(1)I-3
- Let date
- Friday, March 5, 2021
- Contract
- 66L46 · job page
- District
- District 3
- County
- Lasalle
- Highway
- Limits
- The project is located 2.1 mi south of I-80 with a length of 450 ft. The work consists of regrading a failed slope along IL 251 and stabilizing the area with soldier piles and retaining walls. These will be built into existing box culvert (050-2524) with some drainage items. The final graded slope will be seeded.
- Classification
- Regrading a failed slope along IL 251 and stabilizing the area with soldier piles and retaining walls
Bidders 2
| # | Contractor | Total bid | vs estimate | vs low |
|---|---|---|---|---|
| EE | Engineer's estimate | — | ||
| 1 | D. Construction, Inc. Low bidder | $764,122 | ||
| 2 | Rausch Infrastructure, LLC | $1,489,222 | +94.9% |
| Seq | Bid code | Description | Qty | Unit | Estimate | #1 D. Construction… | #2 Rausch Infrastr… |
|---|---|---|---|---|---|---|---|
| 1 | X0321809 | PERMANENT GRND ANCHOR | 25 | EACH | $6,100.00 | $10,000.00 | |
| 2 | X0324864 | DRAIN CONNECTIONS | 63 | FOOT | $90.00 | $1,100.00 | |
| 3 | X0900072 | SLOPE INCLMTR CASING | 33 | FOOT | $260.00 | $53.00 | |
| 4 | X1400348 | GEOTECH INSTRMNT ADJ | 2 | EACH | $4,290.00 | $1,100.00 | |
| 5 | Z0013798 | CONSTRUCTION LAYOUT | 1 | L SUM | $15,000.00 | $35,000.00 | |
| 6 | 20200100 | EARTH EXCAVATION | 1,379 | CU YD | $25.00 | $140.00 | |
| 7 | 20400800 | FURNISHED EXCAVATION | 996 | CU YD | $29.00 | $31.00 | |
| 8 | 20700220 | POROUS GRAN EMBANK | 24 | CU YD | $80.00 | $70.00 | |
| 9 | 25000210 | SEEDING CL 2A | 0.1 | ACRE | $3,300.00 | $3,500.00 | |
| 10 | 25000300 | SEEDING CL 3 | 0.9 | ACRE | $1,650.00 | $1,700.00 | |
| 11 | 25000400 | NITROGEN FERT NUTR | 90 | POUND | $2.20 | $2.30 | |
| 12 | 25000500 | PHOSPHORUS FERT NUTR | 90 | POUND | $2.20 | $2.30 | |
| 13 | 25000600 | POTASSIUM FERT NUTR | 90 | POUND | $2.20 | $2.30 | |
| 14 | 25100635 | HD EROS CONTR BLANKET | 2,533 | SQ YD | $1.93 | $2.00 | |
| 15 | 28000250 | TEMP EROS CONTR SEED | 100 | POUND | $4.40 | $4.70 | |
| 16 | 28000305 | TEMP DITCH CHECKS | 80 | FOOT | $110.00 | $11.00 | |
| 17 | 28000400 | PERIMETER EROS BAR | 449 | FOOT | $5.50 | $5.00 | |
| 18 | 28000500 | INLET & PIPE PROTECT | 5 | EACH | $203.50 | $217.00 | |
| 19 | 28100107 | STONE RIPRAP CL A4 | 63 | SQ YD | $80.00 | $170.00 | |
| 20 | 28200200 | FILTER FABRIC | 63 | SQ YD | $5.50 | $16.00 | |
| 21 | 50200100 | STRUCTURE EXCAVATION | 91 | CU YD | $45.00 | $75.00 | |
| 22 | 50300225 | CONC STRUCT | 11.6 | CU YD | $1,200.00 | $1,200.00 | |
| 23 | 50500505 | STUD SHEAR CONNECTORS | 7 | EACH | $50.00 | $240.00 | |
| 24 | 50800105 | REINFORCEMENT BARS | 645 | POUND | $4.50 | $9.00 | |
| 25 | 51500100 | NAME PLATES | 1 | EACH | $600.00 | $1,100.00 | |
| 26 | 52200015 | PERM SHT PILING | 1,007 | SQ FT | $52.00 | $140.00 | |
| 27 | 52200200 | DRILL SET SLD PI SOIL | 2,319 | CU FT | $15.00 | $60.00 | |
| 28 | 52200205 | DRILL SET SLD PI ROCK | 2,030 | CU FT | $70.00 | $118.00 | |
| 29 | 52200260 | PRECAST CONCRETE LAG | 190 | SQ FT | $50.00 | $87.00 | |
| 30 | 55100700 | STORM SEWER REM 15 | 176 | FOOT | $15.00 | $45.00 | |
| 31 | 59100100 | GEOCOMPOSITE WALL DR | 15 | SQ YD | $35.00 | $215.00 | |
| 32 | 59300100 | CONTR LOW-STRENG MATL | 83 | CU YD | $220.00 | $118.00 | |
| 33 | 60100060 | CONC HDWL FOR P DRAIN | 1 | EACH | $400.00 | $1,600.00 | |
| 34 | 60108200 | PIPE UNDERDRAIN 6 SP | 150 | FOOT | $40.00 | $116.00 | |
| 35 | 61133100 | FLD TILE JUN VAULT 2D | 5 | EACH | $1,500.00 | $8,000.00 | |
| 36 | 66900200 | NON SPL WASTE DISPOSL | 1,407 | CU YD | $70.00 | $69.00 | |
| 37 | 66900530 | SOIL DISPOSAL ANALY | 2 | EACH | $1,650.00 | $2,200.00 | |
| 38 | 66901001 | REG SUB P-CONST PLAN | 1 | L SUM | $2,750.00 | $3,400.00 | |
| 39 | 66901003 | REG SUB F CON REPORT | 1 | L SUM | $2,750.00 | $1,000.00 | |
| 40 | 66901006 | REG SUB MON | 13 | CAL DA | $990.00 | $850.00 | |
| 41 | 67000400 | ENGR FIELD OFFICE A | 4 | CAL MO | $4,000.00 | $5,000.00 | |
| 42 | 67100100 | MOBILIZATION | 1 | L SUM | $40,000.00 | $89,000.00 | |
| 43 | 70102630 | TR CONT & PROT 701601 | 1 | L SUM | $11,000.00 | $10,000.00 |