IDOT Jobs

All dates · 205 jobs · — Sign up free
★ My Jobs

Filtered by: County: LaSalle Clear all

205 jobs · — estimated

ExcelCSV
Let date Contract / PPS County / Division Highway Description Estimate Status Added Low bidder
Jan 19, 2018 66H10 BureauLaSalleDistrict 3 "On Call" repair and maintenance of traffic signals, flashing beacons and roadway lighting throughout District 3. — Executed Nov 26 New Meade Inc. $88,323 ·
Jan 19, 2018 66H85 LaSalleDistrict 3 Washing and concrete sealing bridge SN 050-0246 carrying IL 170 over the Illinois River and River Road, 1.4 miles south of US 6. — Executed Nov 26 New M & M Concrete, Inc. $43,989 ·
Jan 19, 2018 66H86 LaSalleDistrict 3 Washing and concrete sealing bridge SN 050-0219 carrying CH 15 over the Illinois River, 0.41 miles south of US 6. — Executed Nov 26 New M & M Concrete, Inc. $43,996 ·
Jan 19, 2018 66H87 LaSalleDistrict 3 Washing and concrete sealing bridge SN 050-0180 carrying IL 23/71 over the Illinois River and Access Rd., 1 mile south of US 6. — Executed Nov 26 New M & M Concrete, Inc. $49,999 ·
Jan 19, 2018 66H89 LaSalleDistrict 3 Washing and concrete sealing bridge SN 050-0237 carrying IL 351 over the Illinois River, 1.2 miles south of US 6. — Executed Nov 26 New M & M Concrete, Inc. $42,999 ·
Jan 19, 2018 66H90 LaSalleDistrict 3 Washing and concrete sealing bridge SN 050-0079 carrying IL 251 over the Illinois River, Water Street, Iowa Interstate Railroad and Illinois Railway, 0.26 mile south of US 6. — Executed Nov 26 New M & M Concrete, Inc. $48,000 ·
Mar 9, 2018 66H18 LaSalleDistrict 3 4.29 miles of shoulder widening and rumble strips on IL 71 from just east of the Vermilion River in Jonesville to E 950th Road. — Executed Nov 26 New Advanced Asphalt Company $788,416 ·
Mar 9, 2018 66H96 LaSalleDistrict 3 Centerline crack and joint sealing on I-80 from the Fox River Bridge, north of Ottawa to west of CH 15 interchange north of Marseilles. — Executed Nov 26 New Countryman, Inc. $52,145 ·
Mar 9, 2018 66J03 LaSalleDistrict 3 Intermittent class A patching on I-39 from I-80 to 0.3 mile south of Lee County Line. — Executed Nov 26 New G. M. Sipes Construction, Inc. $356,097 ·
Mar 9, 2018 87679 LaSalleDistrict 3 Reconstruction of FAU 6031 (4H Road) from 370 feet west of Ashbury Way to Adams Street in the City of Ottawa. — Executed Nov 26 New Advanced Asphalt Company $985,152 ·
Mar 9, 2018 87683 LaSalleDistrict 3 Remove and replace both piers underneath the structure carrying CH 3 over the Fox River, 0.1 miles northwest of Millington. — Executed Nov 26 New D. Construction, Inc. $1,521,358 ·
Apr 27, 2018 87678 LaSalleDistrict 3 Resurfacing Commercial Street from Walbridge Creek to Spicer Street in the City of Marseilles. — Executed Nov 26 New Advanced Asphalt Company $133,812 ·
Jun 15, 2018 46490 BureauLaSalleDistrict 3 Remove and replace Raised Reflective pavement markers and reflectors on various routes in District 3. — Executed Nov 26 New P & P Construction Co. $125,628 ·
Jun 15, 2018 46491 DeKalbKendallLaSalleDistrict 3 Remove and replace raised reflective pavement markers and reflectors on various routes in District 3. — Executed Nov 26 New Countryman, Inc. $129,404 ·
Jun 15, 2018 66D75 LaSalleDistrict 3 9.518 miles of 3P milling and resurfacing on IL 23, from south of McKinley Road to north of Richards Road near Streator. — Executed Nov 26 New Advanced Asphalt Company $4,570,417 ·
Jun 15, 2018 66H61 LaSalleDistrict 3 7,541 feet of milling and resurfacing, mailbox turnouts and entrances on IL 71 south of I-80 overpass to 0.2 mile north of US 6. — Executed Nov 26 New Advanced Asphalt Company $448,901 ·
Jun 15, 2018 66J17 LaSalleDistrict 3 Intermittent milling and resurfacing in various locations in LaSalle County. — Executed Nov 26 New Advanced Asphalt Company $980,140 ·
Jun 15, 2018 66J29 BureauGrundyLaSalleDistrict 3 Class A and Class B pavement patching and pavement marking on I-80 from the Henry/Bureau County line to the Grundy/Will County line. — Executed Nov 26 New D. Construction, Inc. $323,732 ·
Jun 15, 2018 66J30 LaSalleDistrict 3 Class A pavement patching and pavement marking on I-39 from the Marshall/LaSalle County line to south of the Illinois River. — Executed Nov 26 New G. M. Sipes Construction, Inc. $200,881 ·
Jun 15, 2018 87701 LaSalleDistrict 3 Widening and resurfacing CH32 from 0.25 mile west of East 27th Street Road to 0.25 mile east of East 27th Road. — Executed Nov 26 New D. Construction, Inc. $299,738 ·
Aug 3, 2018 66J39 LaSalleDistrict 3 36.5 miles of weed spraying from the Marshall County line to the Lee County line. — Executed Nov 26 New Endrizzi Contracting, Inc $35,624 ·
Nov 9, 2018 66A57 LaSalleDistrict 3 Bridge replacement of SN 050-0052 with SN 050-0259 over the Little Vermilion River, 3.1 miles east of IL 251. — Executed Nov 26 New D. Construction, Inc. $1,569,242 ·
Nov 9, 2018 66F12 LaSalleDistrict 3 Regrading a failed slope along IL 251 and stabilizing it with a soldier pile retaining wall. Work includes repairs to existing box culvert SN 050-8802. Project is located 2.1 miles south of I-80. — Executed Nov 26 New Rausch Infrastructure LLC_DO NOT USE $1,218,205 ·
Nov 9, 2018 66J60 LaSalleDistrict 3 Sparaying weeks along I-39 from the Marshal County line to the Lee County line. — Executed Nov 26 New The Daltons Inc. $34,988 ·
Jan 18, 2019 66C58 LaSalleDistrict 3 Removal and replacemnt of SN 050-0073 carrying IL 170 over the BNSF Railroad at the Village of Ransom. Work includes embankment, guardrail, landscaping, and pavement striping. — Executed Nov 26 New D. Construction, Inc. $3,144,188 ·
Jan 18, 2019 66E75 LaSalleDistrict 3 Paching, milling, and resurfacing at various locations on IL 23/IL 71 from Freemont St. to 0.2 miles south of McKinley Rd., and 0.1 mile south of Lincoln Place. — Executed Nov 26 New Advanced Asphalt Company $4,638,064 ·
Jan 18, 2019 66E99 LaSalleDistrict 3 3P milling and resurfacing of US 6 from IL 178 to the west city limits of Ottawa. 7.11 miles. — Executed Nov 26 New Advanced Asphalt Company $2,864,832 ·
Jan 18, 2019 66J04 LaSalleDistrict 3 Removal of the existing parking lot pavement and replacement with a new parking area. — Executed Nov 26 New Universal Asphalt & Excavating, Inc. $250,991 ·
Mar 8, 2019 66J44 LaSalleDistrict 3 Clean and paint structural steel and steel components on SN 050-0188 carrying IL 71 over Covel Creek. — Executed Nov 26 New ERA-Valdivia Contractors, Inc. $231,505 ·
Mar 8, 2019 66J50 LaSalleDistrict 3 Class B pavement patching, curb and gutter, and concrete median removal and replacement on IL 23 from Grace Community Church North of Streator to the intersection of IL 23 and N. 17th Rd. (Richards Road) — Executed Nov 26 New Scanlon Excavating & Concrete, Inc. $85,394 ·
Mar 8, 2019 66J54 LaSalleDistrict 3 crack and joint sealing on IL 251 from 0.3 mile south of N 31st Rd. to I-80, and 1-pass full-width microsurfacing on IL 251 from I-80 to US 6 in Peru. — Executed Nov 26 New Asphalt Stone Company $692,705 ·
Mar 8, 2019 66J55 LaSalleDistrict 3 9.76 miles of crack and joint sealing on IL 71 from north of I-80 to US 52. — Executed Nov 26 New Complete Asphalt Service Co. $32,347 ·
Mar 8, 2019 66J75 KendallLaSalleDistrict 3 Repair and maintain traffic signals, flashing beacons, roadway lighting, and other electrical services that are requested by "on call" work orders — Executed Nov 26 New H & H Electric Co. $46,600 ·
Mar 8, 2019 66J76 BureauLaSalleDistrict 3 Repair and maintain traffic signals, flashing beacons, roadway lighting, and other electrical services requested by "on-call" work orders. — Executed Nov 26 New Laser Electric, Inc. $75,883 ·
Apr 26, 2019 66J66 GrundyLaSalleDistrict 3 Intermittent milling and resurfacing on IL 47 from Illinois Ave. to south of Jefferson Street in Morris and on IL 170 from US 6 to just south of the CSX Railroad crossing in Seneca. — Executed Nov 26 New D. Construction, Inc. $426,301 ·
Apr 26, 2019 87708 LaSalleDistrict 3 Replace the bridges carrying TR 469 and TR 382 over Covel Creek, 6 miles east of Grand Ridge. — Executed Nov 26 New Riber Construction, Inc. $726,079 ·
Apr 26, 2019 87714 LaSalleDistrict 3 Resurfacing and intersection improvements on FAS Route 263 (CH 5) at Illinois Route 23. — Executed Nov 26 New Advanced Asphalt Company $216,236 ·
Jun 14, 2019 66J74 LaSalleDistrict 3 MEDIAN CROSSOVER and SHOULDER RECONSTRUCTION 0.5 MILES W OF SN 050-0228/0228 TO 0.5 MILES E OF SN 050-0220/0221 IN LASALLE. — Executed Nov 26 New Advanced Asphalt Company $744,730 ·
Jun 14, 2019 66J84 LaSalleDistrict 3 8.5 miles of intermittent Class A Patching, longitudinal partial depth patching on mainline pavement, and intermittent pavement striping and crack sealing on I-39 from Marshall co Line to 0.4 miles north of CH 54 west of Tonica. — Executed Nov 26 New Beniach Construction Co., Inc. $667,472 ·
Jun 14, 2019 66J85 LaSalleDistrict 3 6.5 miles of intermittent Class A Patching, longitudinal partial depth patching on mainline pavement, and intermittent pavement striping and crack sealing on I-39 from US 34 to 0.3 mile south of Lee County line. — Executed Nov 26 New G. M. Sipes Construction, Inc. $1,030,963 ·
Jun 14, 2019 66J88 LaSalleLivingstonDistrict 3 12.4 miles of routing and sealing on IL 23 from just north of Oakley Avenue to Grove Street in Streator, and on IL 23 from 1 mile south of the LaSalle County Line to 9th Street in Cornell. — Executed Nov 26 New Denler, Inc. $73,110 ·
Jun 14, 2019 66J97 LaSalleDistrict 3 Class B pavement patching on US 6 and IL 251 mainline and I-39 ramps at the US 6 and IL 251 interchange. — Executed Nov 26 New G. M. Sipes Construction, Inc. $230,890 ·
Jun 14, 2019 66K01 LaSalleDistrict 3 Class B pavement patching on US 34 from the IL 23 north intersection to the IL 23 south intersection. — Executed Nov 26 New Beniach Construction Co., Inc. $303,402 ·
Jun 14, 2019 66K10 GrundyLaSalleDistrict 3 BRIDGE WASHING AT VARIOUS STRUCTURES OVER THE ILLINOIS RIVER. — Executed Nov 26 New All States Painting, Inc. $169,700 ·
Jun 14, 2019 66K16 LaSalleDistrict 3 RAISING BRIDGE APPROACH SLAB SN 05-0211 (50' OF THE NORTH APPROACH) ON I-39 NORTHBOUND WITH EXPANDING POLYURETHANE HIGH DENSITY FOAM. — Executed Nov 26 New D. Construction, Inc. $103,332 ·
Jul 12, 2019 66B06 LaSalleDistrict 3 10.9 miles of 3P milling and resurfacing on mainline pavement and pavement striping on IL-18 from IL-251 to WCL of Streator. — Executed Nov 26 New Advanced Asphalt Company $4,990,242 ·
Jul 12, 2019 66D54 LaSalleDistrict 3 6.3 miles of milling and resurfacing 3.75" of HMA at US-34 mainline and shoulders. Including removing and resurfacing 1" of HMA surface at bridge decks. — Executed Nov 26 New Curran Contracting Company $2,407,407 ·
Aug 2, 2019 87703 LaSalleDistrict 3 Reconstruct the intersection of CH43 and CH33, located 4.0 miles north of Utica. — Executed Nov 26 New Advanced Asphalt Company $680,493 ·
Sep 20, 2019 87711 LaSalleDistrict 3 construction of the extension of Unytite Drive between Plank Road and Donlar Ave. in Peru. — Executed Nov 26 New Advanced Asphalt Company $1,487,056 ·
Sep 20, 2019 87713 LaSalleDistrict 3 Pavement widening and resurfacing on CH 15 from I-80 to IL 71. — Executed Nov 26 New D. Construction, Inc. $2,346,622 ·
Nov 8, 2019 66F75 LaSalleDistrict 3 Deck replacement and beam repair on SN 050-0201 carrying US 52 over Indian Creek, located 2.1 miles E of IL 23. — Executed Nov 26 New Civil Constructors, Inc. $2,219,448 ·
Nov 8, 2019 66J72 LaSalleDistrict 3 Bridge repair SN 050-0163 and 050-0164 on I-39 above BandN RR, 0.8 miles N of US 34. — Executed Nov 26 New D. Construction, Inc. $568,614 ·
Nov 8, 2019 87706 LaSalleDistrict 3 Construction of a shared-use-path and the construction of a pedestrian bridge over I-80, located west of IL 23 from Stevenson Road to Etna Road in the City of Ottawa. — Executed Nov 26 New D. Construction, Inc. $1,756,388 ·
Jan 17, 2020 66C59 LaSalleDistrict 3 Replacing the existing structure carrying CH 9 over I-80 including a new embankment and CH 9 realignment and reconstruction. Resurfacing of the IDOT buildings is also proposed under CI funds. — Executed Nov 26 New D. Construction, Inc. $4,314,254 ·
Jan 17, 2020 66H21 LaSalleDistrict 3 1.279 miles of superstructure replacements and bridge repairs from LaSalle Rd to Little Vermilion River. — Executed Nov 26 New D. Construction, Inc. $16,388,867 ·
Jan 17, 2020 66J57 LaSalleDistrict 3 Class A patching on the on/off ramp terminals and Class B patching on the on/off ramp pavements and US 52 mainline pavements at the interchanges of FAI 39 and US 52. — Executed Nov 26 New G. M. Sipes Construction, Inc. $415,883 ·
Jan 17, 2020 66K38 LaSalleDistrict 3 Cleaning and painting all structural steel including beams, diaphragms, bearings, drains, steel handrails when specified and all other steel components of SN 050-0165 carrying US Rte 34 over FAI 39 interchange of US 34 and I-39. — Executed Nov 26 New ERA-Valdivia Contractors, Inc. $351,131 ·
Mar 6, 2020 66J48 LaSalleDistrict 3 2.766 miles of milling and resurfacing and ADA improvements from 0.8 miles W of Boyce Memorial Dr to Champlain St in Ottawa. Widen shoulders 1' at west end of the project. — Executed Nov 26 New Advanced Asphalt Company $3,711,915 ·
Mar 6, 2020 66K29 LaSallePutnamDistrict 3 3.83 miles of microsurfacing (1-pass) full width on IL 71 from IL 89 to Cedar Creek in Cedar Point. , 8.390 miles of patching from W of I-55 to the Livingston County Line. — Executed Nov 26 New A. C. Pavement Striping Co. $306,765 ·
Apr 24, 2020 66K45 LaSalleDistrict 3 3P milling and resurfacing (designed overlay) and ADA from Bureau County Line to IL 251 in Mendota. — Executed Nov 26 New Advanced Asphalt Company $1,104,965 ·
Jun 12, 2020 66J34 LaSalleDistrict 3 Class B patching on IL 18 and IL 71 and Class A and B patching on the entrance and exit ramps, at the interchanges of I-39 and IL 18 and IL 71. — Executed Nov 26 New G. M. Sipes Construction, Inc. $396,409 ·
Jun 12, 2020 66J96 LaSalleDistrict 3 HMA milling and resurfacing, PCC pavement replacement, storm sewer replacement, gutter removal, guardrail, and striping on FAP Rte 68 (IL 23) from the N intersection of IL 23 and US 34 to 400' N of SN 050-0042 (BNSF Railway). — Executed Nov 26 New Scanlon Excavating & Concrete, Inc. $485,332 ·
Jun 12, 2020 66K14 LaSalleDistrict 3 Cleaning and painting all structural steel components, including beams/girders, diaphragms, cross and lateral framing, bearings, drains, angle brackets, steel handrails when present, and other related steel components of SN 050-0129 carrying E. 14th Rd (TR 244) over FAI 80 (I-80) 6 miles E of IL 178. — Executed Nov 26 New ERA-Valdivia Contractors, Inc. $249,708 ·
Jun 12, 2020 66K89 GrundyLaSalleDistrict 3 Beam end cleaning and painting on SN 032-0099 (IL 47 in Morris) and SN 050-0219 (CH 15, Marseilles Rd in Marseilles). — Executed Nov 26 New ERA-Valdivia Contractors, Inc. $407,093 ·
Jun 12, 2020 66K97 LaSalleDistrict 3 Class A patching, longitudinal partial depth patching, and pavement marking on I-39 beginning at CH 54 W of Tonica (MP 48.4) and ending 0.8 mile S of 42nd Rd (MP 70.0). , Class A patching, longitudinal partial depth patching, and pavement marking on I-39 beginning at CH 54 W of Tonica (MP 48.4) and ending 0.8 mile S of 42nd Rd (MP 70.0). — Executed Nov 26 New G. M. Sipes Construction, Inc. $1,483,376 ·
Jun 12, 2020 87692 LaSalleDistrict 3 Replace the bridge carrying FAS 263 (CH 5) over the Vermilion River, 4.0 miles east of Leonore. — Executed Nov 26 New ICC Group Inc. $8,028,500 ·
Jun 12, 2020 87717 LaSalleDistrict 3 Sidewalk replacement, paving brick sidewalk, traffic signals and street lighting along IL 18 from the Vermilion River to Wasson Street, on Vemilion Street from Hickory St. to Bridge St. and on Monroe St. from Hickory St. to Bridge St. in Streator. — Rejected Nov 26 New H. J. Eppel & Co. $926,471 ·
Jul 31, 2020 66L05 LaSalleDistrict 3 Crack and Joint Sealing on FAP 623 (US 6) from 0.31 mi of 1-39 to IL 178 in Utica in LaSalle for a total length of 3.57 miles. — Executed Nov 26 New Complete Asphalt Service Co. $17,440 ·
Jul 31, 2020 66L07 LaSalleDistrict 3 Repairing scour/erosion damage under both abutments by filling the existing void under the footings with a self-consolidating concrete and installing a riprap slope at SN 050-0059 carrying FAP 607 (US 52) over Mission Creek approximately 0.3 mi W of IL 71 in LaSalle County. — Rejected Nov 26 New D. Construction, Inc. $32,407 ·
Jul 31, 2020 87727 LaSalleDistrict 3 Replace the bridge carrying CH 5 over Wolf Creek, 2.3 miles east of IL 23. — Executed Nov 26 New Riber Construction, Inc. $922,301 ·
Sep 18, 2020 66L27 LaSalleDistrict 3 Removing and replacing two wing walls of the structure This work is located at Structure No. 050-2539 carrying IL 170 over Armstrong Run. Approximately 3.86 miles south of US 6 in LaSalle County. This project consists of removing and replacing two wing walls of the structure. — Executed Nov 26 New D. Construction, Inc. $93,370 ·
Jan 15, 2021 66L00 LaSalleDistrict 3 Latex overlay, cleaning and painting structural steel and expansion joint repair of SN 050-0171 carrying US 52 over 1-39 in Troy Grove. — Executed Nov 26 New D. Construction, Inc. $1,200,540 ·
Mar 5, 2021 66B07 LaSalleDistrict 3 3P Milling and Resurfacing (Design Overlay), spot guardrail improvement and minor drainage improvement on FAS FAP 603 (US 52 and IL 23) from 0.5 miles West of 1-39 to IL 23 (S) in LaSalle County IL 23. — Executed Nov 26 New Advanced Asphalt Company $3,842,156 ·
Mar 5, 2021 66L17 LaSalleDistrict 3 Removing and replacing the expansion joints and approach slabs This work is located at two sets of structures, SN 050-0210 and SN 050-0211 carrying FAI 39 Over the Nor-Folk Southern Railway, 1.48 miles north of IL Rte 18 and SN 050-0212 and SN 050-0213 carrying FAI 39 over Sandy creek, 1.23 mi. north of IL Rte. 18. This project consists of removing and replacing the expansion joints and approach slabs. — Executed Nov 26 New Gensini Excavating, Inc. $1,393,416 ·
Mar 5, 2021 66L23 LaSalleDistrict 3 Bridge painting This work is located at Structure No. 050-0011 (EB) and 050-0012 (WB) over Illinois Railway, approximately 2.0 miles East of IL 23 in LaSalle County. This work consists of bridge painting. — Executed Nov 26 New ERA-Valdivia Contractors, Inc. $389,847 ·
Mar 5, 2021 66L46 LaSalleDistrict 3 Regrading a failed slope along IL 251 and stabilizing the area with soldier piles and retaining walls The project is located 2.1 mi south of I-80 with a length of 450 ft. The work consists of regrading a failed slope along IL 251 and stabilizing the area with soldier piles and retaining walls. These will be built into existing box culvert (050-2524) with some drainage items. The final graded slope will be seeded. — Executed Nov 26 New D. Construction, Inc. $764,122 ·
Apr 23, 2021 66B52 LaSalleDistrict 3 The reconstruction of the existing intersection into a PCC roundabout The project is located in the intersection of US 6 and IL 178, north of Utica in LaSalle county and consists of the reconstruction of the existing intersection into a PCC roundabout. The project also includes earthwork, seeding, drainage improvements, permanent lighting and removal of existing traffic equipment. The project length is 0.42 miles. — Executed Nov 26 New R. W. Dunteman Company $2,442,377 ·
Apr 23, 2021 66L01 LaSalleDistrict 3 0.71 mile. Latex overlay, cleaning and painting of structural steel and expansion joint replacement. SN 050-0200 IL 251 over 1-39; 0.5 Miles north of IL 71. — Executed Nov 26 New D. Construction, Inc. $1,921,508 ·
Apr 23, 2021 66L33 LaSalleDistrict 3 The installation of approximately 5 This project consists of the installation of approximately 5.92 miles of high tension cable median barrier from 1.09 miles South of N 36th Rd to 0.88 miles South of N 42nd Rd in LaSalle County. — Executed Nov 26 New Advanced Asphalt Company $1,322,328 ·
Apr 23, 2021 66L56 LaSalleLivingstonDistrict 3 Placing aggregate wedge shoulder This work is located on FAP 786 (IL 170) beginning at the intersection of IL 170 and N 21st Rd in LaSalle County and ending at the intersection of IL 170 and IL 17 in Livingston County (+/- 12.0 miles). This work consists of placing aggregate wedge shoulder. — Executed Nov 26 New Phoenix Corporation of the Quad Cities $135,304 ·
Apr 23, 2021 66L61 KendallLaSalleDistrict 3 The intent of this project is to repair and maintain traffic signals, flashing beacons, roadway lighting, and other electrical services that are requested by "on call" work orders in Kendall and LaSalle Counties. — Executed Nov 26 New H & H Electric Co. $49,983 ·
Apr 23, 2021 66L62 BureauLaSalleDistrict 3 The intent of this project is to repair and maintain traffic signals, flashing beacons, roadway lighting, and other electrical services that are requested by "on call" work orders in Bureau and LaSalle Counties. — Executed Nov 26 New Laser Electric, Inc. $71,890 ·
Apr 23, 2021 87743 LaSalleDistrict 3 Replace the bridge carrying N. 33rd Road over Pecumsaugan Creek, 0.2 mile east of E. 9th Road. — Executed Nov 26 New Riber Construction, Inc. $332,516 ·
Apr 23, 2021 87766 LaSalleDistrict 3 Resurfacing Crosat Street from 11th Street to US 6 in the City of LaSalle. — Executed Nov 26 New Universal Asphalt & Excavating, Inc. $230,520 ·
Jun 11, 2021 66B93 DeKalbLaSalleDistrict 3 This is a 3P milling and resurfacing project of 3 3/4" on US 34 from IL 23 to East of Somonauk Road in Somonauk. This will also address ADA sidewalk ramps. Other work will include shoulder stone, pavement marking and raised reflectors. — Executed Nov 26 New Curran Contracting Company $2,242,143 ·
Jun 11, 2021 66D68 LaSalleDistrict 3 Milling and resurfacing 3 Work consists of milling and resurfacing 3.75" HMA on mainline of FAP 619 (IL 351/IL 71) in Oglesby and FAP 627 (IL 71) in Jonesville in LaSalle County. The work includes ADA improvements in Oglesby and guardrail replacement in Jonesville. The job length is 1.2 miles. — Executed Nov 26 New Advanced Asphalt Company $1,122,141 ·
Jun 11, 2021 66H91 LaSalleDistrict 3 Deck patching, latex overlay, concrete repairs to substructure, milling and resurfacing, expansion joints, str This work is located at SN 050-0096 carrying IL 178 over the Vermilion River approximately 3.7 mi. South of IL Route 71 in LaSalle County. This work consists of deck patching, latex overlay, concrete repairs to substructure, milling and resurfacing, expansion joints, striping, pavement markers, curb and gutter removal and replacement, pavement widening removal and replacement, and other related construction items. — Executed Nov 26 New D. Construction, Inc. $671,375 ·
Jun 11, 2021 66K19 LaSalleDistrict 3 This project consists of 5.86 miles of shoulder widening and rumble strip installation on_US 34 from E 12th Rd to 0.18 miles West of IL 23 (South leg) in LaSalle County. — Executed Nov 26 New Curran Contracting Company $742,928 ·
Jun 11, 2021 66K46 LaSalleDistrict 3 The work is 2.79 miles long, extending from 0.4 miles south of I-80 to South of Canal St in LaSalle, consisting of 3P Milling and Resurfacing (Designed Overlay), also including ADA ramps. — Executed Nov 26 New Advanced Asphalt Company $3,223,912 ·
Jun 11, 2021 66L02 LaSalleDistrict 3 Spot improvement. Latex overlay and expansion joint replacement on SN 050-0165 carrying US 34 over I-39 in LaSalle county. — Executed Nov 26 New D. Construction, Inc. $1,081,507 ·
Jun 11, 2021 66L38 LaSalleDistrict 3 This project includes 5400' of milling and resurfacing and reconstruction of curves of the Mattheissen State Park main entrance and parking lot area off IL 178 South of the IL 71 and IL 178 intersection. — Rejected Nov 26 New Advanced Asphalt Company $1,362,759 ·
Jun 11, 2021 66L42 DeKalbLaSalleDistrict 3 3P Milling and Resurfacing (Design Overlay), spot guardrail improvement and minor drainage improvement drainage improvement on FAP 68 (IL 23) from US 30 in Waterman to US 34. — Executed Nov 26 New Curran Contracting Company $3,486,053 ·
Jun 11, 2021 66L55 LaSalleDistrict 3 Expansion joint replacement, deck patching, parapet patching, structural steel repairs This work is located at Structure No. 050-0180 carrying FAP 68 (IL 23/71) over the Illinois River and access road and at Structure No. 050-0182 carrying LaSalle St. over a parking lot, 1.0 mile South of US 6 in Ottawa. This work consists of expansion joint replacement, deck patching, parapet patching, structural steel repairs. — Executed Nov 26 New D. Construction, Inc. $2,603,832 ·
Jun 11, 2021 66L71 LaSalleDistrict 3 Class A Pavement Patching, Subbase removal and replacement and subgrade removal and replacement This work is located at M.M. 42.6 and M.M. 42.9 in the northbound and southbound lanes of FAI Route 39 ( I -39) approximately 1.25 mi. and 1.55 mi. North of IL Route 18 (near Lostant ) in LaSalle County. This project consists of Class A Pavement Patching, Subbase removal and replacement and subgrade removal and replacement. — Executed Nov 26 New D. Construction, Inc. $350,229 ·
Jul 30, 2021 66K47 LaSalleDistrict 3 3P milling and resurfacing project of 3 3/4" on US 52 / IL 251 from US 52 (N) to 0.3 mile South of the BNSF Railroad overpass in Mendota. This will also address ADA sidewalk ramps. Other work will include shoulder stone, pavement marking, and raised reflectors. — Executed Nov 26 New Advanced Asphalt Company $1,959,861 ·
Sep 17, 2021 66M08 BureauLaSalleDistrict 3 The installation of four changeable speed warning signs on the outer interchange ramps at I-80 and I-39 and th This project consists of the installation of four changeable speed warning signs on the outer interchange ramps at I-80 and I-39 and three changeable speed warning signs at the I-80 and I-180 interchange. — Executed Nov 26 New T.M.F. Construction Company $71,655 ·
Nov 5, 2021 46924 LaSalleDistrict 3 Reconstructing a new retaining wall with associated appurtenances, HMA pavement, aggregate base course, type B The project consists of reconstructing a new retaining wall with associated appurtenances, HMA pavement, aggregate base course, type B gutter, guardrail, pavement markings and other improvements along the Entrance Road to the Buffalo Rock State Park, gross and net length 0.05 mi. — Executed Nov 26 New D. Construction, Inc. $637,507 ·
Nov 5, 2021 87742 LaSalleDistrict 3 Replace the bridge carrying TR 222 over a tributary of Indian Creek, 0.5 mile north of Earville. — Executed Nov 26 New Riber Construction, Inc. $815,302 ·
Nov 5, 2021 87752 LaSalleDistrict 3 Realign and reconstruct the intersection of Commercial Street, Broadway Street, and Main Street in Marseilles. — Executed Nov 26 New D. Construction, Inc. $810,168 ·
Jan 21, 2022 66J00 LaSalleDistrict 3 Bridge replacement (SN 050-0039) at Sutphens Run, 0.6 mile East of E 12th Rd. — Executed Nov 26 New D. Construction, Inc. $1,835,069 ·
1–100 of 205Next ›

Lettings: IDOT Transportation Bulletin (Notice of Letting and Contract Detail pages). Planned projects: IDOT Multi-Year Highway Improvement Program (roadway, structure and spot layers on the IDOT open data hub), listed by program year, not let date. "Added" is the first date Bid Potato saw the job. Always confirm against the official proposal before bidding.