15-00222-02-WR
Bidders 2
| # | Contractor | Total bid | vs estimate | vs low |
|---|---|---|---|---|
| EE | Engineer's estimate | — | ||
| 1 | D. Construction, Inc. Low bidder | $2,346,622 | ||
| 2 | Advanced Asphalt Company | $2,623,778 | +11.8% |
| Seq | Bid code | Description | Qty | Unit | Estimate | #1 D. Construction… | #2 Advanced Asphal… |
|---|---|---|---|---|---|---|---|
| 1 | X0900064 | MEMBR WTRPR SYS B STR | 186 | SQ YD | $75.00 | $45.00 | |
| 2 | X6330725 | SPBGR (SHORT RADIUS) | 88 | FOOT | $38.50 | $35.00 | |
| 3 | X7010216 | TRAF CONT & PROT SPL | 1 | L SUM | $15,000.00 | $15,860.00 | |
| 4 | Z0013798 | CONSTRUCTION LAYOUT | 1 | L SUM | $12,000.00 | $9,500.00 | |
| 5 | Z0016702 | DETOUR SIGNING | 1 | L SUM | $25,411.65 | $36,000.00 | |
| 6 | Z0033700 | LONG JOINT SEALANT | 17,350 | FOOT | $2.37 | $2.25 | |
| 7 | Z0076600 | TRAINEES | 2,000 | HOUR | $0.8000 | $0.8000 | |
| 8 | Z0076604 | TRAINEES TPG | 2,000 | HOUR | $15.00 | $15.00 | |
| 9 | 20200100 | EARTH EXCAVATION | 876 | CU YD | $20.00 | $30.00 | |
| 10 | 20200500 | EARTH EXC WID | 2,124 | CU YD | $25.00 | $50.00 | |
| 11 | 20201200 | REM & DISP UNS MATL | 69 | CU YD | $28.00 | $30.00 | |
| 12 | 20400800 | FURNISHED EXCAVATION | 1,347 | CU YD | $22.00 | $30.00 | |
| 13 | 20700220 | POROUS GRAN EMBANK | 526 | CU YD | $45.00 | $50.00 | |
| 14 | 20800150 | TRENCH BACKFILL | 207 | CU YD | $45.00 | $35.00 | |
| 15 | 21101615 | TOPSOIL F & P 4 | 69,402 | SQ YD | $1.00 | $3.95 | |
| 16 | 21301052 | EXPLOR TRENCH 52 | 100 | FOOT | $25.00 | $8.00 | |
| 17 | 25000210 | SEEDING CL 2A | 13.75 | ACRE | $4,847.70 | $1,000.00 | |
| 18 | 25000400 | NITROGEN FERT NUTR | 1,238 | POUND | $1.10 | $1.50 | |
| 19 | 25000500 | PHOSPHORUS FERT NUTR | 1,238 | POUND | $1.10 | $1.50 | |
| 20 | 25000600 | POTASSIUM FERT NUTR | 1,238 | POUND | $1.10 | $1.50 | |
| 21 | 25100115 | MULCH METHOD 2 | 13.75 | ACRE | $1,210.00 | $1,000.00 | |
| 22 | 25100630 | EROSION CONTR BLANKET | 69,402 | SQ YD | $0.8800 | $1.05 | |
| 23 | 28000250 | TEMP EROS CONTR SEED | 4,095 | POUND | $1.10 | $3.00 | |
| 24 | 28000305 | TEMP DITCH CHECKS | 3,090 | FOOT | $6.60 | $10.00 | |
| 25 | 28000400 | PERIMETER EROS BAR | 7,236 | FOOT | $3.08 | $1.75 | |
| 26 | 28000500 | INLET & PIPE PROTECT | 35 | EACH | $137.50 | $150.00 | |
| 27 | 28000510 | INLET FILTERS | 1 | EACH | $220.00 | $225.00 | |
| 28 | 28100107 | STONE RIPRAP CL A4 | 30 | SQ YD | $75.00 | $71.00 | |
| 29 | 28200200 | FILTER FABRIC | 30 | SQ YD | $10.00 | $10.00 | |
| 30 | 28400100 | GABIONS | 2 | CU YD | $2,000.00 | $500.00 | |
| 31 | 31100300 | SUB GRAN MAT A 4 | 13,541 | SQ YD | $6.45 | $7.00 | |
| 32 | 35101800 | AGG BASE CSE B 6 | 631 | SQ YD | $10.00 | $12.00 | |
| 33 | 35600708 | HMA BC WID 8 | 10,316 | SQ YD | $35.00 | $35.00 | |
| 34 | 40200500 | AGG SURF CSE A 6 | 875 | SQ YD | $9.00 | $12.00 | |
| 35 | 40600290 | BIT MATLS TACK CT | 12,249 | POUND | $0.0100 | $1.00 | |
| 36 | 40603085 | HMA BC IL-19.0 N70 | 5,857 | TON | $68.00 | $70.00 | |
| 37 | 40603340 | HMA SC "D" N70 | 3,637 | TON | $70.00 | $74.00 | |
| 38 | 40800050 | INCIDENTAL HMA SURF | 77 | TON | $85.00 | $150.00 | |
| 39 | 44000200 | DRIVE PAVEMENT REM | 538 | SQ YD | $8.00 | $8.00 | |
| 40 | 44004000 | PAVED DITCH REMOVAL | 18 | FOOT | $20.00 | $20.00 | |
| 41 | 44201737 | CL D PATCH T1 8 | 61 | SQ YD | $75.00 | $165.00 | |
| 42 | 44201741 | CL D PATCH T2 8 | 20 | SQ YD | $75.00 | $135.00 | |
| 43 | 44201745 | CL D PATCH T3 8 | 84 | SQ YD | $70.00 | $135.00 | |
| 44 | 44201747 | CL D PATCH T4 8 | 127 | SQ YD | $65.00 | $135.00 | |
| 45 | 48101500 | AGGREGATE SHLDS B 6 | 14,597 | SQ YD | $7.50 | $8.00 | |
| 46 | 48203021 | HMA SHOULDERS 6 | 1,230 | SQ YD | $25.00 | $26.70 | |
| 47 | 50100300 | REM EXIST STRUCT N1 | 1 | EACH | $7,750.00 | $12,500.00 | |
| 48 | 50100400 | REM EXIST STRUCT N2 | 1 | EACH | $4,500.00 | $5,000.00 | |
| 49 | 50100500 | REM EXIST STRUCT N3 | 1 | EACH | $4,000.00 | $5,000.00 | |
| 50 | 50105220 | PIPE CULVERT REMOV | 968 | FOOT | $15.00 | $30.00 | |
| 51 | 54001001 | BOX CUL END SEC C1 | 2 | EACH | $18,000.00 | $22,000.00 | |
| 52 | 54001002 | BOX CUL END SEC C2 | 2 | EACH | $5,000.00 | $7,000.00 | |
| 53 | 54001003 | BOX CUL END SEC C3 | 2 | EACH | $3,500.00 | $4,000.00 | |
| 54 | 54001004 | BOX CUL END SEC C4 | 2 | EACH | $5,500.00 | $7,000.00 | |
| 55 | 54010302 | PCBC 3X2 | 34 | FOOT | $300.00 | $500.00 | |
| 56 | 54010403 | PCBC 4X3 | 37 | FOOT | $350.00 | $510.00 | |
| 57 | 54010504 | PCBC 5X4 | 54 | FOOT | $425.00 | $500.00 | |
| 58 | 54011006 | PCBC 10X6 | 42 | FOOT | $850.00 | $925.00 | |
| 59 | 542A0220 | P CUL CL A 1 15 | 11 | FOOT | $70.00 | $115.00 | |
| 60 | 542A0223 | P CUL CL A 1 18 | 314 | FOOT | $63.50 | $75.00 | |
| 61 | 542A0229 | P CUL CL A 1 24 | 4 | FOOT | $110.00 | $310.00 | |
| 62 | 542A5485 | P CUL CL A 1 EQRS 30 | 36 | FOOT | $175.00 | $140.00 | |
| 63 | 542D0217 | P CUL CL D 1 12 | 34 | FOOT | $50.00 | $40.00 | |
| 64 | 542D0220 | P CUL CL D 1 15 | 582 | FOOT | $60.00 | $45.00 | |
| 65 | 542D0223 | P CUL CL D 1 18 | 64 | FOOT | $70.00 | $60.00 | |
| 66 | 542D0235 | P CUL CL D 1 30 | 39 | FOOT | $100.00 | $75.00 | |
| 67 | 54213660 | PRC FLAR END SEC 15 | 1 | EACH | $750.00 | $900.00 | |
| 68 | 54213663 | PRC FLAR END SEC 18 | 18 | EACH | $800.00 | $950.00 | |
| 69 | 54213669 | PRC FLAR END SEC 24 | 1 | EACH | $1,050.00 | $1,125.00 | |
| 70 | 54214515 | PRC FL END S EQ RS 30 | 2 | EACH | $1,300.00 | $2,000.00 | |
| 71 | 54262712 | METAL FL END SEC 12" | 2 | EACH | $425.00 | $195.00 | |
| 72 | 54262715 | METAL FL END SEC 15" | 36 | EACH | $400.00 | $260.00 | |
| 73 | 54262718 | METAL FL END SEC 18" | 4 | EACH | $500.00 | $325.00 | |
| 74 | 54262730 | METAL FL END SEC 30" | 2 | EACH | $875.00 | $550.00 | |
| 75 | 59100100 | GEOCOMPOSITE WALL DR | 186 | SQ YD | $35.00 | $20.00 | |
| 76 | 60100935 | PIPE DRAINS 10 | 69 | FOOT | $80.00 | $8.75 | |
| 77 | 60218300 | MAN TA 4 DIA T1F OL | 1 | EACH | $2,900.00 | $2,000.00 | |
| 78 | 63000001 | SPBGR TY A 6FT POSTS | 263 | FOOT | $25.30 | $23.00 | |
| 79 | 63000360 | LSG OV CUL 18'9" SPAN | 88 | FOOT | $25.30 | $23.00 | |
| 80 | 63100167 | TR BAR TRM T1 SPL TAN | 8 | EACH | $3,063.50 | $2,785.00 | |
| 81 | 63200310 | GUARDRAIL REMOV | 589 | FOOT | $7.00 | $10.00 | |
| 82 | 67100100 | MOBILIZATION | 1 | L SUM | $100,000.00 | $56,000.00 | |
| 83 | 70106800 | CHANGEABLE MESSAGE SN | 28 | CAL MO | $1,500.00 | $125.00 | |
| 84 | 70300100 | SHORT TERM PAVT MKING | 3,572 | FOOT | $0.0100 | $0.5500 | |
| 85 | 70300150 | SHRT TRM PAVT MK REM | 1,345 | SQ FT | $0.0100 | $1.35 | |
| 86 | 72501000 | TERMINAL MARKER - DA | 8 | EACH | $38.50 | $35.00 | |
| 87 | 78001110 | PAINT PVT MK LINE 4 | 116,570 | FOOT | $0.1700 | $0.1000 | |
| 88 | 78003180 | PREF PL PM TB LINE 24 | 23 | FOOT | $44.00 | $83.00 | |
| 89 | 78200005 | GRDRAIL REF TYPE A | 22 | EACH | $8.80 | $8.00 |