(6&50-8)RS,BRR
- Let date
- Friday, August 2, 2024
- Contract
- 66K82 · job page
- District
- District 3
- County
- Bureau, Lasalle
- Highway
- Limits
- Milling and resurfacing (designed overlay), structure repairs, patching, pavement marking, and raised reflective markers on FAI 80 (I-80) from 1 mile west of IL 89 to 0.7 mile west of IL 251.
Bidders 1
| # | Contractor | Total bid | vs estimate | vs low |
|---|---|---|---|---|
| EE | Engineer's estimate | — | ||
| 1 | Advanced Asphalt Company Low bidder | $21,687,508 |
| Seq | Bid code | Description | Qty | Unit | Estimate | #1 Advanced Asphal… |
|---|---|---|---|---|---|---|
| 1 | X0326208 | ALTERNATE RTE SIGNING | 1 | L SUM | $30,000.00 | |
| 2 | X0326341 | REATTACH END SECTION | 1 | EACH | $1,395.00 | |
| 3 | X0500002 | HMA MOW STRIP | 8,422 | SQ YD | $40.00 | |
| 4 | X2020114 | GRAD & SHAP DITCH SPL | 5,524 | FOOT | $17.50 | |
| 5 | X2700001 | TEMP RUMBLE STRIPS SP | 8 | EACH | $1,400.00 | |
| 6 | X4401198 | HMA SURF REM VAR DP | 3,010 | SQ YD | $6.50 | |
| 7 | X5010523 | REM CONC END SEC | 2 | EACH | $840.00 | |
| 8 | X5036002 | CONC HEADWALL REPAIR | 3 | EACH | $5,500.00 | |
| 9 | X6026200 | INLETS ADJUST SPL | 1 | EACH | $1,600.00 | |
| 10 | X6040171 | GRATES SPL | 1 | EACH | $1,700.00 | |
| 11 | X6040173 | RESET GRATE | 2 | EACH | $550.00 | |
| 12 | X6350204 | LINEAR DELIN PANELS 4 | 83 | EACH | $150.00 | |
| 13 | X6431120 | REM IMP ATTEN SM | 2 | EACH | $2,800.00 | |
| 14 | X7010234 | TC-PROT 701701 SPL | 1 | L SUM | $10,000.00 | |
| 15 | X7010239 | CHANGEABLE MSG SN SPL | 432 | CAL WK | $280.00 | |
| 16 | X7010520 | TC-PROT 701201 SPL | 1 | L SUM | $3,000.00 | |
| 17 | X7011858 | REAL-TIME TR CTRL SU | 96 | WEEK | $254.00 | |
| 18 | X7040012 | TEMP CON BAR (PERM) | 112.5 | FOOT | $80.00 | |
| 19 | X8570002 | SMART TRAF MONIT SYS | 48 | CAL WK | $500.00 | |
| 20 | X8570004 | SMART TRAF MONIT DEV | 240 | CAL WK | $38.00 | |
| 21 | Z0001800 | APPR SLAB REPAIR (PD) | 3 | SQ YD | $9,300.00 | |
| 22 | Z0013798 | CONSTRUCTION LAYOUT | 1 | L SUM | $45,000.00 | |
| 23 | Z0023500 | FILL EXIST CULVERTS | 17 | CU YD | $400.00 | |
| 24 | Z0034105 | MATL TRANSFER DEVICE | 61,145 | TON | $3.36 | |
| 25 | Z0048665 | RR PROT LIABILITY INS | 1 | L SUM | $7,500.00 | |
| 26 | Z0076600 | TRAINEES | 2,000 | HOUR | $0.8000 | |
| 27 | Z0076604 | TRAINEES TPG | 2,000 | HOUR | $15.00 | |
| 28 | 25000210 | SEEDING CL 2A | 1.5 | ACRE | $6,000.00 | |
| 29 | 25000400 | NITROGEN FERT NUTR | 135 | POUND | $5.00 | |
| 30 | 25000500 | PHOSPHORUS FERT NUTR | 135 | POUND | $5.00 | |
| 31 | 25000600 | POTASSIUM FERT NUTR | 135 | POUND | $5.00 | |
| 32 | 25100630 | EROSION CONTR BLANKET | 6,137 | SQ YD | $4.00 | |
| 33 | 28000315 | AGG DITCH CHECKS | 607 | TON | $90.00 | |
| 34 | 28100107 | STONE RIPRAP CL A4 | 134 | SQ YD | $175.00 | |
| 35 | 28100707 | STONE DUMP RIP CL A4 | 12 | SQ YD | $685.00 | |
| 36 | 28200200 | FILTER FABRIC | 1,874 | SQ YD | $3.50 | |
| 37 | 28400100 | GABIONS | 6 | CU YD | $1,000.00 | |
| 38 | 40600290 | BIT MATLS TACK CT | 225,266 | POUND | $1.00 | |
| 39 | 40600370 | LONG JOINT SEALANT | 125,252 | FOOT | $2.50 | |
| 40 | 40600372 | LNG JNT SLNT HALF WD | 533,499 | FOOT | $1.65 | |
| 41 | 40603085 | HMA BC IL-19.0 N70 | 2,100 | TON | $130.00 | |
| 42 | 40603090 | HMA BC IL-19.0 N90 | 22,046 | TON | $95.00 | |
| 43 | 40603235 | P HMA BC IL19.0 N70 | 19,332 | TON | $97.00 | |
| 44 | 40603240 | P HMA BC IL19.0 N90 | 2,226 | TON | $135.00 | |
| 45 | 40604052 | HMA SC IL-9.5 C N70 | 1,865 | TON | $145.00 | |
| 46 | 40604152 | P HMA SC IL-9.5 C N70 | 9,326 | TON | $110.00 | |
| 47 | 40605015 | P HMA BC SMA 12.5 N80 | 17,523 | TON | $130.00 | |
| 48 | 40605034 | P SC SMA 12.5 E N80 | 19,350 | TON | $135.00 | |
| 49 | 42000060 | WELDED WIRE REINF | 840 | SQ YD | $25.00 | |
| 50 | 44000157 | HMA SURF REM 2 | 26,194 | SQ YD | $5.00 | |
| 51 | 44000165 | HMA SURF REM 4 | 1,419 | SQ YD | $8.00 | |
| 52 | 44000166 | HMA SURF REM 4 1/4 | 34,861 | SQ YD | $8.00 | |
| 53 | 44000175 | HMA SURF REM 6 1/2 | 151,474 | SQ YD | $9.50 | |
| 54 | 44000182 | HMA SURF REM 8 | 55,305 | SQ YD | $10.50 | |
| 55 | 44000300 | CURB REM | 105 | FOOT | $65.00 | |
| 56 | 44004250 | PAVED SHLD REMOVAL | 371 | SQ YD | $45.00 | |
| 57 | 44200994 | CL B PATCH T2 12 | 1,311 | SQ YD | $350.00 | |
| 58 | 44200998 | CL B PATCH T3 12 | 200 | SQ YD | $350.00 | |
| 59 | 44201000 | CL B PATCH T4 12 | 640 | SQ YD | $350.00 | |
| 60 | 44201299 | DOWEL BARS 1 1/2 | 3,834 | EACH | $25.00 | |
| 61 | 44213200 | SAW CUTS | 9,837 | FOOT | $6.00 | |
| 62 | 44213204 | TIE BARS 3/4 | 141 | EACH | $25.00 | |
| 63 | 48102100 | AGG WEDGE SHLD TYPE B | 5,916 | TON | $30.00 | |
| 64 | 48203029 | HMA SHOULDERS 8 | 1,101 | SQ YD | $85.00 | |
| 65 | 50104400 | CONC HEADWALL REMOVAL | 1 | EACH | $1,000.00 | |
| 66 | 50300225 | CONC STRUCT | 4.4 | CU YD | $2,375.00 | |
| 67 | 50300300 | PROTECTIVE COAT | 24 | SQ YD | $15.00 | |
| 68 | 50800205 | REINF BARS, EPOXY CTD | 630 | POUND | $5.00 | |
| 69 | 51100301 | BIT CT AG SLOPEWALL 6 | 20 | SQ YD | $100.00 | |
| 70 | 52000005 | PREF JOINT SEAL 1 | 87 | FOOT | $150.00 | |
| 71 | 52200020 | TEMP SOIL RETEN SYSTM | 36 | SQ FT | $400.00 | |
| 72 | 542A0229 | P CUL CL A 1 24 | 49 | FOOT | $200.00 | |
| 73 | 54213669 | PRC FLAR END SEC 24 | 1 | EACH | $2,300.00 | |
| 74 | 54246205 | INLET BOX 542526 | 1 | EACH | $22,500.00 | |
| 75 | 54261418 | CONC ES 542001 18 1:4 | 1 | EACH | $11,500.00 | |
| 76 | 54261424 | CONC ES 542001 24 1:4 | 3 | EACH | $12,000.00 | |
| 77 | 54261624 | CONC ES 542001 24 1:6 | 1 | EACH | $15,000.00 | |
| 78 | 54262712 | METAL FL END SEC 12" | 1 | EACH | $250.00 | |
| 79 | 59000200 | EPOXY CRACK INJECTION | 954 | FOOT | $45.00 | |
| 80 | 59300100 | CONTR LOW-STRENG MATL | 38 | CU YD | $200.00 | |
| 81 | 60920012 | PIPE CULV CLEANED 12 | 66 | FOOT | $50.00 | |
| 82 | 60920015 | PIPE CULV CLEANED 15 | 1,342 | FOOT | $35.00 | |
| 83 | 60920024 | PIPE CULV CLEANED 24 | 951 | FOOT | $40.00 | |
| 84 | 60920036 | PIPE CULV CLEANED 36 | 181 | FOOT | $45.00 | |
| 85 | 60920060 | PIPE CULV CLEANED 60 | 1,488 | FOOT | $15.00 | |
| 86 | 63000001 | SPBGR TY A 6FT POSTS | 2,537.5 | FOOT | $27.50 | |
| 87 | 63100045 | TRAF BAR TERM T2 | 2 | EACH | $2,750.00 | |
| 88 | 63100085 | TRAF BAR TERM T6 | 8 | EACH | $3,250.00 | |
| 89 | 63100167 | TR BAR TRM T1 SPL TAN | 8 | EACH | $3,500.00 | |
| 90 | 63200310 | GUARDRAIL REMOV | 1,890 | FOOT | $4.00 | |
| 91 | 63500105 | DELINEATORS | 13 | EACH | $85.00 | |
| 92 | 64200116 | SHOULDER RUM STRIP 16 | 101,450 | FOOT | $0.3000 | |
| 93 | 64300450 | IMP ATTEN NRD TL3 | 6 | EACH | $7,000.00 | |
| 94 | 64401100 | HT CBL MEDIAN BARRIER | 18,501 | FOOT | $31.50 | |
| 95 | 64401300 | HT CBL MED BAR TERM | 10 | EACH | $3,500.00 | |
| 96 | 66900200 | NON SPL WASTE DISPOSL | 204 | CU YD | $200.00 | |
| 97 | 66900530 | SOIL DISPOSAL ANALY | 1 | EACH | $1,500.00 | |
| 98 | 66901001 | REG SUB P-CONST PLAN | 1 | L SUM | $4,800.00 | |
| 99 | 66901003 | REG SUB F CON REPORT | 1 | L SUM | $500.00 | |
| 100 | 66901006 | REG SUB MON | 10 | CAL DA | $1,300.00 | |
| 101 | 67000400 | ENGR FIELD OFFICE A | 12 | CAL MO | $2,400.00 | |
| 102 | 67100100 | MOBILIZATION | 1 | L SUM | $1,250,000.00 | |
| 103 | 70100420 | TRAF CONT-PROT 701411 | 8 | EACH | $2,000.00 | |
| 104 | 70100800 | TRAF CONT-PROT 701401 | 1 | L SUM | $275,000.00 | |
| 105 | 70100825 | TRAF CONT-PROT 701456 | 1 | L SUM | $10,000.00 | |
| 106 | 70103815 | TR CONT SURVEILLANCE | 30 | CAL DA | $1,000.00 | |
| 107 | 70107025 | CHANGEABLE MESSAGE SN | 28 | CAL DA | $100.00 | |
| 108 | 70200100 | NIGHT WORK ZONE LIGHT | 1 | L SUM | $45,000.00 | |
| 109 | 70300100 | SHORT TERM PAVT MKING | 1,797 | FOOT | $1.60 | |
| 110 | 70300150 | SHRT TRM PAVT MK REM | 32,184 | SQ FT | $1.00 | |
| 111 | 70302120 | TEMP PVT MK L4 PU | 142,716 | FOOT | $0.9000 | |
| 112 | 70307120 | TEMP PVT MK L4 T4 TAPE | 95,731 | FOOT | $1.50 | |
| 113 | 70400100 | TEMP CONC BARRIER | 337.5 | FOOT | $50.00 | |
| 114 | 70400125 | PIN TEMP CONC BARRIER | 9 | EACH | $140.00 | |
| 115 | 70400200 | REL TEMP CONC BARRIER | 262.5 | FOOT | $50.00 | |
| 116 | 70600260 | IMP ATTN TEMP FRN TL3 | 1 | EACH | $10,000.00 | |
| 117 | 70600332 | IMP ATTN REL FRN TL3 | 1 | EACH | $5,000.00 | |
| 118 | 72000100 | SIGN PANEL T1 | 647 | SQ FT | $21.00 | |
| 119 | 72000200 | SIGN PANEL T2 | 354 | SQ FT | $25.50 | |
| 120 | 72000300 | SIGN PANEL T3 | 5,563 | SQ FT | $27.50 | |
| 121 | 72400100 | REMOV SIN PAN ASSY TA | 30 | EACH | $72.00 | |
| 122 | 72400200 | REMOV SIN PAN ASSY TB | 50 | EACH | $143.00 | |
| 123 | 72400310 | REMOV SIGN PANEL T1 | 39 | SQ FT | $25.00 | |
| 124 | 72400320 | REMOV SIGN PANEL T2 | 138 | SQ FT | $12.50 | |
| 125 | 72400330 | REMOV SIGN PANEL T3 | 5,443 | SQ FT | $5.15 | |
| 126 | 72500300 | OBJECT MARKER T3 | 54 | EACH | $140.00 | |
| 127 | 72501000 | TERMINAL MARKER - DA | 8 | EACH | $50.00 | |
| 128 | 72700200 | TUB STL SN SUPPORT BA | 960 | POUND | $10.00 | |
| 129 | 72800100 | TELES STL SIN SUPPORT | 1,036 | FOOT | $20.60 | |
| 130 | 73000100 | WOOD SIN SUPPORT | 1,258 | FOOT | $20.00 | |
| 131 | 73400100 | CONC FOUNDATION | 2.1 | CU YD | $4,566.00 | |
| 132 | 73700100 | REM GR MT SIN SUPPORT | 3 | EACH | $287.00 | |
| 133 | 73700200 | REM CONC FDN-GR MT | 3 | EACH | $1,094.00 | |
| 134 | 78004600 | PREF PL PM TD STD LTR/SYM | 160 | SQ FT | $18.00 | |
| 135 | 78004640 | PREF PL PM TD STD L 8 | 20,334 | FOOT | $9.95 | |
| 136 | 78004720 | PREF PL PM TD STD L24 | 83 | FOOT | $18.00 | |
| 137 | 78005110 | EPOXY PVT MK LINE 4 | 270,498 | FOOT | $0.7500 | |
| 138 | 78005150 | EPOXY PVT MK LINE 12 | 1,258 | FOOT | $5.85 | |
| 139 | 78011025 | GRV RCSD PVT MRKG 5 | 133,471 | FOOT | $0.6500 | |
| 140 | 78011045 | GRV RCSD PVT MRKG 9 | 20,112 | FOOT | $1.35 | |
| 141 | 78011065 | GRV RCSD PVT MRKG 13 | 628 | FOOT | $3.00 | |
| 142 | 78011125 | GRV RCSD PVT MRKG 25 | 83 | FOOT | $3.35 | |
| 143 | 78100100 | RAISED REFL PAVT MKR | 1,592 | EACH | $49.00 | |
| 144 | 78200005 | GRDRAIL REF TYPE A | 90 | EACH | $35.00 | |
| 145 | 78200011 | BARR WALL REF TYPE C | 46 | EACH | $9.00 | |
| 146 | 78200021 | HT CBL MED BAR REF | 288 | EACH | $40.00 | |
| 147 | 78300200 | RAISED REF PVT MK REM | 1,588 | EACH | $11.59 | |
| 148 | 78300202 | PVT MKG REM WTR BLAST | 65,365 | SQ FT | $1.00 | |
| 149 | 80400100 | ELECT SERV INSTALL | 1 | EACH | $6,070.00 | |
| 150 | 81028750 | UNDRGRD C CNC 2 | 1,128 | FOOT | $37.44 | |
| 151 | 81603040 | UD 2#6 #8G XLPUSE 1 | 6,833 | FOOT | $11.51 | |
| 152 | 82110008 | LUM LED RDWY H | 22 | EACH | $1,363.50 | |
| 153 | 82500330 | LT CONT PEDM 240V 60 | 1 | EACH | $13,597.20 | |
| 154 | 83008600 | LT P A 40MH 15MA | 18 | EACH | $6,602.00 | |
| 155 | 83008601 | LT P A 40MH 15MA-TW | 2 | EACH | $8,440.00 | |
| 156 | 83600355 | LP F M 15BC 8" X 6' | 20 | EACH | $2,312.00 | |
| 157 | 83800650 | BKWY DEV COU SS SCRN | 80 | EACH | $327.20 | |
| 158 | 84200600 | REM LT U NO SALV | 20 | EACH | $700.50 | |
| 159 | 84200605 | REM LT TWR NO SAL | 5 | EACH | $7,269.50 | |
| 160 | 84200804 | REM POLE FDN | 5 | EACH | $5,589.50 | |
| 161 | 84500110 | REMOV LIGHTING CONTR | 1 | EACH | $2,682.00 | |
| 162 | 84500120 | REMOV ELECT SERV INST | 1 | EACH | $2,255.00 |