(30,31,31X)RS-4
- Let date
- Friday, June 11, 2021
- Contract
- 66L42 · job page
- District
- District 3
- County
- Dekalb, Lasalle
- Highway
- Limits
- 3P Milling and Resurfacing (Design Overlay), spot guardrail improvement and minor drainage improvement drainage improvement on FAP 68 (IL 23) from US 30 in Waterman to US 34.
Bidders 2
| # | Contractor | Total bid | vs estimate | vs low |
|---|---|---|---|---|
| EE | Engineer's estimate | — | ||
| 1 | Curran Contracting Company Low bidder | $3,486,053 | ||
| 2 | Builders Paving, LLC | $3,908,888 | +12.1% |
| Seq | Bid code | Description | Qty | Unit | Estimate | #1 Curran Contract… | #2 Builders Paving… |
|---|---|---|---|---|---|---|---|
| 1 | X0327809 | LINEAR DELIN PANELS 4 | 23 | EACH | $150.00 | $150.00 | |
| 2 | X0358300 | REM & RELAY END SECT | 2 | EACH | $2,698.00 | $2,698.00 | |
| 3 | X4401198 | HMA SURF REM VAR DP | 5,991 | SQ YD | $7.95 | $9.00 | |
| 4 | X5010520 | REM C BOX CUL END SEC | 2 | EACH | $1,455.00 | $1,455.00 | |
| 5 | X5420615 | PIPE CULV CLEANED 15 | 44 | FOOT | $18.00 | $25.00 | |
| 6 | X5420618 | PIPE CULV CLEANED 18 | 84 | FOOT | $20.00 | $25.00 | |
| 7 | X7830070 | GRV RCSD PVT MRKG 5 | 11,241 | FOOT | $0.4500 | $0.9000 | |
| 8 | X7830076 | GRV RCSD PVT MRKG 9 | 444 | FOOT | $0.9000 | $1.76 | |
| 9 | X7830090 | GRV RCSD PVT MRKG 25 | 90 | FOOT | $2.70 | $4.50 | |
| 10 | Z0000100 | ABANDON EX CULVERT | 1 | EACH | $5,291.00 | $5,291.00 | |
| 11 | Z0005216 | HMA STAB 6 AT SPBGR | 410 | SQ YD | $37.00 | $62.00 | |
| 12 | Z0005300 | BOX CUL TO BE CLEANED | 1 | EACH | $16,800.00 | $25,000.00 | |
| 13 | Z0030850 | TEMP INFO SIGNING | 42 | SQ FT | $22.00 | $38.75 | |
| 14 | Z0033700 | LONG JOINT SEALANT | 55,499 | FOOT | $2.15 | $2.15 | |
| 15 | Z0034105 | MATL TRANSFER DEVICE | 37,291 | TON | $1.65 | $0.0100 | |
| 16 | Z0041500 | PLUG EX CULVERTS | 1 | EACH | $5,291.00 | $5,291.00 | |
| 17 | Z0048665 | RR PROT LIABILITY INS | 1 | L SUM | $5,000.00 | $10,000.00 | |
| 18 | Z0055300 | RUMBLE STRIP | 3 | EACH | $4,000.00 | $1,500.00 | |
| 19 | Z0058668 | GRAD & SHAP FORESLOPE | 16 | SQ YD | $100.00 | $45.00 | |
| 20 | 20200100 | EARTH EXCAVATION | 23.6 | CU YD | $161.00 | $160.00 | |
| 21 | 20400800 | FURNISHED EXCAVATION | 51.5 | CU YD | $123.00 | $120.00 | |
| 22 | 20800150 | TRENCH BACKFILL | 14 | CU YD | $67.00 | $67.00 | |
| 23 | 21400100 | GRADING & SHAP DITCH | 430 | FOOT | $15.00 | $16.00 | |
| 24 | 25000200 | SEEDING CL 2 | 0.25 | ACRE | $15,500.00 | $2,200.00 | |
| 25 | 28100107 | STONE RIPRAP CL A4 | 20 | SQ YD | $240.00 | $240.00 | |
| 26 | 28200200 | FILTER FABRIC | 20 | SQ YD | $8.00 | $8.00 | |
| 27 | 40600290 | BIT MATLS TACK CT | 122,674 | POUND | $0.0100 | $0.0100 | |
| 28 | 40600400 | MIX CR JTS FLANGEWYS | 53.1 | TON | $355.00 | $600.00 | |
| 29 | 40600900 | HMA BC HM N50 | 88.8 | TON | $220.00 | $95.00 | |
| 30 | 40600990 | TEMPORARY RAMP | 1,201 | SQ YD | $15.75 | $10.00 | |
| 31 | 40602978 | HMA BC IL-9.5 N50 | 19,874 | TON | $54.00 | $60.00 | |
| 32 | 40604050 | HMA SC IL-9.5 C N50 | 17,417 | TON | $55.00 | $60.00 | |
| 33 | 40800050 | INCIDENTAL HMA SURF | 921 | TON | $115.00 | $130.00 | |
| 34 | 44000156 | HMA SURF REM 1 3/4 | 272 | SQ YD | $8.75 | $6.75 | |
| 35 | 44000164 | HMA SURF REM 3 3/4 | 177,451 | SQ YD | $2.70 | $3.65 | |
| 36 | 44201765 | CL D PATCH T2 10 | 14 | SQ YD | $200.00 | $250.00 | |
| 37 | 48102100 | AGG WEDGE SHLD TYPE B | 2,115 | TON | $27.75 | $32.00 | |
| 38 | 50102400 | CONC REM | 8 | CU YD | $0.0100 | $0.0100 | |
| 39 | 54260315 | TRVRS PIPE GRT CON ES | 4 | FOOT | $280.00 | $280.00 | |
| 40 | 54390140 | INSERT CUL LIN 18 | 40 | FOOT | $478.00 | $478.00 | |
| 41 | 63000001 | SPBGR TY A 6FT POSTS | 925 | FOOT | $27.00 | $27.00 | |
| 42 | 63000350 | LSG OV CUL 12'6" SPAN | 250 | FOOT | $29.00 | $29.00 | |
| 43 | 63100167 | TR BAR TRM T1 SPL TAN | 8 | EACH | $2,855.00 | $2,855.00 | |
| 44 | 63200310 | GUARDRAIL REMOV | 1,575 | FOOT | $5.00 | $5.00 | |
| 45 | 63500105 | DELINEATORS | 22 | EACH | $55.00 | $55.00 | |
| 46 | 64200108 | SHOULDER RUM STRIP 8 | 45,498 | FOOT | $0.3600 | $0.4500 | |
| 47 | 66700205 | PERM SURV MKRS T1 | 12 | EACH | $700.00 | $700.00 | |
| 48 | 66900200 | NON SPL WASTE DISPOSL | 120 | CU YD | $75.00 | $110.00 | |
| 49 | 66900530 | SOIL DISPOSAL ANALY | 4 | EACH | $1,450.00 | $1,500.00 | |
| 50 | 66901001 | REG SUB P-CONST PLAN | 1 | L SUM | $2,300.00 | $2,500.00 | |
| 51 | 66901003 | REG SUB F CON REPORT | 1 | L SUM | $2,000.00 | $2,500.00 | |
| 52 | 66901006 | REG SUB MON | 5 | CAL DA | $970.00 | $750.00 | |
| 53 | 67000400 | ENGR FIELD OFFICE A | 4 | CAL MO | $3,150.00 | $3,250.00 | |
| 54 | 67100100 | MOBILIZATION | 1 | L SUM | $162,500.00 | $201,583.78 | |
| 55 | 70100460 | TRAF CONT-PROT 701306 | 1 | L SUM | $16,900.00 | $21,800.00 | |
| 56 | 70300100 | SHORT TERM PAVT MKING | 7,781 | FOOT | $0.4000 | $1.15 | |
| 57 | 70300150 | SHRT TRM PAVT MK REM | 2,593 | SQ FT | $1.85 | $1.55 | |
| 58 | 72501000 | TERMINAL MARKER - DA | 8 | EACH | $35.00 | $35.00 | |
| 59 | 78000100 | THPL PVT MK LTR & SYM | 186 | SQ FT | $4.20 | $4.15 | |
| 60 | 78000200 | THPL PVT MK LINE 4 | 16,284 | FOOT | $0.7000 | $0.6500 | |
| 61 | 78000500 | THPL PVT MK LINE 8 | 850 | FOOT | $1.05 | $1.38 | |
| 62 | 78000600 | THPL PVT MK LINE 12 | 531 | FOOT | $2.10 | $2.07 | |
| 63 | 78000650 | THPL PVT MK LINE 24 | 90 | FOOT | $4.20 | $4.15 | |
| 64 | 78001110 | PAINT PVT MK LINE 4 | 250,274 | FOOT | $0.1100 | $0.1300 | |
| 65 | 78001130 | PAINT PVT MK LINE 6 | 23,626 | FOOT | $0.1700 | $0.2100 | |
| 66 | 78003180 | PREF PL PM TB LINE 24 | 90 | FOOT | $12.00 | $19.00 | |
| 67 | 78100100 | RAISED REFL PAVT MKR | 749 | EACH | $28.00 | $32.00 | |
| 68 | 78200005 | GRDRAIL REF TYPE A | 23 | EACH | $8.00 | $8.00 | |
| 69 | 78300200 | RAISED REF PVT MK REM | 749 | EACH | $12.00 | $11.00 |