(38-6,38-5)RS,BRR,CLV
Bidders 1
| # | Contractor | Total bid | vs estimate | vs low |
|---|---|---|---|---|
| EE | Engineer's estimate | — | ||
| 1 | Iroquois Paving Corporation Low bidder | $27,992,940 |
| Seq | Bid code | Description | Qty | Unit | Estimate | #1 Iroquois Paving… |
|---|---|---|---|---|---|---|
| 1 | X0326208 | ALTERNATE RTE SIGNING | 1 | L SUM | $25,000.00 | |
| 2 | X0328004 | REAL-TIME TR CTRL SU | 280 | WEEK | $225.00 | |
| 3 | X1200207 | REM & RELAY P C SPL | 74 | FOOT | $287.00 | |
| 4 | X2700001 | TEMP RUMBLE STRIPS SP | 4 | EACH | $1,200.00 | |
| 5 | X4400500 | COMB C&G REMOV SPL | 308 | FOOT | $85.00 | |
| 6 | X4401198 | HMA SURF REM VAR DP | 3,284 | SQ YD | $7.75 | |
| 7 | X4405020 | LONG PAR DEP REM 2 | 5,416 | FOOT | $12.75 | |
| 8 | X4420900 | LONG PART DEPTH PATCH | 135 | TON | $265.00 | |
| 9 | X6015000 | REM CONC HDWL P DRNS | 12 | EACH | $750.00 | |
| 10 | X6350120 | DELINEATOR REMOVAL | 659 | EACH | $15.00 | |
| 11 | X6350204 | LINEAR DELIN PANELS 4 | 36 | EACH | $70.00 | |
| 12 | X6350206 | LINEAR DELIN PANELS 6 | 60 | EACH | $100.00 | |
| 13 | X7010208 | TC-PROT 701402 SPL | 1 | EACH | $580,000.00 | |
| 14 | X7010237 | CHANGE MESSAGE SN SPL | 2,744 | CAL DA | $40.00 | |
| 15 | X7260100 | MILE POST MKR ASSY SP | 14 | EACH | $475.00 | |
| 16 | X8570002 | SMART TRAF MONIT SYS | 56 | CAL WK | $1,500.00 | |
| 17 | X8570004 | SMART TRAF MONIT DEV | 280 | CAL WK | $100.00 | |
| 18 | Z0013798 | CONSTRUCTION LAYOUT | 1 | L SUM | $150,000.00 | |
| 19 | Z0034105 | MATL TRANSFER DEVICE | 56,786 | TON | $15.00 | |
| 20 | Z0040530 | PIPE UNDERDRAIN REMOV | 320 | FOOT | $25.00 | |
| 21 | Z0048665 | RR PROT LIABILITY INS | 1 | L SUM | $10,000.00 | |
| 22 | Z0076600 | TRAINEES | 2,000 | HOUR | $0.8000 | |
| 23 | Z0076604 | TRAINEES TPG | 2,000 | HOUR | $15.00 | |
| 24 | 20100110 | TREE REMOV 6-15 | 20 | UNIT | $100.00 | |
| 25 | 20100210 | TREE REMOV OVER 15 | 20 | UNIT | $130.00 | |
| 26 | 20200100 | EARTH EXCAVATION | 733.2 | CU YD | $95.00 | |
| 27 | 20400800 | FURNISHED EXCAVATION | 1,059.3 | CU YD | $85.00 | |
| 28 | 20800150 | TRENCH BACKFILL | 86.9 | CU YD | $85.00 | |
| 29 | 21400100 | GRADING & SHAP DITCH | 2,590 | FOOT | $28.00 | |
| 30 | 25000210 | SEEDING CL 2A | 0.75 | ACRE | $5,500.00 | |
| 31 | 25000400 | NITROGEN FERT NUTR | 72 | POUND | $4.00 | |
| 32 | 25000500 | PHOSPHORUS FERT NUTR | 72 | POUND | $4.00 | |
| 33 | 25000600 | POTASSIUM FERT NUTR | 72 | POUND | $4.00 | |
| 34 | 25100630 | EROSION CONTR BLANKET | 3,316 | SQ YD | $2.00 | |
| 35 | 28100105 | STONE RIPRAP CL A3 | 1,167 | SQ YD | $125.00 | |
| 36 | 28100107 | STONE RIPRAP CL A4 | 24 | SQ YD | $150.00 | |
| 37 | 28200200 | FILTER FABRIC | 1,191 | SQ YD | $6.00 | |
| 38 | 30300112 | AGG SUBGRADE IMPR 12 | 11,732 | SQ YD | $26.50 | |
| 39 | 31100300 | SUB GRAN MAT A 4 | 2,432 | SQ YD | $15.00 | |
| 40 | 40600290 | BIT MATLS TACK CT | 265,631 | POUND | $1.00 | |
| 41 | 40600370 | LONG JOINT SEALANT | 257,831 | FOOT | $2.85 | |
| 42 | 40600372 | LNG JNT SLNT HALF WD | 33,680 | FOOT | $2.55 | |
| 43 | 40600400 | MIX CR JTS FLANGEWYS | 109 | TON | $0.0100 | |
| 44 | 40600990 | TEMPORARY RAMP | 546 | SQ YD | $0.0100 | |
| 45 | 40603200 | P HMA BC IL-4.75 N50 | 6,575 | TON | $145.00 | |
| 46 | 40603209 | P HMA BC IL-9.5 N90 | 11,385 | TON | $125.00 | |
| 47 | 40603235 | P HMA BC IL19.0 N70 | 24,966 | TON | $120.00 | |
| 48 | 40603240 | P HMA BC IL19.0 N90 | 13,198 | TON | $120.00 | |
| 49 | 40604162 | P HMA SC IL-9.5 D N70 | 14,689 | TON | $115.00 | |
| 50 | 40605034 | P SC SMA 12.5 E N80 | 25,628 | TON | $150.00 | |
| 51 | 44000155 | HMA SURF REM 1 1/2 | 29,938 | SQ YD | $1.85 | |
| 52 | 44000157 | HMA SURF REM 2 | 129,108 | SQ YD | $2.00 | |
| 53 | 44000158 | HMA SURF REM 2 1/4 | 29,939 | SQ YD | $2.25 | |
| 54 | 44000162 | HMA SURF REM 3 1/4 | 28,359 | SQ YD | $5.75 | |
| 55 | 44000166 | HMA SURF REM 4 1/4 | 106,787 | SQ YD | $6.75 | |
| 56 | 44000167 | HMA SURF REM 4 1/2 | 46,340 | SQ YD | $7.15 | |
| 57 | 44000170 | HMA SURF REM 5 1/4 | 46,095 | SQ YD | $7.50 | |
| 58 | 44000182 | HMA SURF REM 8 | 64,429 | SQ YD | $9.45 | |
| 59 | 44004250 | PAVED SHLD REMOVAL | 1,467 | SQ YD | $35.00 | |
| 60 | 44200583 | CL A PATCH T4 12 | 11,732 | SQ YD | $192.00 | |
| 61 | 44200610 | CL A PATCH T2 13 | 295 | SQ YD | $265.00 | |
| 62 | 44200612 | CL A PATCH T3 13 | 56 | SQ YD | $265.00 | |
| 63 | 44200614 | CL A PATCH T4 13 | 267 | SQ YD | $265.00 | |
| 64 | 44200630 | CL A PATCH T2 15 | 254 | SQ YD | $285.00 | |
| 65 | 44200631 | CL A PATCH T3 15 | 32 | SQ YD | $285.00 | |
| 66 | 44200632 | CL A PATCH T4 15 | 321 | SQ YD | $285.00 | |
| 67 | 44201423 | CL C PATCH T1 16 | 6 | SQ YD | $925.00 | |
| 68 | 44201769 | CL D PATCH T3 10 | 272 | SQ YD | $245.00 | |
| 69 | 44213000 | PATCH REINFORCEMENT | 12,955 | SQ YD | $72.50 | |
| 70 | 44213200 | SAW CUTS | 16,984 | FOOT | $2.00 | |
| 71 | 44213202 | TIE BARS 1 | 1,794 | EACH | $12.00 | |
| 72 | 44213204 | TIE BARS 3/4 | 3,045 | EACH | $10.00 | |
| 73 | 48102100 | AGG WEDGE SHLD TYPE B | 1,046 | TON | $38.00 | |
| 74 | 50104400 | CONC HEADWALL REMOVAL | 7 | EACH | $600.00 | |
| 75 | 50105220 | PIPE CULVERT REMOV | 118 | FOOT | $85.00 | |
| 76 | 542D1909 | P CUL CL D 3 24 | 108 | FOOT | $130.00 | |
| 77 | 54213465 | END SECTIONS 30 | 3 | EACH | $1,500.00 | |
| 78 | 54213669 | PRC FLAR END SEC 24 | 4 | EACH | $2,400.00 | |
| 79 | 54213681 | PRC FLAR END SEC 36 | 2 | EACH | $2,800.00 | |
| 80 | 54260315 | TRVRS PIPE GRT CON ES | 60 | FOOT | $135.00 | |
| 81 | 54262724 | METAL FL END SEC 24" | 2 | EACH | $1,200.00 | |
| 82 | 54390230 | INSERT CUL LIN 36 | 354 | FOOT | $425.00 | |
| 83 | 60100060 | CONC HDWL FOR P DRAIN | 19 | EACH | $825.00 | |
| 84 | 60108100 | PIPE UNDERDRAIN 4 SP | 480 | FOOT | $85.00 | |
| 85 | 60108501 | PIPE UNDERDR T 3 | 8,800 | FOOT | $22.50 | |
| 86 | 60500060 | REMOV INLETS | 18 | EACH | $1,000.00 | |
| 87 | 60500090 | REM INLET- MAIN FLOW | 2 | EACH | $2,500.00 | |
| 88 | 60920024 | PIPE CULV CLEANED 24 | 66 | FOOT | $115.00 | |
| 89 | 63500105 | DELINEATORS | 567 | EACH | $80.00 | |
| 90 | 64200116 | SHOULDER RUM STRIP 16 | 65,328 | FOOT | $0.5500 | |
| 91 | 66900200 | NON SPL WASTE DISPOSL | 739 | CU YD | $115.00 | |
| 92 | 66900530 | SOIL DISPOSAL ANALY | 4 | EACH | $1,500.00 | |
| 93 | 66901001 | REG SUB P-CONST PLAN | 1 | L SUM | $2,400.00 | |
| 94 | 66901003 | REG SUB F CON REPORT | 1 | L SUM | $2,500.00 | |
| 95 | 66901006 | REG SUB MON | 8 | CAL DA | $1,750.00 | |
| 96 | 67000400 | ENGR FIELD OFFICE A | 12 | CAL MO | $4,000.00 | |
| 97 | 67100100 | MOBILIZATION | 1 | L SUM | $1,679,000.00 | |
| 98 | 70100205 | TRAF CONT-PROT 701401 | 1 | EACH | $100.00 | |
| 99 | 70100420 | TRAF CONT-PROT 701411 | 8 | EACH | $100.00 | |
| 100 | 70100825 | TRAF CONT-PROT 701456 | 1 | L SUM | $187,000.00 | |
| 101 | 70103815 | TR CONT SURVEILLANCE | 140 | CAL DA | $0.0100 | |
| 102 | 70107025 | CHANGEABLE MESSAGE SN | 1,176 | CAL DA | $50.00 | |
| 103 | 70300100 | SHORT TERM PAVT MKING | 170,470 | FOOT | $1.00 | |
| 104 | 70300150 | SHRT TRM PAVT MK REM | 321,878 | SQ FT | $0.4000 | |
| 105 | 70307120 | TEMP PVT MK L4 T4 TAPE | 795,161 | FOOT | $1.15 | |
| 106 | 70400100 | TEMP CONC BARRIER | 5,325 | FOOT | $45.00 | |
| 107 | 70400200 | REL TEMP CONC BARRIER | 5,325 | FOOT | $15.00 | |
| 108 | 70600250 | IMP ATTN TEMP NRD TL3 | 4 | EACH | $4,500.00 | |
| 109 | 70600350 | IMP ATTN REL NRD TL3 | 4 | EACH | $1,700.00 | |
| 110 | 72000300 | SIGN PANEL T3 | 2,332 | SQ FT | $28.00 | |
| 111 | 72400100 | REMOV SIN PAN ASSY TA | 14 | EACH | $78.00 | |
| 112 | 72400330 | REMOV SIGN PANEL T3 | 2,245 | SQ FT | $8.00 | |
| 113 | 72700100 | STR STL SIN SUP BA | 25,611 | POUND | $5.70 | |
| 114 | 72800100 | TELES STL SIN SUPPORT | 210 | FOOT | $16.50 | |
| 115 | 73700100 | REM GR MT SIN SUPPORT | 12 | EACH | $245.00 | |
| 116 | 73700200 | REM CONC FDN-GR MT | 12 | EACH | $925.00 | |
| 117 | 78000600 | THPL PVT MK LINE 12 | 1,063 | FOOT | $8.25 | |
| 118 | 78000650 | THPL PVT MK LINE 24 | 204 | FOOT | $18.75 | |
| 119 | 78004600 | PREF PL PM TD STD LTR/SYM | 222 | SQ FT | $58.50 | |
| 120 | 78004620 | PREF PL PM TD STD L4 | 20,146 | FOOT | $3.55 | |
| 121 | 78004640 | PREF PL PM TD STD L 8 | 28,283 | FOOT | $7.95 | |
| 122 | 78005110 | EPOXY PVT MK LINE 4 | 281,180 | FOOT | $0.5500 | |
| 123 | 78011000 | GRV RCSD PM LTR & SYM | 222 | SQ FT | $6.25 | |
| 124 | 78011025 | GRV RCSD PVT MRKG 5 | 299,592 | FOOT | $0.4000 | |
| 125 | 78011045 | GRV RCSD PVT MRKG 9 | 27,869 | FOOT | $0.6500 | |
| 126 | 78011065 | GRV RCSD PVT MRKG 13 | 732 | FOOT | $4.25 | |
| 127 | 78011125 | GRV RCSD PVT MRKG 25 | 204 | FOOT | $6.00 | |
| 128 | 78100100 | RAISED REFL PAVT MKR | 1,486 | EACH | $55.00 | |
| 129 | 78200011 | BARR WALL REF TYPE C | 428 | EACH | $10.00 | |
| 130 | 78300200 | RAISED REF PVT MK REM | 1,044 | EACH | $0.0100 |