(1)I-2
- Let date
- Friday, November 9, 2018
- Contract
- 66F12 · job page
- District
- District 3
- County
- Lasalle
- Highway
- Limits
- Regrading a failed slope along IL 251 and stabilizing it with a soldier pile retaining wall. Work includes repairs to existing box culvert SN 050-8802. Project is located 2.1 miles south of I-80.
Bidders 4
| # | Contractor | Total bid | vs estimate | vs low |
|---|---|---|---|---|
| EE | Engineer's estimate | — | ||
| 1 | Rausch Infrastructure LLC_DO NOT USE Low bidder | $1,218,205 | ||
| 2 | D. Construction, Inc. | $1,276,738 | +4.8% | |
| 3 | Lakes & Rivers Contracting, Inc. | $1,394,601 | +14.5% | |
| 4 | Kovilic Construction Company, Inc. | $1,715,828 | +40.8% |
| Seq | Bid code | Description | Qty | Unit | Estimate | #1 Rausch Infrastr… | #2 D. Construction… | #3 Lakes & Rivers … | #4 Kovilic Constru… |
|---|---|---|---|---|---|---|---|---|---|
| 1 | X0321809 | PERMANENT GRND ANCHOR | 10 | EACH | $14,605.00 | $24,000.00 | $17,500.00 | $10,000.00 | |
| 2 | X0323992 | HELICAL GROUND ANCHOR | 31 | EACH | $6,000.00 | $5,400.00 | $2,500.00 | $5,000.00 | |
| 3 | X0900072 | SLOPE INCLMTR CASING | 57 | FOOT | $266.00 | $200.00 | $100.00 | $500.00 | |
| 4 | X1400348 | GEOTECH INSTRMNT ADJ | 4 | EACH | $1,185.00 | $2,000.00 | $500.00 | $1,000.00 | |
| 5 | X3400004 | RETAINING WALL REMOV | 91 | FOOT | $118.00 | $51.00 | $275.00 | $750.00 | |
| 6 | X6020096 | MH TA 6D W/2 T1FCL RP | 1 | EACH | $14,410.00 | $7,700.00 | $12,500.00 | $7,500.00 | |
| 7 | X6050700 | REMOVE INLET BOX | 2 | EACH | $695.00 | $500.00 | $500.00 | $1,000.00 | |
| 8 | X7015005 | CHANGEABLE MESSAGE SN | 75 | CAL DA | $41.00 | $50.00 | $35.00 | $250.00 | |
| 9 | Z0013798 | CONSTRUCTION LAYOUT | 1 | L SUM | $11,850.00 | $15,000.00 | $10,000.00 | $15,000.00 | |
| 10 | Z0046304 | P UNDR FOR STRUCT 4 | 96 | FOOT | $50.00 | $25.00 | $35.00 | $30.00 | |
| 11 | 20100110 | TREE REMOV 6-15 | 140 | UNIT | $26.00 | $24.20 | $22.00 | $35.00 | |
| 12 | 20100500 | TREE REMOV ACRES | 0.25 | ACRE | $14,220.00 | $13,200.00 | $12,000.00 | $10,000.00 | |
| 13 | 20400800 | FURNISHED EXCAVATION | 140 | CU YD | $128.00 | $30.00 | $75.00 | $100.00 | |
| 14 | 20700220 | POROUS GRAN EMBANK | 503 | CU YD | $66.00 | $50.00 | $85.00 | $100.00 | |
| 15 | 21101615 | TOPSOIL F & P 4 | 1,922 | SQ YD | $9.00 | $6.60 | $6.40 | $7.00 | |
| 16 | 25000300 | SEEDING CL 3 | 0.47 | ACRE | $2,962.00 | $2,750.00 | $4,600.00 | $10,000.00 | |
| 17 | 25000400 | NITROGEN FERT NUTR | 42 | POUND | $2.00 | $2.20 | $3.00 | $10.00 | |
| 18 | 25000500 | PHOSPHORUS FERT NUTR | 42 | POUND | $2.00 | $2.20 | $3.00 | $10.00 | |
| 19 | 25000600 | POTASSIUM FERT NUTR | 42 | POUND | $2.00 | $2.20 | $3.00 | $10.00 | |
| 20 | 25100630 | EROSION CONTR BLANKET | 2,282 | SQ YD | $1.00 | $1.38 | $1.75 | $3.00 | |
| 21 | 28000250 | TEMP EROS CONTR SEED | 94 | POUND | $4.00 | $3.85 | $8.80 | $20.00 | |
| 22 | 28000400 | PERIMETER EROS BAR | 217 | FOOT | $8.00 | $6.60 | $5.60 | $5.00 | |
| 23 | 28000500 | INLET & PIPE PROTECT | 1 | EACH | $237.00 | $150.00 | $170.00 | $250.00 | |
| 24 | 28100107 | STONE RIPRAP CL A4 | 41 | SQ YD | $95.00 | $65.00 | $150.00 | $150.00 | |
| 25 | 28200200 | FILTER FABRIC | 41 | SQ YD | $19.00 | $3.00 | $2.00 | $10.00 | |
| 26 | 31100910 | SUB GRAN MAT A 12 | 210 | SQ YD | $44.00 | $20.00 | $25.00 | $33.00 | |
| 27 | 44004000 | PAVED DITCH REMOVAL | 60 | FOOT | $65.00 | $20.00 | $75.00 | $25.00 | |
| 28 | 44004250 | PAVED SHLD REMOVAL | 199 | SQ YD | $42.00 | $15.00 | $30.00 | $27.00 | |
| 29 | 48101200 | AGGREGATE SHLDS B | 46 | TON | $74.00 | $35.00 | $40.00 | $75.00 | |
| 30 | 48203037 | HMA SHOULDERS 10 | 145 | SQ YD | $59.00 | $60.00 | $110.00 | $120.00 | |
| 31 | 50200100 | STRUCTURE EXCAVATION | 335 | CU YD | $51.00 | $35.00 | $100.00 | $150.00 | |
| 32 | 50300225 | CONC STRUCT | 18.8 | CU YD | $486.00 | $950.00 | $2,500.00 | $2,000.00 | |
| 33 | 50500505 | STUD SHEAR CONNECTORS | 14 | EACH | $174.00 | $25.00 | $25.00 | $50.00 | |
| 34 | 50800105 | REINFORCEMENT BARS | 1,100 | POUND | $5.00 | $3.00 | $2.00 | $5.00 | |
| 35 | 51500100 | NAME PLATES | 2 | EACH | $954.00 | $500.00 | $500.00 | $750.00 | |
| 36 | 52200100 | FUR SOLDIER PILES HP | 745 | FOOT | $200.00 | $100.00 | $225.00 | $100.00 | |
| 37 | 52200200 | DRILL SET SLD PI SOIL | 1,414 | CU FT | $11.00 | $75.00 | $10.00 | $100.00 | |
| 38 | 52200205 | DRILL SET SLD PI ROCK | 251 | CU FT | $17.00 | $250.00 | $25.00 | $300.00 | |
| 39 | 52200260 | PRECAST CONCRETE LAG | 2,177 | SQ FT | $28.00 | $38.00 | $55.00 | $50.00 | |
| 40 | 54213657 | PRC FLAR END SEC 12 | 1 | EACH | $3,149.00 | $600.00 | $1,500.00 | $750.00 | |
| 41 | 54213663 | PRC FLAR END SEC 18 | 2 | EACH | $1,915.00 | $700.00 | $1,750.00 | $1,000.00 | |
| 42 | 550A0050 | STORM SEW CL A 1 12 | 15 | FOOT | $190.00 | $60.00 | $100.00 | $150.00 | |
| 43 | 550A0090 | STORM SEW CL A 1 18 | 48 | FOOT | $149.00 | $75.00 | $125.00 | $150.00 | |
| 44 | 550A0180 | STORM SEW CL A 1 42 | 198 | FOOT | $231.00 | $125.00 | $175.00 | $350.00 | |
| 45 | 550A0340 | STORM SEW CL A 2 12 | 136 | FOOT | $163.00 | $60.00 | $105.00 | $100.00 | |
| 46 | 55100700 | STORM SEWER REM 15 | 176 | FOOT | $20.00 | $16.00 | $35.00 | $50.00 | |
| 47 | 59100100 | GEOCOMPOSITE WALL DR | 226 | SQ YD | $29.00 | $30.00 | $25.00 | $5.00 | |
| 48 | 60100060 | CONC HDWL FOR P DRAIN | 1 | EACH | $1,388.00 | $300.00 | $500.00 | $300.00 | |
| 49 | 60108200 | PIPE UNDERDRAIN 6 SP | 156 | FOOT | $32.00 | $25.00 | $75.00 | $30.00 | |
| 50 | 60218400 | MAN TA 4 DIA T1F CL | 1 | EACH | $7,597.00 | $2,500.00 | $4,000.00 | $5,000.00 | |
| 51 | 60223700 | MAN TA 6 DIA T1F OL | 1 | EACH | $11,957.00 | $4,000.00 | $10,000.00 | $7,500.00 | |
| 52 | 60240328 | INLETS TB T24F&G | 3 | EACH | $3,041.00 | $1,750.00 | $4,500.00 | $2,000.00 | |
| 53 | 60608582 | COMB CC&G TM4.24 | 163 | FOOT | $46.00 | $26.00 | $40.00 | $50.00 | |
| 54 | 63000001 | SPBGR TY A 6FT POSTS | 150 | FOOT | $38.00 | $35.50 | $27.00 | $50.00 | |
| 55 | 63100167 | TR BAR TRM T1 SPL TAN | 1 | EACH | $3,163.00 | $2,935.00 | $5,500.00 | $4,500.00 | |
| 56 | 63200310 | GUARDRAIL REMOV | 200 | FOOT | $7.00 | $6.50 | $10.00 | $10.00 | |
| 57 | 66900200 | NON SPL WASTE DISPOSL | 2,771 | CU YD | $55.00 | $75.00 | $112.50 | $150.00 | |
| 58 | 66900450 | SPL WASTE PLNS/REPORT | 1 | L SUM | $5,925.00 | $7,500.00 | $3,150.00 | $5,000.00 | |
| 59 | 66900530 | SOIL DISPOSAL ANALY | 1 | EACH | $2,962.00 | $1,650.00 | $1,500.00 | $2,500.00 | |
| 60 | 67000400 | ENGR FIELD OFFICE A | 3 | CAL MO | $7,110.00 | $3,000.00 | $3,000.00 | $1,000.00 | |
| 61 | 67100100 | MOBILIZATION | 1 | L SUM | $72,000.00 | $45,000.00 | $78,000.00 | $50,000.00 | |
| 62 | 67201100 | SEAL ABAN MONIT WELLS | 3 | EACH | $1,990.00 | $2,500.00 | $1,275.00 | $1,500.00 | |
| 63 | 70102630 | TR CONT & PROT 701601 | 1 | L SUM | $8,058.00 | $10,000.00 | $6,800.00 | $30,000.00 | |
| 64 | 70400100 | TEMP CONC BARRIER | 250 | FOOT | $51.00 | $30.00 | $75.00 | $40.00 | |
| 65 | 70600250 | IMP ATTN TEMP NRD TL3 | 1 | EACH | $4,858.00 | $3,500.00 | $4,100.00 | $4,500.00 | |
| 66 | 72501000 | TERMINAL MARKER - DA | 1 | EACH | $59.00 | $55.00 | $40.00 | $50.00 | |
| 67 | 78200006 | GRDRAIL REF TYPE B | 2 | EACH | $17.00 | $16.50 | $15.00 | $50.00 |