.50 | |
| 25 | 44000400 | GUTTER REM | 385 | FOOT | $15.00 | $8.65 | |
| 26 | 48100100 | AGGREGATE SHLDS A | 248 | TON | $88.00 | $41.30 | |
| 27 | 50102400 | CONC REM | 47 | CU YD | $1,000.00 | $1,450.00 | |
| 28 | 50104650 | SLOPE WALL REMOV | 31 | SQ YD | $54.00 | $139.00 | |
| 29 | 50104720 | REM EXIST CONC DECK | 1 | EACH | $135,000.00 | $130,000.00 | |
| 30 | 50200100 | STRUCTURE EXCAVATION | 66 | CU YD | $100.00 | $21.00 | |
| 31 | 50300225 | CONC STRUCT | 81.5 | CU YD | $810.00 | $1,295.00 | |
| 32 | 50300255 | CONC SUP-STR | 318.7 | CU YD | $875.00 | $1,200.00 | |
| 33 | 50300260 | BR DECK GROOVING | 850 | SQ YD | $9.00 | $9.50 | |
| 34 | 50300265 | SEAL COAT CONC | 17.2 | CU YD | $570.00 | $631.00 | |
| 35 | 50300300 | PROTECTIVE COAT | 1,070 | SQ YD | $2.00 | $2.75 | |
| 36 | 50500405 | F & E STRUCT STEEL | 16,450 | POUND | $24.50 | $19.00 | |
| 37 | 50500505 | STUD SHEAR CONNECTORS | 3,420 | EACH | $5.00 | $5.90 | |
| 38 | 50800205 | REINF BARS, EPOXY CTD | 89,210 | POUND | $1.40 | $1.40 | |
| 39 | 51100300 | SLOPE WALL 6 | 103 | SQ YD | $82.00 | $99.00 | |
| 40 | 51500100 | NAME PLATES | 1 | EACH | $600.00 | $590.00 | |
| 41 | 52000110 | PREF JT STRIP SEAL | 62 | FOOT | $165.00 | $280.00 | |
| 42 | 52100010 | ELAST BEARING ASSY T1 | 15 | EACH | $2,100.00 | $1,850.00 | |
| 43 | 52100520 | ANCHOR BOLTS 1 | 46 | EACH | $616.00 | $525.00 | |
| 44 | 58600101 | GRANULAR BACKFILL STR | 90 | CU YD | $158.00 | $72.65 | |
| 45 | 58700300 | CONCRETE SEALER | 92 | SQ FT | $5.00 | $1.35 | |
| 46 | 59100100 | GEOCOMPOSITE WALL DR | 71 | SQ YD | $22.00 | $30.50 | |
| 47 | 63000001 | SPBGR TY A 6FT POSTS | 600 | FOOT | $27.00 | $20.00 | |
| 48 | 63100045 | TRAF BAR TERM T2 | 1 | EACH | $1,540.00 | $1,250.00 | |
| 49 | 63100070 | TRAF BAR TERM T5 | 1 | EACH | $1,300.00 | $950.00 | |
| 50 | 63100085 | TRAF BAR TERM T6 | 3 | EACH | $4,000.00 | $3,000.00 | |
| 51 | 63100167 | TR BAR TRM T1 SPL TAN | 2 | EACH | $3,700.00 | $3,000.00 | |
| 52 | 63200310 | GUARDRAIL REMOV | 925 | FOOT | $8.00 | $5.00 | |
| 53 | 67100100 | MOBILIZATION | 1 | L SUM | $110,000.00 | $105,000.00 | |
| 54 | 72501000 | TERMINAL MARKER - DA | 2 | EACH | $48.00 | $50.00 | |
| 55 | 78001110 | PAINT PVT MK LINE 4 | 2,980 | FOOT | $1.00 | $1.00 |