$7,605.52Avg low bid / L SUM
$7,221.94Avg of all bids
—Avg engineer's estimate
319Jobs · 319 L SUM
Average low bid by year
| Year | Jobs | Quantity | Avg low | Avg all |
|---|---|---|---|---|
| 2026 | 38 | 38 | $8,081.40 | $10,738.97 |
| 2025 | 46 | 46 | $6,851.13 | $7,167.28 |
| 2024 | 31 | 31 | $14,293.31 | $9,956.22 |
| 2023 | 36 | 36 | $7,360.80 | $6,170.27 |
| 2022 | 39 | 39 | $9,084.00 | $8,218.38 |
| 2021 | 25 | 25 | $7,742.26 | $7,858.74 |
| 2020 | 44 | 44 | $7,174.71 | $6,344.60 |
| 2019 | 29 | 29 | $6,121.16 | $5,078.62 |
| 2018 | 31 | 31 | $1,767.75 | $4,152.03 |
| Let date | Contract | County / District | Quantity | Unit price | Low bidder |
|---|---|---|---|---|---|
| Sep 18, 2026 | 66T15 | LasalleDistrict 3 | 1 L SUM | $80,000.00 | ROADSAFE TRAFFIC SYSTEMS, INC. |
| Sep 18, 2026 | 74D06 | WayneDistrict 7 | 1 L SUM | $5,000.00 | Samron Midwest Contracting, Inc. |
| Jul 31, 2026 | 72372 | Logan, MontgomeryDistrict 6 | 1 L SUM | $100.00 | Freehill Asphalt, Inc. |
| Jul 31, 2026 | 72E86 | SangamonDistrict 6 | 1 L SUM | $4,502.97 | Truman L. Flatt & Sons Co., Inc. |
| Jul 31, 2026 | 66T35 | KankakeeDistrict 3 | 1 L SUM | $12,500.00 | Laser Electric, Inc. |
| Jul 31, 2026 | 72E81 | Hancock, PikeDistrict 6 | 1 L SUM | $1,250.00 | Capitol Construction Group, LLC d/b/a Egizii Electric |
| Jun 12, 2026 | 76U81 | Madison, St. ClairDistrict 8 | 1 L SUM | $5,000.00 | M & M Concrete, Inc. |
| Jun 12, 2026 | 66T45 | LasalleDistrict 3 | 1 L SUM | $500.00 | G. M. Sipes Construction, Inc. |
| Jun 12, 2026 | 76V17 | MadisonDistrict 8 | 1 L SUM | $0.0200 | The Kilian Corporation & Christ Brothers Asphalt & Keeley & Sons, Inc. tri-venture |
| Jun 12, 2026 | 68J15 | TazewellDistrict 4 | 1 L SUM | $0.0100 | R. A. Cullinan and Son, a div of UCM, Inc. |
| Jun 12, 2026 | 72509 | LoganDistrict 6 | 1 L SUM | $11,546.64 | Bodine Electric of Decatur |
| Jun 12, 2026 | 70H86 | ChampaignDistrict 5 | 1 L SUM | $20,000.00 | Cross Construction, Inc. |
| Jun 12, 2026 | 64V40 | Rock IslandDistrict 2 | 1 L SUM | $7,500.00 | Valley Construction Co. |
| Jun 12, 2026 | 74D55 | MaconDistrict 7 | 1 L SUM | $21,058.80 | Illinois Valley Paving, a div of UCM, Inc. |
| Jun 12, 2026 | 66A91 | LasalleDistrict 3 | 1 L SUM | $5,000.00 | Advanced Asphalt Company |
| Jun 12, 2026 | 76M95 | WashingtonDistrict 8 | 1 L SUM | $25,000.00 | Samron Midwest Contracting, Inc. |
| Jun 12, 2026 | 66T39 | LasalleDistrict 3 | 1 L SUM | $0.0100 | G. M. Sipes Construction, Inc. |
| Apr 24, 2026 | 68H43 | VariousDistrict 4 | 1 L SUM | $1,000.00 | All States Painting, Inc. |
| Apr 24, 2026 | 70H82 | McleanDistrict 5 | 1 L SUM | $9,200.00 | Stark Excavating, Inc. |
| Apr 24, 2026 | 74E20 | LawrenceDistrict 7 | 1 L SUM | $1.00 | Beniach Construction Co., Inc. |
| Feb 27, 2026 | 74D47 | Effingham, FayetteDistrict 7 | 1 L SUM | $500.00 | All States Painting, Inc. |
| Feb 27, 2026 | 64R72 | WinnebagoDistrict 2 | 1 L SUM | $1.00 | Civil Constructors, Inc. d/b/a/ Helm Civil |
| Feb 27, 2026 | 76U42 | MadisonDistrict 8 | 1 L SUM | $600.00 | Microsurfacing Contractors, LLC, a Division of Byrne and Jones Holding Company |
| Feb 27, 2026 | 64U03 | Lasalle, LeeDistrict 2 | 1 L SUM | $1.00 | Rock Road Companies, Inc. |
| Feb 27, 2026 | 64V13 | Winnebago, BooneDistrict 2 | 1 L SUM | $50.00 | M & M Concrete, Inc. |
| Feb 27, 2026 | 68474 | PeoriaDistrict 4 | 1 L SUM | $6,578.00 | R. A. Cullinan and Son, a div of UCM, Inc. |
| Feb 27, 2026 | 72C96 | SangamonDistrict 6 | 1 L SUM | $28,325.00 | Illinois Valley Paving, a div of UCM, Inc. |
| Jan 16, 2026 | 72732 | MorganDistrict 6 | 1 L SUM | $7,929.57 | Freesen, a div of UCM, Inc. |
| Jan 16, 2026 | 74D37 | EffinghamDistrict 7 | 1 L SUM | $2,760.00 | Capitol Construction Group, LLC d/b/a Egizii Electric |
| Jan 16, 2026 | 66R77 | VariousDistrict 3 | 1 L SUM | $150.00 | M & M Concrete, Inc. |
| Jan 16, 2026 | 76U95 | St.clairDistrict 8 | 1 L SUM | $7,500.00 | The Kilian Corporation |
| Jan 16, 2026 | 68F92 | TazewellDistrict 4 | 1 L SUM | $330.00 | R. A. Cullinan and Son, a div of UCM, Inc. |
| Jan 16, 2026 | 64U20 | WhitesideDistrict 2 | 1 L SUM | $1.00 | Civil Constructors, Inc. d/b/a/ Helm Civil |
| Jan 16, 2026 | 72777 | VariousDistrict 6 | 1 L SUM | $1,500.00 | SKC Construction, Inc. |
| Jan 16, 2026 | 72K24 | Logan, SangamonDistrict 6 | 1 L SUM | $400.00 | All States Painting, Inc. |
| Jan 16, 2026 | 74893 | EffinghamDistrict 7 | 1 L SUM | $602.50 | William Charles Construction Company, LLC |
| Jan 16, 2026 | 74B50 | MaconDistrict 7 | 1 L SUM | $16,202.35 | Illinois Valley Paving, a div of UCM, Inc. |
| Jan 16, 2026 | 74C61 | Clay, EffinghamDistrict 7 | 1 L SUM | $24,503.20 | Howell Paving, Inc. |
| Nov 7, 2025 | 64U82 | HenryDistrict 2 | 1 L SUM | $7,500.00 | Advanced Asphalt Company |
| Nov 7, 2025 | 78B64 | VariousDistrict 9 | 1 L SUM | $250.00 | M & M Concrete, Inc. |
| Nov 7, 2025 | 78B42 | UnionDistrict 9 | 1 L SUM | $3,900.00 | Samron Midwest Contracting, Inc. |
| Sep 19, 2025 | 64U54 | Rock IslandDistrict 2 | 1 L SUM | $19,000.00 | Homer Tree Service, Inc. |
| Sep 19, 2025 | 68J20 | VariousDistrict 4 | 1 L SUM | $5,200.00 | Hoerr Construction, Inc. |
| Sep 19, 2025 | 72977 | LoganDistrict 6 | 1 L SUM | $10,922.12 | Bodine Electric of Decatur |
| Sep 19, 2025 | 74597 | CumberlandDistrict 7 | 1 L SUM | $5,747.96 | William Charles Construction Company, LLC |
| Sep 19, 2025 | 70H51 | McleanDistrict 5 | 1 L SUM | $5,000.00 | Champaign Signal and Lighting Co. a division of Evergreen Roadworks, LLC |
| Aug 1, 2025 | 68B70 | PeoriaDistrict 4 | 1 L SUM | $1,942.37 | Otto Baum Company, Inc. |
| Aug 1, 2025 | 76M55 | St.clairDistrict 8 | 1 L SUM | $204.00 | Keeley & Sons, Inc. |
| Aug 1, 2025 | 68510 | HenryDistrict 4 | 1 L SUM | $100.00 | IHC Construction Companies, L.L.C. |
| Aug 1, 2025 | 64C24 | WinnebagoDistrict 2 | 1 L SUM | $5,050.51 | OHLA Central, Inc. |
| Jun 13, 2025 | 66R47 | LasalleDistrict 3 | 1 L SUM | $0.0100 | G. M. Sipes Construction, Inc. |
| Jun 13, 2025 | 66H59 | IroquoisDistrict 3 | 1 L SUM | $15,000.00 | Iroquois Paving Corporation |
| Jun 13, 2025 | 74C97 | MaconDistrict 7 | 1 L SUM | $1,911.68 | Bodine Electric of Decatur |
| Jun 13, 2025 | 66N36 | LasalleDistrict 3 | 1 L SUM | $0.0100 | D. Construction, Inc. |
| Jun 13, 2025 | 76K74 | St.clairDistrict 8 | 1 L SUM | $102.00 | Keeley & Sons, Inc. Keller Construction Inc. |
| Jun 13, 2025 | 66R32 | BureauDistrict 3 | 1 L SUM | $5,000.00 | Advanced Asphalt Company |
| Jun 13, 2025 | 74D45 | ColesDistrict 7 | 1 L SUM | $22,366.37 | Howell Paving, Inc. |
| Jun 13, 2025 | 64M38 | WinnebagoDistrict 2 | 1 L SUM | $1.00 | Rock Road Companies, Inc. |
| Jun 13, 2025 | 76F82 | Madison, St.clairDistrict 8 | 1 L SUM | $6,000.00 | Haier Plumbing and Heating, Inc. |
| Jun 13, 2025 | 64R16 | Rock IslandDistrict 2 | 1 L SUM | $100.00 | Advanced Asphalt Company |
| Apr 25, 2025 | 66R12 | Lasalle, GrundyDistrict 3 | 1 L SUM | $0.0100 | D. Construction, Inc. |
| Apr 25, 2025 | 76U30 | St.clairDistrict 8 | 1 L SUM | $5,100.00 | Keeley & Sons, Inc. |
| Apr 25, 2025 | 66R19 | BureauDistrict 3 | 1 L SUM | $500.00 | Advanced Asphalt Company |
| Apr 25, 2025 | 78A80 | PulaskiDistrict 9 | 1 L SUM | $25,060.98 | E. T. Simonds Construction Company |
| Apr 25, 2025 | 66R35 | KankakeeDistrict 3 | 1 L SUM | $50,000.00 | Kankakee Valley Construction Co., Inc. & Gallagher Asphalt Corporation |
| Apr 25, 2025 | 78B17 | Alexander, PulaskiDistrict 9 | 1 L SUM | $4,000.00 | Kinney Contractors, Inc. |
| Apr 25, 2025 | 66R36 | LasalleDistrict 3 | 1 L SUM | $10,000.00 | Advanced Asphalt Company |
| Apr 25, 2025 | 64N98 | OgleDistrict 2 | 1 L SUM | $7,683.39 | William Charles Construction Company, LLC |
| Apr 25, 2025 | 70H39 | McleanDistrict 5 | 1 L SUM | $11,000.00 | Rowe Construction, a div of UCM, Inc. |
| Apr 25, 2025 | 66R11 | LasalleDistrict 3 | 1 L SUM | $500.00 | Phoenix Corporation of the Quad Cities |
| Apr 25, 2025 | 70H42 | ChampaignDistrict 5 | 1 L SUM | $6,000.00 | Kinney Contractors, Inc. |
| Mar 7, 2025 | 66R34 | IroquoisDistrict 3 | 1 L SUM | $2,500.00 | Iroquois Paving Corporation |
| Mar 7, 2025 | 68H31 | TazewellDistrict 4 | 1 L SUM | $1,000.00 | All States Painting, Inc. |
| Mar 7, 2025 | 76R99 | St. ClairDistrict 8 | 1 L SUM | $54,000.00 | The Kilian Corporation and Christ Brothers Asphalt |
| Mar 7, 2025 | 64U09 | Winnebago, BooneDistrict 2 | 1 L SUM | $100.00 | Pressure Washing Unlimited Inc. |
| Mar 7, 2025 | 64U10 | VariousDistrict 2 | 1 L SUM | $150.00 | Pressure Washing Unlimited Inc. |
| Mar 7, 2025 | 62W60 | Cook, DupageDistrict 1 | 1 L SUM | $147.77 | H & H Electric Co. |
| Jan 17, 2025 | 64T93 | VariousDistrict 2 | 1 L SUM | $25.00 | M & M Concrete, Inc. |
| Jan 17, 2025 | 66P90 | Bureau, LivingstonDistrict 3 | 1 L SUM | $50.00 | M & M Concrete, Inc. |
| Jan 17, 2025 | 72934 | Adams, PikeDistrict 6 | 1 L SUM | $0.0100 | G. M. Sipes Construction, Inc. |
| Jan 17, 2025 | 72D00 | Montgomery, MacoupinDistrict 6 | 1 L SUM | $13,035.63 | Illinois Valley Paving, a div of UCM, Inc. |
| Jan 17, 2025 | 74D23 | ClarkDistrict 7 | 1 L SUM | $8,000.00 | Kinney Contractors, Inc. |
| Jan 17, 2025 | 64T04 | OgleDistrict 2 | 1 L SUM | $1.01 | William Charles Construction Co, LLC |
| Jan 17, 2025 | 78A75 | VariousDistrict 9 | 1 L SUM | $1,000.00 | Venus Painting Co. |
| Dec 13, 2024 | 64N05 | HenryDistrict 2 | 1 L SUM | $100.00 | Civil Constructors d/b/a Helm Civil and Phoenix Corporation of the Quad Cities |
| Dec 13, 2024 | 72M81 | SangamonDistrict 6 | 1 L SUM | $18,452.50 | Illinois Valley Paving, a div of UCM, Inc. |
| Sep 20, 2024 | 66P50 | LasalleDistrict 3 | 1 L SUM | $0.0100 | G. M. Sipes Construction, Inc. |
| Aug 2, 2024 | 66K82 | Bureau, LasalleDistrict 3 | 1 L SUM | $10,000.00 | Advanced Asphalt Company |
| Jun 14, 2024 | 74C94 | ColesDistrict 7 | 1 L SUM | $6,000.00 | Kinney Contractors, Inc. |
| Jun 14, 2024 | 64S92 | WinnebagoDistrict 2 | 1 L SUM | $25,000.00 | Homer Tree Service, Inc. |
| Jun 14, 2024 | 76T47 | St ClairDistrict 8 | 1 L SUM | $5,000.00 | Hank's Excavating & Landscaping, Inc. |
| Jun 14, 2024 | 64T25 | HenryDistrict 2 | 1 L SUM | $5,350.00 | Davenport Electric Contract Company |
| Jun 14, 2024 | 66H56 | LivingstonDistrict 3 | 1 L SUM | $12,200.00 | Kankakee Valley Construction Company, Inc. |
| Jun 14, 2024 | 72726 | MorganDistrict 6 | 1 L SUM | $5,600.00 | Kinney Contractors, Inc. |
| Jun 14, 2024 | 74C87 | EffinghamDistrict 7 | 1 L SUM | $36,000.00 | Kinney Contractors, Inc. |
| Jun 14, 2024 | 64R99 | OgleDistrict 2 | 1 L SUM | $1.00 | Rock Road Companies, Inc. |
| Apr 26, 2024 | 76T54 | Madison, JerseyDistrict 8 | 1 L SUM | $0.0100 | Charles E. Mahoney Co. |
| Apr 26, 2024 | 68H27 | VariousDistrict 4 | 1 L SUM | $150.00 | M & M Concrete, Inc. |
| Apr 26, 2024 | 72304 | MontgomeryDistrict 6 | 1 L SUM | $31,082.54 | Illinois Valley Paving, a div of UCM, Inc. |
| Apr 26, 2024 | 74B18 | MaconDistrict 7 | 1 L SUM | $2,752.72 | Illinois Valley Paving, a div of UCM, Inc. |
| Apr 26, 2024 | 74C82 | MaconDistrict 7 | 1 L SUM | $3,584.40 | Bodine Electric of Decatur |
| Mar 8, 2024 | 66H62 | IroquoisDistrict 3 | 1 L SUM | $187,000.00 | Iroquois Paving Corporation |
| Mar 8, 2024 | 64S34 | VariousDistrict 2 | 1 L SUM | $50.00 | M & M Concrete, Inc. |
| Mar 8, 2024 | 64S36 | Boone, WinnebagoDistrict 2 | 1 L SUM | $50.00 | M & M Concrete, Inc. |
| Mar 8, 2024 | 72233 | VariousDistrict 6 | 1 L SUM | $5.00 | M & M Concrete, Inc. |
| Mar 8, 2024 | 64P41 | Bureau, WhitesideDistrict 2 | 1 L SUM | $2.00 | Martin & Company Excavating |
| Jan 19, 2024 | 72722 | SangamonDistrict 6 | 1 L SUM | $10,000.00 | Kinney Contractors, Inc. |
| Jan 19, 2024 | 64R56 | OgleDistrict 2 | 1 L SUM | $32,830.05 | Helm Electric Facility Solutions, Inc. d/b/a Helm Electric |
| Jan 19, 2024 | 64S54 | VariousDistrict 2 | 1 L SUM | $50.00 | M & M Concrete, Inc. |
| Jan 19, 2024 | 72791 | LoganDistrict 6 | 1 L SUM | $8,332.50 | Illinois Valley Paving, a div of UCM, Inc. |
| Jan 19, 2024 | 66N48 | GrundyDistrict 3 | 1 L SUM | $40,000.00 | D. Construction, Inc. |
| Jan 19, 2024 | 64R71 | WinnebagoDistrict 2 | 1 L SUM | $500.00 | Plote Construction, Inc. |
| Jan 19, 2024 | 66N59 | LasalleDistrict 3 | 1 L SUM | $0.0100 | D. Construction, Inc. |
| Jan 19, 2024 | 70H00 | ChampaignDistrict 5 | 1 L SUM | $1,000.00 | Champaign Signal and Lighting Co. A Division of Champaign Asphalt Company LLC |
| Jan 19, 2024 | 68D83 | KnoxDistrict 4 | 1 L SUM | $2,000.00 | Civil Constructors, Inc. d/b/a/ Helm Civil |
| Nov 17, 2023 | 74471 | FayetteDistrict 7 | 1 L SUM | $20,031.01 | Howell Paving, Inc. |
| Nov 17, 2023 | 46629 | St Clair, MadisonDistrict 8 | 1 L SUM | $425.00 | Kujo, Inc. |
| Sep 22, 2023 | 74828 | MaconDistrict 7 | 1 L SUM | $13,031.76 | Illinois Valley Paving, a div of UCM, Inc. |
| Jun 16, 2023 | 76R69 | MadisonDistrict 8 | 1 L SUM | $2,100.00 | The Kilian Corporation |
| Jun 16, 2023 | 64R58 | LeeDistrict 2 | 1 L SUM | $121.52 | William Charles Construction Co, LLC |
| Jun 16, 2023 | 78599 | Johnson, UnionDistrict 9 | 1 L SUM | $0.0100 | Plote Construction, Inc. |
| Jun 16, 2023 | 70G15 | McleanDistrict 5 | 1 L SUM | $5,679.93 | Rowe Construction, a div of UCM, Inc. |
| Jun 16, 2023 | 78912 | Johnson, WilliamsonDistrict 9 | 1 L SUM | $26,000.00 | Samron Midwest Contracting, Inc. |
| Jun 16, 2023 | 74C05 | CumberlandDistrict 7 | 1 L SUM | $9,320.49 | Howell Paving, Inc. |
| Jun 16, 2023 | 64B13 | WinnebagoDistrict 2 | 1 L SUM | $2,500.00 | Curran Contracting Company and Civil Constructors, Inc. d/b/a Helm Civil Joint Venture |
| Jun 16, 2023 | 68F89 | Henry, KnoxDistrict 4 | 1 L SUM | $10,428.29 | Gunther Construction & Advanced Asphalt Company JV |
| Jun 16, 2023 | 76R00 | St ClairDistrict 8 | 1 L SUM | $0.0100 | Electrico, Inc. |
| Jun 16, 2023 | 76R40 | MadisonDistrict 8 | 1 L SUM | $27,500.00 | The Kilian Corporation |
| Jun 16, 2023 | 68H58 | VariousDistrict 4 | 1 L SUM | $100.00 | Eagle Painting & Maintenance Company, Inc. |
| Jun 16, 2023 | 76R01 | St ClairDistrict 8 | 1 L SUM | $0.0100 | Electrico, Inc. |
| Jun 16, 2023 | 64R57 | WinnebagoDistrict 2 | 1 L SUM | $100.00 | William Charles Construction Co, LLC |
| Jun 16, 2023 | 72A75 | SangamonDistrict 6 | 1 L SUM | $19,470.00 | Illinois Valley Paving, a div of UCM, Inc. |
| Apr 28, 2023 | 70E17 | McleanDistrict 5 | 1 L SUM | $48,878.72 | Rowe Construction, a div of UCM, Inc. |
| Apr 28, 2023 | 64P59 | Rock IslandDistrict 2 | 1 L SUM | $1,000.00 | Phoenix Corporation of the Quad Cities |
| Apr 28, 2023 | 76R90 | MadisonDistrict 8 | 1 L SUM | $3,865.80 | Keeley & Sons, Inc. |
| Apr 28, 2023 | 64S14 | StephensonDistrict 2 | 1 L SUM | $5,000.00 | Venus Painting Co. |
| Apr 28, 2023 | 66F93 | LivingstonDistrict 3 | 1 L SUM | $0.0100 | D. Construction, Inc. |
| Apr 28, 2023 | 66J65 | BureauDistrict 3 | 1 L SUM | $4,000.00 | Advanced Asphalt Company |
| Apr 28, 2023 | 68G52 | VariousDistrict 4 | 1 L SUM | $50.00 | M & M Concrete, Inc. |
| Mar 10, 2023 | 64M40 | WinnebagoDistrict 2 | 1 L SUM | $1.00 | Rock Road Companies, Inc. |
| Mar 10, 2023 | 66N01 | BureauDistrict 3 | 1 L SUM | $14,700.00 | Electric Conduit Construction |
| Mar 10, 2023 | 72M76 | VariousDistrict 6 | 1 L SUM | $50.00 | M & M Concrete, Inc. |
| Jan 20, 2023 | 64P43 | Rock IslandDistrict 2 | 1 L SUM | $7,000.00 | Valley Construction Co. |
| Jan 20, 2023 | 64N68 | Rock IslandDistrict 2 | 1 L SUM | $2,176.20 | Tri-City Electric Company of Iowa |
| Jan 20, 2023 | 66M66 | Lasalle, PutnamDistrict 3 | 1 L SUM | $100.00 | All States Painting, Inc. |
| Jan 20, 2023 | 64N69 | Rock IslandDistrict 2 | 1 L SUM | $2,176.20 | Tri-City Electric Company of Iowa |
| Jan 20, 2023 | 68E42 | TazewellDistrict 4 | 1 L SUM | $800.00 | Stark Excavating, Inc. |
| Jan 20, 2023 | 74987 | WayneDistrict 7 | 1 L SUM | $25,699.40 | E. T. Simonds Construction Company |
| Jan 20, 2023 | 72K64 | LoganDistrict 6 | 1 L SUM | $12,182.50 | Illinois Valley Paving, a div of UCM, Inc. |
| Jan 20, 2023 | 76R68 | MadisonDistrict 8 | 1 L SUM | $500.00 | Keeley & Sons, Inc. |