(37-24;48-24,25,26-1)RS-4
- Let date
- Friday, June 16, 2023
- Contract
- 68F89 · job page
- District
- District 4
- County
- Henry, Knox
- Highway
- Limits
- Resurfacing on I-74/IL 110 from North of Woodhull to North of US 34.
- Classification
- ·
- Project number
Bidders 1
| # | Contractor | Total bid | vs estimate | vs low |
|---|---|---|---|---|
| EE | Engineer's estimate | — | ||
| 1 | Gunther Construction & Advanced Asphalt Company JV Low bidder | $28,792,543 |
| Seq | Bid code | Description | Qty | Unit | Estimate | #1 Gunther Constru… |
|---|---|---|---|---|---|---|
| 1 | XZ013798 | CONSTR STA LAYOUT | 1 | L SUM | $11,482.46 | |
| 2 | X0320023 | CCTV DOME CAMERA HD | 1 | EACH | $3,150.00 | |
| 3 | X0325893 | CLEAN EX END SECTION | 30 | EACH | $1,260.00 | |
| 4 | X0549200 | CLEAN PAVED DITCH | 2,075 | FOOT | $11.55 | |
| 5 | X0556100 | PART DEPTH PATCH SPL | 6,957 | SQ YD | $16.11 | |
| 6 | X2600002 | RECOVERABLE DELINEATR | 472 | EACH | $113.87 | |
| 7 | X4400196 | HMA SURF REM SPL | 16,121 | SQ YD | $0.0100 | |
| 8 | X4401198 | HMA SURF REM VAR DP | 16,552 | SQ YD | $5.84 | |
| 9 | X4421000 | PARTIAL DEPTH PATCH | 1,168 | TON | $238.07 | |
| 10 | X5427602 | REMOV EX FLAR END SEC | 7 | EACH | $840.00 | |
| 11 | X6350120 | DELINEATOR REMOVAL | 115 | EACH | $51.68 | |
| 12 | X6350204 | LINEAR DELIN PANELS 4 | 160 | EACH | $69.52 | |
| 13 | X6431120 | REM IMP ATTEN SM | 14 | EACH | $2,291.95 | |
| 14 | X6650202 | WOV W FENCE REMOV | 50 | FOOT | $4.20 | |
| 15 | X7010216 | TRAF CONT & PROT SPL | 1 | L SUM | $24,360.40 | |
| 16 | X8040102 | ELECT SERV INSTALL SP | 1 | EACH | $11,550.00 | |
| 17 | Z0001002 | GDRL AGG EROS CONT | 1,884 | TON | $105.00 | |
| 18 | Z0013798 | CONSTRUCTION LAYOUT | 1 | L SUM | $25,516.55 | |
| 19 | Z0033600 | LONG JOINT REPAIR | 107,000 | FOOT | $9.37 | |
| 20 | Z0034105 | MATL TRANSFER DEVICE | 124,308 | TON | $3.41 | |
| 21 | Z0076600 | TRAINEES | 2,000 | HOUR | $0.8000 | |
| 22 | Z0076604 | TRAINEES TPG | 2,000 | HOUR | $15.00 | |
| 23 | 20100110 | TREE REMOV 6-15 | 64 | UNIT | $199.50 | |
| 24 | 20100210 | TREE REMOV OVER 15 | 111 | UNIT | $241.50 | |
| 25 | 20200600 | EXC & GR EX SHOULDER | 40 | UNIT | $525.00 | |
| 26 | 20400800 | FURNISHED EXCAVATION | 778 | CU YD | $51.45 | |
| 27 | 21101615 | TOPSOIL F & P 4 | 2,325 | SQ YD | $18.90 | |
| 28 | 21400100 | GRADING & SHAP DITCH | 4,185 | FOOT | $12.60 | |
| 29 | 25000210 | SEEDING CL 2A | 0.49 | ACRE | $13,009.51 | |
| 30 | 25000400 | NITROGEN FERT NUTR | 52 | POUND | $5.25 | |
| 31 | 25000500 | PHOSPHORUS FERT NUTR | 52 | POUND | $5.25 | |
| 32 | 25000600 | POTASSIUM FERT NUTR | 52 | POUND | $5.25 | |
| 33 | 25000750 | MOWING | 576 | ACRE | $94.50 | |
| 34 | 25100630 | EROSION CONTR BLANKET | 2,325 | SQ YD | $3.15 | |
| 35 | 28000250 | TEMP EROS CONTR SEED | 49 | POUND | $22.05 | |
| 36 | 28000305 | TEMP DITCH CHECKS | 377 | FOOT | $36.75 | |
| 37 | 28000400 | PERIMETER EROS BAR | 1,000 | FOOT | $6.30 | |
| 38 | 28000500 | INLET & PIPE PROTECT | 7 | EACH | $1,470.00 | |
| 39 | 28100225 | STONE RIPRAP CL B3 | 694 | TON | $194.25 | |
| 40 | 28100227 | STONE RIPRAP CL B4 | 47 | TON | $178.50 | |
| 41 | 28200200 | FILTER FABRIC | 106 | SQ YD | $23.10 | |
| 42 | 40600295 | P BIT MATLS TACK CT | 962,250 | POUND | $0.9100 | |
| 43 | 40600982 | HMA SURF REM BUTT JT | 9,711 | SQ YD | $16.23 | |
| 44 | 40600990 | TEMPORARY RAMP | 1,884 | SQ YD | $0.0100 | |
| 45 | 40603208 | P HMA BC IL-9.5 N70 | 1,518 | TON | $159.30 | |
| 46 | 40603209 | P HMA BC IL-9.5 N90 | 36,526 | TON | $119.95 | |
| 47 | 40604172 | P HMA SC IL-9.5 E N70 | 2,024 | TON | $160.29 | |
| 48 | 40605034 | P SC SMA 12.5 E N80 | 50,770 | TON | $158.80 | |
| 49 | 40800050 | INCIDENTAL HMA SURF | 149 | TON | $334.87 | |
| 50 | 44000151 | HMA SURF REM 1/2 | 290,450 | SQ YD | $1.86 | |
| 51 | 44000152 | HMA SURF REM 3/4 | 294,361 | SQ YD | $1.95 | |
| 52 | 44000163 | HMA SURF REM 3 1/2 | 8,867 | SQ YD | $6.55 | |
| 53 | 44000169 | HMA SURF REM 5 | 888 | SQ YD | $24.53 | |
| 54 | 44000170 | HMA SURF REM 5 1/4 | 1,412 | SQ YD | $21.04 | |
| 55 | 44004000 | PAVED DITCH REMOVAL | 750 | FOOT | $35.70 | |
| 56 | 44004250 | PAVED SHLD REMOVAL | 7 | SQ YD | $466.27 | |
| 57 | 44201815 | CL D PATCH T2 14 | 151 | SQ YD | $694.76 | |
| 58 | 48101200 | AGGREGATE SHLDS B | 14,241 | TON | $41.83 | |
| 59 | 48203100 | HMA SHOULDERS | 33,648 | TON | $109.48 | |
| 60 | 50102400 | CONC REM | 1.6 | CU YD | $945.00 | |
| 61 | 50104400 | CONC HDWL REM | 8 | EACH | $3,202.50 | |
| 62 | 50104650 | SLOPE WALL REMOV | 400 | SQ YD | $50.40 | |
| 63 | 50105220 | PIPE CULVERT REMOV | 40 | FOOT | $94.50 | |
| 64 | 51100100 | SLOPE WALL 4 | 400 | SQ YD | $231.00 | |
| 65 | 52200020 | TEMP SOIL RETEN SYSTM | 200 | SQ FT | $36.75 | |
| 66 | 542A1069 | P CUL CL A 2 24 | 16 | FOOT | $1,155.00 | |
| 67 | 54205053 | P CUL SPEC 18 | 24 | FOOT | $304.50 | |
| 68 | 54213669 | PRC FLAR END SEC 24 | 10 | EACH | $4,305.00 | |
| 69 | 54213681 | PRC FLAR END SEC 36 | 3 | EACH | $4,620.00 | |
| 70 | 54215424 | CIP RC END SEC 24 | 1 | EACH | $9,450.00 | |
| 71 | 54215466 | CIP RC END SEC 66 | 1 | EACH | $32,550.00 | |
| 72 | 54215472 | CIP RC END SEC 72 | 1 | EACH | $41,475.00 | |
| 73 | 54248510 | CONCRETE COLLAR | 17 | CU YD | $2,205.00 | |
| 74 | 60600605 | CONC CURB TB | 15 | FOOT | $210.00 | |
| 75 | 63000001 | SPBGR TY A 6FT POSTS | 9,647 | FOOT | $30.98 | |
| 76 | 63100045 | TRAF BAR TERM T2 | 18 | EACH | $1,732.50 | |
| 77 | 63100085 | TRAF BAR TERM T6 | 1 | EACH | $3,202.50 | |
| 78 | 63100089 | TRAF BAR TERM T6B | 14 | EACH | $3,097.50 | |
| 79 | 63100167 | TR BAR TRM T1 SPL TAN | 31 | EACH | $2,887.50 | |
| 80 | 63200310 | GUARDRAIL REMOV | 10,811 | FOOT | $4.20 | |
| 81 | 63500105 | DELINEATORS | 9 | EACH | $78.75 | |
| 82 | 64200116 | SHOULDER RUM STRIP 16 | 300,201 | FOOT | $0.2300 | |
| 83 | 64300450 | IMP ATTEN NRD TL3 | 14 | EACH | $7,974.75 | |
| 84 | 66500105 | WOV W FENCE 4 | 50 | FOOT | $46.20 | |
| 85 | 67000400 | ENGR FIELD OFFICE A | 18 | CAL MO | $3,076.77 | |
| 86 | 67100100 | MOBILIZATION | 1 | L SUM | $1,705,000.00 | |
| 87 | 70100420 | TRAF CONT-PROT 701411 | 4 | EACH | $2,277.44 | |
| 88 | 70100700 | TRAF CONT-PROT 701406 | 1 | L SUM | $105,061.99 | |
| 89 | 70100800 | TRAF CONT-PROT 701401 | 1 | L SUM | $481,150.00 | |
| 90 | 70100820 | TRAF CONT-PROT 701451 | 1 | L SUM | $7,072.05 | |
| 91 | 70100825 | TRAF CONT-PROT 701456 | 1 | L SUM | $10,428.29 | |
| 92 | 70103815 | TR CONT SURVEILLANCE | 6 | CAL DA | $1,575.00 | |
| 93 | 70107025 | CHANGEABLE MESSAGE SN | 28 | CAL DA | $119.87 | |
| 94 | 70300100 | SHORT TERM PAVT MKING | 52,647 | FOOT | $1.57 | |
| 95 | 70300150 | SHRT TRM PAVT MK REM | 5,967 | SQ FT | $4.54 | |
| 96 | 70300221 | TEMP PVT MK LINE 4 - PAINT | 593,148 | FOOT | $0.2500 | |
| 97 | 70300241 | TEMP PVT MK LINE 6 - PAINT | 70,940 | FOOT | $0.2700 | |
| 98 | 72501000 | TERMINAL MARKER - DA | 31 | EACH | $52.50 | |
| 99 | 78004630 | PREF PL PM TD STD LN 6 | 332,044 | FOOT | $6.52 | |
| 100 | 78004640 | PREF PL PM TD STD LN 8 | 3,035 | FOOT | $8.45 | |
| 101 | 78004660 | PREF PL PM TD STD LN 12 | 430 | FOOT | $12.20 | |
| 102 | 78011035 | GRV RCSD PVT MRKG 7 | 332,044 | FOOT | $0.5100 | |
| 103 | 78011045 | GRV RCSD PVT MRKG 9 | 3,035 | FOOT | $1.42 | |
| 104 | 78011065 | GRV RCSD PVT MRKG 13 | 430 | FOOT | $3.15 | |
| 105 | 78100100 | RAISED REFL PAVT MKR | 1,881 | EACH | $49.35 | |
| 106 | 78200005 | GRDRAIL REF TYPE A | 160 | EACH | $15.75 | |
| 107 | 78300200 | RAISED REF PVT MK REM | 1,881 | EACH | $18.00 | |
| 108 | 82500330 | LT CONT PEDM 240V 60 | 1 | EACH | $10,500.00 |