Filtered by: County: LaSalle Clear all
| Let date | Contract / PPS | County / Division | Highway | Description | Estimate | Status | Low bidder | |
|---|---|---|---|---|---|---|---|---|
| Jan 19, 2018 | 66H10 | BureauLaSalleDistrict 3 | "On Call" repair and maintenance of traffic signals, flashing beacons and roadway lighting throughout District 3. | — | Executed | Meade Inc. $88,323 · | ||
| Jan 19, 2018 | 66H85 | LaSalleDistrict 3 | Washing and concrete sealing bridge SN 050-0246 carrying IL 170 over the Illinois River and River Road, 1.4 miles south of US 6. | — | Executed | M & M Concrete, Inc. $43,989 · | ||
| Jan 19, 2018 | 66H86 | LaSalleDistrict 3 | Washing and concrete sealing bridge SN 050-0219 carrying CH 15 over the Illinois River, 0.41 miles south of US 6. | — | Executed | M & M Concrete, Inc. $43,996 · | ||
| Jan 19, 2018 | 66H87 | LaSalleDistrict 3 | Washing and concrete sealing bridge SN 050-0180 carrying IL 23/71 over the Illinois River and Access Rd., 1 mile south of US 6. | — | Executed | M & M Concrete, Inc. $49,999 · | ||
| Jan 19, 2018 | 66H89 | LaSalleDistrict 3 | Washing and concrete sealing bridge SN 050-0237 carrying IL 351 over the Illinois River, 1.2 miles south of US 6. | — | Executed | M & M Concrete, Inc. $42,999 · | ||
| Jan 19, 2018 | 66H90 | LaSalleDistrict 3 | Washing and concrete sealing bridge SN 050-0079 carrying IL 251 over the Illinois River, Water Street, Iowa Interstate Railroad and Illinois Railway, 0.26 mile south of US 6. | — | Executed | M & M Concrete, Inc. $48,000 · | ||
| Mar 9, 2018 | 66H18 | LaSalleDistrict 3 | 4.29 miles of shoulder widening and rumble strips on IL 71 from just east of the Vermilion River in Jonesville to E 950th Road. | — | Executed | Advanced Asphalt Company $788,416 · | ||
| Mar 9, 2018 | 66H96 | LaSalleDistrict 3 | Centerline crack and joint sealing on I-80 from the Fox River Bridge, north of Ottawa to west of CH 15 interchange north of Marseilles. | — | Executed | Countryman, Inc. $52,145 · | ||
| Mar 9, 2018 | 66J03 | LaSalleDistrict 3 | Intermittent class A patching on I-39 from I-80 to 0.3 mile south of Lee County Line. | — | Executed | G. M. Sipes Construction, Inc. $356,097 · | ||
| Mar 9, 2018 | 87679 | LaSalleDistrict 3 | Reconstruction of FAU 6031 (4H Road) from 370 feet west of Ashbury Way to Adams Street in the City of Ottawa. | — | Executed | Advanced Asphalt Company $985,152 · | ||
| Mar 9, 2018 | 87683 | LaSalleDistrict 3 | Remove and replace both piers underneath the structure carrying CH 3 over the Fox River, 0.1 miles northwest of Millington. | — | Executed | D. Construction, Inc. $1,521,358 · | ||
| Apr 27, 2018 | 87678 | LaSalleDistrict 3 | Resurfacing Commercial Street from Walbridge Creek to Spicer Street in the City of Marseilles. | — | Executed | Advanced Asphalt Company $133,812 · | ||
| Jun 15, 2018 | 46490 | BureauLaSalleDistrict 3 | Remove and replace Raised Reflective pavement markers and reflectors on various routes in District 3. | — | Executed | P & P Construction Co. $125,628 · | ||
| Jun 15, 2018 | 46491 | DeKalbKendallLaSalleDistrict 3 | Remove and replace raised reflective pavement markers and reflectors on various routes in District 3. | — | Executed | Countryman, Inc. $129,404 · | ||
| Jun 15, 2018 | 66D75 | LaSalleDistrict 3 | 9.518 miles of 3P milling and resurfacing on IL 23, from south of McKinley Road to north of Richards Road near Streator. | — | Executed | Advanced Asphalt Company $4,570,417 · | ||
| Jun 15, 2018 | 66H61 | LaSalleDistrict 3 | 7,541 feet of milling and resurfacing, mailbox turnouts and entrances on IL 71 south of I-80 overpass to 0.2 mile north of US 6. | — | Executed | Advanced Asphalt Company $448,901 · | ||
| Jun 15, 2018 | 66J17 | LaSalleDistrict 3 | Intermittent milling and resurfacing in various locations in LaSalle County. | — | Executed | Advanced Asphalt Company $980,140 · | ||
| Jun 15, 2018 | 66J29 | BureauGrundyLaSalleDistrict 3 | Class A and Class B pavement patching and pavement marking on I-80 from the Henry/Bureau County line to the Grundy/Will County line. | — | Executed | D. Construction, Inc. $323,732 · | ||
| Jun 15, 2018 | 66J30 | LaSalleDistrict 3 | Class A pavement patching and pavement marking on I-39 from the Marshall/LaSalle County line to south of the Illinois River. | — | Executed | G. M. Sipes Construction, Inc. $200,881 · | ||
| Jun 15, 2018 | 87701 | LaSalleDistrict 3 | Widening and resurfacing CH32 from 0.25 mile west of East 27th Street Road to 0.25 mile east of East 27th Road. | — | Executed | D. Construction, Inc. $299,738 · | ||
| Aug 3, 2018 | 66J39 | LaSalleDistrict 3 | 36.5 miles of weed spraying from the Marshall County line to the Lee County line. | — | Executed | Endrizzi Contracting, Inc $35,624 · | ||
| Nov 9, 2018 | 66A57 | LaSalleDistrict 3 | Bridge replacement of SN 050-0052 with SN 050-0259 over the Little Vermilion River, 3.1 miles east of IL 251. | — | Executed | D. Construction, Inc. $1,569,242 · | ||
| Nov 9, 2018 | 66F12 | LaSalleDistrict 3 | Regrading a failed slope along IL 251 and stabilizing it with a soldier pile retaining wall. Work includes repairs to existing box culvert SN 050-8802. Project is located 2.1 miles south of I-80. | — | Executed | Rausch Infrastructure LLC_DO NOT USE $1,218,205 · | ||
| Nov 9, 2018 | 66J60 | LaSalleDistrict 3 | Sparaying weeks along I-39 from the Marshal County line to the Lee County line. | — | Executed | The Daltons Inc. $34,988 · | ||
| Jan 18, 2019 | 66C58 | LaSalleDistrict 3 | Removal and replacemnt of SN 050-0073 carrying IL 170 over the BNSF Railroad at the Village of Ransom. Work includes embankment, guardrail, landscaping, and pavement striping. | — | Executed | D. Construction, Inc. $3,144,188 · | ||
| Jan 18, 2019 | 66E75 | LaSalleDistrict 3 | Paching, milling, and resurfacing at various locations on IL 23/IL 71 from Freemont St. to 0.2 miles south of McKinley Rd., and 0.1 mile south of Lincoln Place. | — | Executed | Advanced Asphalt Company $4,638,064 · | ||
| Jan 18, 2019 | 66E99 | LaSalleDistrict 3 | 3P milling and resurfacing of US 6 from IL 178 to the west city limits of Ottawa. 7.11 miles. | — | Executed | Advanced Asphalt Company $2,864,832 · | ||
| Jan 18, 2019 | 66J04 | LaSalleDistrict 3 | Removal of the existing parking lot pavement and replacement with a new parking area. | — | Executed | Universal Asphalt & Excavating, Inc. $250,991 · | ||
| Mar 8, 2019 | 66J44 | LaSalleDistrict 3 | Clean and paint structural steel and steel components on SN 050-0188 carrying IL 71 over Covel Creek. | — | Executed | ERA-Valdivia Contractors, Inc. $231,505 · | ||
| Mar 8, 2019 | 66J50 | LaSalleDistrict 3 | Class B pavement patching, curb and gutter, and concrete median removal and replacement on IL 23 from Grace Community Church North of Streator to the intersection of IL 23 and N. 17th Rd. (Richards Road) | — | Executed | Scanlon Excavating & Concrete, Inc. $85,394 · | ||
| Mar 8, 2019 | 66J54 | LaSalleDistrict 3 | crack and joint sealing on IL 251 from 0.3 mile south of N 31st Rd. to I-80, and 1-pass full-width microsurfacing on IL 251 from I-80 to US 6 in Peru. | — | Executed | Asphalt Stone Company $692,705 · | ||
| Mar 8, 2019 | 66J55 | LaSalleDistrict 3 | 9.76 miles of crack and joint sealing on IL 71 from north of I-80 to US 52. | — | Executed | Complete Asphalt Service Co. $32,347 · | ||
| Mar 8, 2019 | 66J75 | KendallLaSalleDistrict 3 | Repair and maintain traffic signals, flashing beacons, roadway lighting, and other electrical services that are requested by "on call" work orders | — | Executed | H & H Electric Co. $46,600 · | ||
| Mar 8, 2019 | 66J76 | BureauLaSalleDistrict 3 | Repair and maintain traffic signals, flashing beacons, roadway lighting, and other electrical services requested by "on-call" work orders. | — | Executed | Laser Electric, Inc. $75,883 · | ||
| Apr 26, 2019 | 66J66 | GrundyLaSalleDistrict 3 | Intermittent milling and resurfacing on IL 47 from Illinois Ave. to south of Jefferson Street in Morris and on IL 170 from US 6 to just south of the CSX Railroad crossing in Seneca. | — | Executed | D. Construction, Inc. $426,301 · | ||
| Apr 26, 2019 | 87708 | LaSalleDistrict 3 | Replace the bridges carrying TR 469 and TR 382 over Covel Creek, 6 miles east of Grand Ridge. | — | Executed | Riber Construction, Inc. $726,079 · | ||
| Apr 26, 2019 | 87714 | LaSalleDistrict 3 | Resurfacing and intersection improvements on FAS Route 263 (CH 5) at Illinois Route 23. | — | Executed | Advanced Asphalt Company $216,236 · | ||
| Jun 14, 2019 | 66J74 | LaSalleDistrict 3 | MEDIAN CROSSOVER and SHOULDER RECONSTRUCTION 0.5 MILES W OF SN 050-0228/0228 TO 0.5 MILES E OF SN 050-0220/0221 IN LASALLE. | — | Executed | Advanced Asphalt Company $744,730 · | ||
| Jun 14, 2019 | 66J84 | LaSalleDistrict 3 | 8.5 miles of intermittent Class A Patching, longitudinal partial depth patching on mainline pavement, and intermittent pavement striping and crack sealing on I-39 from Marshall co Line to 0.4 miles north of CH 54 west of Tonica. | — | Executed | Beniach Construction Co., Inc. $667,472 · | ||
| Jun 14, 2019 | 66J85 | LaSalleDistrict 3 | 6.5 miles of intermittent Class A Patching, longitudinal partial depth patching on mainline pavement, and intermittent pavement striping and crack sealing on I-39 from US 34 to 0.3 mile south of Lee County line. | — | Executed | G. M. Sipes Construction, Inc. $1,030,963 · | ||
| Jun 14, 2019 | 66J88 | LaSalleLivingstonDistrict 3 | 12.4 miles of routing and sealing on IL 23 from just north of Oakley Avenue to Grove Street in Streator, and on IL 23 from 1 mile south of the LaSalle County Line to 9th Street in Cornell. | — | Executed | Denler, Inc. $73,110 · | ||
| Jun 14, 2019 | 66J97 | LaSalleDistrict 3 | Class B pavement patching on US 6 and IL 251 mainline and I-39 ramps at the US 6 and IL 251 interchange. | — | Executed | G. M. Sipes Construction, Inc. $230,890 · | ||
| Jun 14, 2019 | 66K01 | LaSalleDistrict 3 | Class B pavement patching on US 34 from the IL 23 north intersection to the IL 23 south intersection. | — | Executed | Beniach Construction Co., Inc. $303,402 · | ||
| Jun 14, 2019 | 66K10 | GrundyLaSalleDistrict 3 | BRIDGE WASHING AT VARIOUS STRUCTURES OVER THE ILLINOIS RIVER. | — | Executed | All States Painting, Inc. $169,700 · | ||
| Jun 14, 2019 | 66K16 | LaSalleDistrict 3 | RAISING BRIDGE APPROACH SLAB SN 05-0211 (50' OF THE NORTH APPROACH) ON I-39 NORTHBOUND WITH EXPANDING POLYURETHANE HIGH DENSITY FOAM. | — | Executed | D. Construction, Inc. $103,332 · | ||
| Jul 12, 2019 | 66B06 | LaSalleDistrict 3 | 10.9 miles of 3P milling and resurfacing on mainline pavement and pavement striping on IL-18 from IL-251 to WCL of Streator. | — | Executed | Advanced Asphalt Company $4,990,242 · | ||
| Jul 12, 2019 | 66D54 | LaSalleDistrict 3 | 6.3 miles of milling and resurfacing 3.75" of HMA at US-34 mainline and shoulders. Including removing and resurfacing 1" of HMA surface at bridge decks. | — | Executed | Curran Contracting Company $2,407,407 · | ||
| Aug 2, 2019 | 87703 | LaSalleDistrict 3 | Reconstruct the intersection of CH43 and CH33, located 4.0 miles north of Utica. | — | Executed | Advanced Asphalt Company $680,493 · | ||
| Sep 20, 2019 | 87711 | LaSalleDistrict 3 | construction of the extension of Unytite Drive between Plank Road and Donlar Ave. in Peru. | — | Executed | Advanced Asphalt Company $1,487,056 · | ||
| Sep 20, 2019 | 87713 | LaSalleDistrict 3 | Pavement widening and resurfacing on CH 15 from I-80 to IL 71. | — | Executed | D. Construction, Inc. $2,346,622 · | ||
| Nov 8, 2019 | 66F75 | LaSalleDistrict 3 | Deck replacement and beam repair on SN 050-0201 carrying US 52 over Indian Creek, located 2.1 miles E of IL 23. | — | Executed | Civil Constructors, Inc. $2,219,448 · | ||
| Nov 8, 2019 | 66J72 | LaSalleDistrict 3 | Bridge repair SN 050-0163 and 050-0164 on I-39 above BandN RR, 0.8 miles N of US 34. | — | Executed | D. Construction, Inc. $568,614 · | ||
| Nov 8, 2019 | 87706 | LaSalleDistrict 3 | Construction of a shared-use-path and the construction of a pedestrian bridge over I-80, located west of IL 23 from Stevenson Road to Etna Road in the City of Ottawa. | — | Executed | D. Construction, Inc. $1,756,388 · | ||
| Jan 17, 2020 | 66C59 | LaSalleDistrict 3 | Replacing the existing structure carrying CH 9 over I-80 including a new embankment and CH 9 realignment and reconstruction. Resurfacing of the IDOT buildings is also proposed under CI funds. | — | Executed | D. Construction, Inc. $4,314,254 · | ||
| Jan 17, 2020 | 66H21 | LaSalleDistrict 3 | 1.279 miles of superstructure replacements and bridge repairs from LaSalle Rd to Little Vermilion River. | — | Executed | D. Construction, Inc. $16,388,867 · | ||
| Jan 17, 2020 | 66J57 | LaSalleDistrict 3 | Class A patching on the on/off ramp terminals and Class B patching on the on/off ramp pavements and US 52 mainline pavements at the interchanges of FAI 39 and US 52. | — | Executed | G. M. Sipes Construction, Inc. $415,883 · | ||
| Jan 17, 2020 | 66K38 | LaSalleDistrict 3 | Cleaning and painting all structural steel including beams, diaphragms, bearings, drains, steel handrails when specified and all other steel components of SN 050-0165 carrying US Rte 34 over FAI 39 interchange of US 34 and I-39. | — | Executed | ERA-Valdivia Contractors, Inc. $351,131 · | ||
| Mar 6, 2020 | 66J48 | LaSalleDistrict 3 | 2.766 miles of milling and resurfacing and ADA improvements from 0.8 miles W of Boyce Memorial Dr to Champlain St in Ottawa. Widen shoulders 1' at west end of the project. | — | Executed | Advanced Asphalt Company $3,711,915 · | ||
| Mar 6, 2020 | 66K29 | LaSallePutnamDistrict 3 | 3.83 miles of microsurfacing (1-pass) full width on IL 71 from IL 89 to Cedar Creek in Cedar Point. , 8.390 miles of patching from W of I-55 to the Livingston County Line. | — | Executed | A. C. Pavement Striping Co. $306,765 · | ||
| Apr 24, 2020 | 66K45 | LaSalleDistrict 3 | 3P milling and resurfacing (designed overlay) and ADA from Bureau County Line to IL 251 in Mendota. | — | Executed | Advanced Asphalt Company $1,104,965 · | ||
| Jun 12, 2020 | 66J34 | LaSalleDistrict 3 | Class B patching on IL 18 and IL 71 and Class A and B patching on the entrance and exit ramps, at the interchanges of I-39 and IL 18 and IL 71. | — | Executed | G. M. Sipes Construction, Inc. $396,409 · | ||
| Jun 12, 2020 | 66J96 | LaSalleDistrict 3 | HMA milling and resurfacing, PCC pavement replacement, storm sewer replacement, gutter removal, guardrail, and striping on FAP Rte 68 (IL 23) from the N intersection of IL 23 and US 34 to 400' N of SN 050-0042 (BNSF Railway). | — | Executed | Scanlon Excavating & Concrete, Inc. $485,332 · | ||
| Jun 12, 2020 | 66K14 | LaSalleDistrict 3 | Cleaning and painting all structural steel components, including beams/girders, diaphragms, cross and lateral framing, bearings, drains, angle brackets, steel handrails when present, and other related steel components of SN 050-0129 carrying E. 14th Rd (TR 244) over FAI 80 (I-80) 6 miles E of IL 178. | — | Executed | ERA-Valdivia Contractors, Inc. $249,708 · | ||
| Jun 12, 2020 | 66K89 | GrundyLaSalleDistrict 3 | Beam end cleaning and painting on SN 032-0099 (IL 47 in Morris) and SN 050-0219 (CH 15, Marseilles Rd in Marseilles). | — | Executed | ERA-Valdivia Contractors, Inc. $407,093 · | ||
| Jun 12, 2020 | 66K97 | LaSalleDistrict 3 | Class A patching, longitudinal partial depth patching, and pavement marking on I-39 beginning at CH 54 W of Tonica (MP 48.4) and ending 0.8 mile S of 42nd Rd (MP 70.0). , Class A patching, longitudinal partial depth patching, and pavement marking on I-39 beginning at CH 54 W of Tonica (MP 48.4) and ending 0.8 mile S of 42nd Rd (MP 70.0). | — | Executed | G. M. Sipes Construction, Inc. $1,483,376 · | ||
| Jun 12, 2020 | 87692 | LaSalleDistrict 3 | Replace the bridge carrying FAS 263 (CH 5) over the Vermilion River, 4.0 miles east of Leonore. | — | Executed | ICC Group Inc. $8,028,500 · | ||
| Jun 12, 2020 | 87717 | LaSalleDistrict 3 | Sidewalk replacement, paving brick sidewalk, traffic signals and street lighting along IL 18 from the Vermilion River to Wasson Street, on Vemilion Street from Hickory St. to Bridge St. and on Monroe St. from Hickory St. to Bridge St. in Streator. | — | Rejected | H. J. Eppel & Co. $926,471 · | ||
| Jul 31, 2020 | 66L05 | LaSalleDistrict 3 | Crack and Joint Sealing on FAP 623 (US 6) from 0.31 mi of 1-39 to IL 178 in Utica in LaSalle for a total length of 3.57 miles. | — | Executed | Complete Asphalt Service Co. $17,440 · | ||
| Jul 31, 2020 | 66L07 | LaSalleDistrict 3 | Repairing scour/erosion damage under both abutments by filling the existing void under the footings with a self-consolidating concrete and installing a riprap slope at SN 050-0059 carrying FAP 607 (US 52) over Mission Creek approximately 0.3 mi W of IL 71 in LaSalle County. | — | Rejected | D. Construction, Inc. $32,407 · | ||
| Jul 31, 2020 | 87727 | LaSalleDistrict 3 | Replace the bridge carrying CH 5 over Wolf Creek, 2.3 miles east of IL 23. | — | Executed | Riber Construction, Inc. $922,301 · | ||
| Sep 18, 2020 | 66L27 | LaSalleDistrict 3 | Removing and replacing two wing walls of the structure This work is located at Structure No. 050-2539 carrying IL 170 over Armstrong Run. Approximately 3.86 miles south of US 6 in LaSalle County. This project consists of removing and replacing two wing walls of the structure. | — | Executed | D. Construction, Inc. $93,370 · | ||
| Jan 15, 2021 | 66L00 | LaSalleDistrict 3 | Latex overlay, cleaning and painting structural steel and expansion joint repair of SN 050-0171 carrying US 52 over 1-39 in Troy Grove. | — | Executed | D. Construction, Inc. $1,200,540 · | ||
| Mar 5, 2021 | 66B07 | LaSalleDistrict 3 | 3P Milling and Resurfacing (Design Overlay), spot guardrail improvement and minor drainage improvement on FAS FAP 603 (US 52 and IL 23) from 0.5 miles West of 1-39 to IL 23 (S) in LaSalle County IL 23. | — | Executed | Advanced Asphalt Company $3,842,156 · | ||
| Mar 5, 2021 | 66L17 | LaSalleDistrict 3 | Removing and replacing the expansion joints and approach slabs This work is located at two sets of structures, SN 050-0210 and SN 050-0211 carrying FAI 39 Over the Nor-Folk Southern Railway, 1.48 miles north of IL Rte 18 and SN 050-0212 and SN 050-0213 carrying FAI 39 over Sandy creek, 1.23 mi. north of IL Rte. 18. This project consists of removing and replacing the expansion joints and approach slabs. | — | Executed | Gensini Excavating, Inc. $1,393,416 · | ||
| Mar 5, 2021 | 66L23 | LaSalleDistrict 3 | Bridge painting This work is located at Structure No. 050-0011 (EB) and 050-0012 (WB) over Illinois Railway, approximately 2.0 miles East of IL 23 in LaSalle County. This work consists of bridge painting. | — | Executed | ERA-Valdivia Contractors, Inc. $389,847 · | ||
| Mar 5, 2021 | 66L46 | LaSalleDistrict 3 | Regrading a failed slope along IL 251 and stabilizing the area with soldier piles and retaining walls The project is located 2.1 mi south of I-80 with a length of 450 ft. The work consists of regrading a failed slope along IL 251 and stabilizing the area with soldier piles and retaining walls. These will be built into existing box culvert (050-2524) with some drainage items. The final graded slope will be seeded. | — | Executed | D. Construction, Inc. $764,122 · | ||
| Apr 23, 2021 | 66B52 | LaSalleDistrict 3 | The reconstruction of the existing intersection into a PCC roundabout The project is located in the intersection of US 6 and IL 178, north of Utica in LaSalle county and consists of the reconstruction of the existing intersection into a PCC roundabout. The project also includes earthwork, seeding, drainage improvements, permanent lighting and removal of existing traffic equipment. The project length is 0.42 miles. | — | Executed | R. W. Dunteman Company $2,442,377 · | ||
| Apr 23, 2021 | 66L01 | LaSalleDistrict 3 | 0.71 mile. Latex overlay, cleaning and painting of structural steel and expansion joint replacement. SN 050-0200 IL 251 over 1-39; 0.5 Miles north of IL 71. | — | Executed | D. Construction, Inc. $1,921,508 · | ||
| Apr 23, 2021 | 66L33 | LaSalleDistrict 3 | The installation of approximately 5 This project consists of the installation of approximately 5.92 miles of high tension cable median barrier from 1.09 miles South of N 36th Rd to 0.88 miles South of N 42nd Rd in LaSalle County. | — | Executed | Advanced Asphalt Company $1,322,328 · | ||
| Apr 23, 2021 | 66L56 | LaSalleLivingstonDistrict 3 | Placing aggregate wedge shoulder This work is located on FAP 786 (IL 170) beginning at the intersection of IL 170 and N 21st Rd in LaSalle County and ending at the intersection of IL 170 and IL 17 in Livingston County (+/- 12.0 miles). This work consists of placing aggregate wedge shoulder. | — | Executed | Phoenix Corporation of the Quad Cities $135,304 · | ||
| Apr 23, 2021 | 66L61 | KendallLaSalleDistrict 3 | The intent of this project is to repair and maintain traffic signals, flashing beacons, roadway lighting, and other electrical services that are requested by "on call" work orders in Kendall and LaSalle Counties. | — | Executed | H & H Electric Co. $49,983 · | ||
| Apr 23, 2021 | 66L62 | BureauLaSalleDistrict 3 | The intent of this project is to repair and maintain traffic signals, flashing beacons, roadway lighting, and other electrical services that are requested by "on call" work orders in Bureau and LaSalle Counties. | — | Executed | Laser Electric, Inc. $71,890 · | ||
| Apr 23, 2021 | 87743 | LaSalleDistrict 3 | Replace the bridge carrying N. 33rd Road over Pecumsaugan Creek, 0.2 mile east of E. 9th Road. | — | Executed | Riber Construction, Inc. $332,516 · | ||
| Apr 23, 2021 | 87766 | LaSalleDistrict 3 | Resurfacing Crosat Street from 11th Street to US 6 in the City of LaSalle. | — | Executed | Universal Asphalt & Excavating, Inc. $230,520 · | ||
| Jun 11, 2021 | 66B93 | DeKalbLaSalleDistrict 3 | This is a 3P milling and resurfacing project of 3 3/4" on US 34 from IL 23 to East of Somonauk Road in Somonauk. This will also address ADA sidewalk ramps. Other work will include shoulder stone, pavement marking and raised reflectors. | — | Executed | Curran Contracting Company $2,242,143 · | ||
| Jun 11, 2021 | 66D68 | LaSalleDistrict 3 | Milling and resurfacing 3 Work consists of milling and resurfacing 3.75" HMA on mainline of FAP 619 (IL 351/IL 71) in Oglesby and FAP 627 (IL 71) in Jonesville in LaSalle County. The work includes ADA improvements in Oglesby and guardrail replacement in Jonesville. The job length is 1.2 miles. | — | Executed | Advanced Asphalt Company $1,122,141 · | ||
| Jun 11, 2021 | 66H91 | LaSalleDistrict 3 | Deck patching, latex overlay, concrete repairs to substructure, milling and resurfacing, expansion joints, str This work is located at SN 050-0096 carrying IL 178 over the Vermilion River approximately 3.7 mi. South of IL Route 71 in LaSalle County. This work consists of deck patching, latex overlay, concrete repairs to substructure, milling and resurfacing, expansion joints, striping, pavement markers, curb and gutter removal and replacement, pavement widening removal and replacement, and other related construction items. | — | Executed | D. Construction, Inc. $671,375 · | ||
| Jun 11, 2021 | 66K19 | LaSalleDistrict 3 | This project consists of 5.86 miles of shoulder widening and rumble strip installation on_US 34 from E 12th Rd to 0.18 miles West of IL 23 (South leg) in LaSalle County. | — | Executed | Curran Contracting Company $742,928 · | ||
| Jun 11, 2021 | 66K46 | LaSalleDistrict 3 | The work is 2.79 miles long, extending from 0.4 miles south of I-80 to South of Canal St in LaSalle, consisting of 3P Milling and Resurfacing (Designed Overlay), also including ADA ramps. | — | Executed | Advanced Asphalt Company $3,223,912 · | ||
| Jun 11, 2021 | 66L02 | LaSalleDistrict 3 | Spot improvement. Latex overlay and expansion joint replacement on SN 050-0165 carrying US 34 over I-39 in LaSalle county. | — | Executed | D. Construction, Inc. $1,081,507 · | ||
| Jun 11, 2021 | 66L38 | LaSalleDistrict 3 | This project includes 5400' of milling and resurfacing and reconstruction of curves of the Mattheissen State Park main entrance and parking lot area off IL 178 South of the IL 71 and IL 178 intersection. | — | Rejected | Advanced Asphalt Company $1,362,759 · | ||
| Jun 11, 2021 | 66L42 | DeKalbLaSalleDistrict 3 | 3P Milling and Resurfacing (Design Overlay), spot guardrail improvement and minor drainage improvement drainage improvement on FAP 68 (IL 23) from US 30 in Waterman to US 34. | — | Executed | Curran Contracting Company $3,486,053 · | ||
| Jun 11, 2021 | 66L55 | LaSalleDistrict 3 | Expansion joint replacement, deck patching, parapet patching, structural steel repairs This work is located at Structure No. 050-0180 carrying FAP 68 (IL 23/71) over the Illinois River and access road and at Structure No. 050-0182 carrying LaSalle St. over a parking lot, 1.0 mile South of US 6 in Ottawa. This work consists of expansion joint replacement, deck patching, parapet patching, structural steel repairs. | — | Executed | D. Construction, Inc. $2,603,832 · | ||
| Jun 11, 2021 | 66L71 | LaSalleDistrict 3 | Class A Pavement Patching, Subbase removal and replacement and subgrade removal and replacement This work is located at M.M. 42.6 and M.M. 42.9 in the northbound and southbound lanes of FAI Route 39 ( I -39) approximately 1.25 mi. and 1.55 mi. North of IL Route 18 (near Lostant ) in LaSalle County. This project consists of Class A Pavement Patching, Subbase removal and replacement and subgrade removal and replacement. | — | Executed | D. Construction, Inc. $350,229 · | ||
| Jul 30, 2021 | 66K47 | LaSalleDistrict 3 | 3P milling and resurfacing project of 3 3/4" on US 52 / IL 251 from US 52 (N) to 0.3 mile South of the BNSF Railroad overpass in Mendota. This will also address ADA sidewalk ramps. Other work will include shoulder stone, pavement marking, and raised reflectors. | — | Executed | Advanced Asphalt Company $1,959,861 · | ||
| Sep 17, 2021 | 66M08 | BureauLaSalleDistrict 3 | The installation of four changeable speed warning signs on the outer interchange ramps at I-80 and I-39 and th This project consists of the installation of four changeable speed warning signs on the outer interchange ramps at I-80 and I-39 and three changeable speed warning signs at the I-80 and I-180 interchange. | — | Executed | T.M.F. Construction Company $71,655 · | ||
| Nov 5, 2021 | 46924 | LaSalleDistrict 3 | Reconstructing a new retaining wall with associated appurtenances, HMA pavement, aggregate base course, type B The project consists of reconstructing a new retaining wall with associated appurtenances, HMA pavement, aggregate base course, type B gutter, guardrail, pavement markings and other improvements along the Entrance Road to the Buffalo Rock State Park, gross and net length 0.05 mi. | — | Executed | D. Construction, Inc. $637,507 · | ||
| Nov 5, 2021 | 87742 | LaSalleDistrict 3 | Replace the bridge carrying TR 222 over a tributary of Indian Creek, 0.5 mile north of Earville. | — | Executed | Riber Construction, Inc. $815,302 · | ||
| Nov 5, 2021 | 87752 | LaSalleDistrict 3 | Realign and reconstruct the intersection of Commercial Street, Broadway Street, and Main Street in Marseilles. | — | Executed | D. Construction, Inc. $810,168 · | ||
| Jan 21, 2022 | 66J00 | LaSalleDistrict 3 | Bridge replacement (SN 050-0039) at Sutphens Run, 0.6 mile East of E 12th Rd. | — | Executed | D. Construction, Inc. $1,835,069 · |
1–100 of 205Next ›
Lettings: IDOT Transportation Bulletin (Notice of Letting and Contract Detail pages). Planned projects: IDOT Multi-Year Highway Improvement Program (roadway, structure and spot layers on the IDOT open data hub), listed by program year, not let date. "Added" is the first date Bid Potato saw the job. Always confirm against the official proposal before bidding.