(50-4)K&PP
Bidders 2
| # | Contractor | Total bid | vs estimate | vs low |
|---|---|---|---|---|
| EE | Engineer's estimate | — | ||
| 1 | G. M. Sipes Construction, Inc. Low bidder | $230,890 | ||
| 2 | ERA-Valdivia Contractors, Inc. | $287,827 | +24.7% |
| Seq | Bid code | Description | Qty | Unit | Estimate | #1 G. M. Sipes Con… | #2 ERA-Valdivia Co… |
|---|---|---|---|---|---|---|---|
| 1 | Z0017099 | DOWEL BAR ASSEMBLY | 14 | EACH | $75.00 | $100.00 | |
| 2 | Z0030850 | TEMP INFO SIGNING | 42 | SQ FT | $1.00 | $35.00 | |
| 3 | 42000060 | WELDED WIRE REINF | 395 | SQ YD | $7.50 | $25.00 | |
| 4 | 44200934 | CL B PATCH T2 8 | 66 | SQ YD | $170.00 | $215.00 | |
| 5 | 44200942 | CL B PATCH T3 8 | 21 | SQ YD | $170.00 | $215.00 | |
| 6 | 44200970 | CL B PATCH T2 10 | 585 | SQ YD | $180.00 | $175.00 | |
| 7 | 44200974 | CL B PATCH T3 10 | 242 | SQ YD | $180.00 | $172.00 | |
| 8 | 44200976 | CL B PATCH T4 10 | 116 | SQ YD | $180.00 | $168.00 | |
| 9 | 44201299 | DOWEL BARS 1 1/2 | 1,700 | EACH | $15.00 | $22.00 | |
| 10 | 44213200 | SAW CUTS | 4,330 | FOOT | $0.0100 | $3.50 | |
| 11 | 44213204 | TIE BARS 3/4 | 25 | EACH | $12.50 | $45.00 | |
| 12 | 67100100 | MOBILIZATION | 1 | L SUM | $10,000.00 | $11,070.00 | |
| 13 | 70100450 | TRAF CONT-PROT 701201 | 1 | L SUM | $3,000.00 | $12,480.00 | |
| 14 | 70100825 | TRAF CONT-PROT 701456 | 1 | L SUM | $3,000.00 | $15,000.00 | |
| 15 | 70107025 | CHANGEABLE MESSAGE SN | 6 | CAL DA | $75.00 | $110.00 |