(113)RS-3
- Let date
- Friday, June 17, 2022
- Contract
- 66E53 · job page
- District
- District 3
- County
- Livingston
- Highway
- Limits
- Project consists of milling 3.50" and resurfacing 3.75" on IL 116, 100' East of the intersection of IL 23 in Pontiac for a total of 1.71 miles. The scope of work includes some traffic signal upgrades, pavement patching, ADA ramp improvements, and minor drainage maintenance work.
- Classification
- Milling 3
Bidders 1
| # | Contractor | Total bid | vs estimate | vs low |
|---|---|---|---|---|
| EE | Engineer's estimate | — | ||
| 1 | Kankakee Valley Construction Company, Inc. Low bidder | $2,680,230 |
| Seq | Bid code | Description | Qty | Unit | Estimate | #1 Kankakee Valley… |
|---|---|---|---|---|---|---|
| 1 | X1400215 | REMOTE CONTR VIDEO SY | 6 | EACH | $28,715.00 | |
| 2 | X4401198 | HMA SURF REM VAR DP | 6,194 | SQ YD | $15.50 | |
| 3 | X5537800 | SS CLEANED 12 | 78 | FOOT | $60.00 | |
| 4 | X7230100 | INSTALL SIGN PANEL T1 | 128 | SQ FT | $25.00 | |
| 5 | X7240310 | REMOV SIGN PANL T1 SP | 128 | SQ FT | $15.00 | |
| 6 | X8950114 | MOD EX CONTR & CAB | 6 | EACH | $9,078.50 | |
| 7 | Z0012500 | CONC CURB REPAIR | 74 | FOOT | $145.00 | |
| 8 | Z0030850 | TEMP INFO SIGNING | 42 | SQ FT | $25.00 | |
| 9 | Z0033072 | VIDEO VEH DET SYS | 6 | EACH | $77,657.00 | |
| 10 | Z0034105 | MATL TRANSFER DEVICE | 6,324 | TON | $6.00 | |
| 11 | Z0048665 | RR PROT LIABILITY INS | 1 | L SUM | $5,000.00 | |
| 12 | Z0073509 | PERM TR SIGNAL TIMING | 6 | EACH | $1,941.00 | |
| 13 | 28100107 | STONE RIPRAP CL A4 | 20 | SQ YD | $100.00 | |
| 14 | 28200200 | FILTER FABRIC | 20 | SQ YD | $2.50 | |
| 15 | 40600290 | BIT MATLS TACK CT | 24,557 | POUND | $0.0100 | |
| 16 | 40600370 | LONG JOINT SEALANT | 18,434 | FOOT | $2.75 | |
| 17 | 40600400 | MIX CR JTS FLANGEWYS | 9.7 | TON | $540.00 | |
| 18 | 40600901 | HMA BC HM N70 | 16.1 | TON | $540.00 | |
| 19 | 40600990 | TEMPORARY RAMP | 798 | SQ YD | $30.00 | |
| 20 | 40602985 | HMA BC IL-9.5 N70 | 3,613 | TON | $110.00 | |
| 21 | 40604162 | P HMA SC IL-9.5 D N70 | 3,162 | TON | $141.00 | |
| 22 | 40800050 | INCIDENTAL HMA SURF | 927 | TON | $205.00 | |
| 23 | 42000060 | WELDED WIRE REINF | 394 | SQ YD | $0.0100 | |
| 24 | 42400100 | PC CONC SIDEWALK 4 | 197 | SQ FT | $30.00 | |
| 25 | 42400800 | DETECTABLE WARNINGS | 24 | SQ FT | $20.00 | |
| 26 | 44000163 | HMA SURF REM 3 1/2 | 32,248 | SQ YD | $4.25 | |
| 27 | 44000500 | COMB CURB GUTTER REM | 71 | FOOT | $32.00 | |
| 28 | 44000600 | SIDEWALK REM | 179 | SQ FT | $13.00 | |
| 29 | 44200994 | CL B PATCH T2 12 | 136 | SQ YD | $365.00 | |
| 30 | 44200998 | CL B PATCH T3 12 | 269 | SQ YD | $365.00 | |
| 31 | 44201299 | DOWEL BARS 1 1/2 | 1,264 | EACH | $8.00 | |
| 32 | 44213200 | SAW CUTS | 2,424 | FOOT | $0.0100 | |
| 33 | 56109210 | WATER VALVES ADJUST | 14 | EACH | $1,300.00 | |
| 34 | 60260100 | INLETS ADJUST | 2 | EACH | $400.00 | |
| 35 | 60300305 | FR & LIDS ADJUST | 30 | EACH | $2,000.00 | |
| 36 | 60605000 | COMB CC&G TB6.24 | 71 | FOOT | $110.00 | |
| 37 | 63500105 | DELINEATORS | 2 | EACH | $52.50 | |
| 38 | 66700205 | PERM SURV MKRS T1 | 1 | EACH | $650.00 | |
| 39 | 67000400 | ENGR FIELD OFFICE A | 4 | CAL MO | $4,900.00 | |
| 40 | 67100100 | MOBILIZATION | 1 | L SUM | $158,000.00 | |
| 41 | 70100450 | TRAF CONT-PROT 701201 | 1 | L SUM | $100.00 | |
| 42 | 70100460 | TRAF CONT-PROT 701306 | 1 | L SUM | $100.00 | |
| 43 | 70102620 | TR CONT & PROT 701501 | 1 | L SUM | $25,000.00 | |
| 44 | 70102622 | TR CONT & PROT 701502 | 1 | L SUM | $100.00 | |
| 45 | 70102635 | TR CONT & PROT 701701 | 1 | L SUM | $100.00 | |
| 46 | 70102640 | TR CONT & PROT 701801 | 1 | L SUM | $100.00 | |
| 47 | 70300100 | SHORT TERM PAVT MKING | 65,566 | FOOT | $0.0100 | |
| 48 | 70300150 | SHRT TRM PAVT MK REM | 2,185 | SQ FT | $0.0100 | |
| 49 | 70306100 | TEMP PVT MK LTR & SYM T3 TAPE | 1,305 | SQ FT | $3.65 | |
| 50 | 78000100 | THPL PVT MK LTR & SYM | 435 | SQ FT | $5.50 | |
| 51 | 78000200 | THPL PVT MK LINE 4 | 11,541 | FOOT | $0.9200 | |
| 52 | 78000400 | THPL PVT MK LINE 6 | 1,335 | FOOT | $1.37 | |
| 53 | 78000500 | THPL PVT MK LINE 8 | 1,670 | FOOT | $1.83 | |
| 54 | 78000600 | THPL PVT MK LINE 12 | 525 | FOOT | $2.75 | |
| 55 | 78004630 | PREF PL PM TD L 6 | 1,936 | FOOT | $6.03 | |
| 56 | 78004720 | PREF PL PM TD L 24 | 618 | FOOT | $21.40 | |
| 57 | 78011000 | GRV RCSD PM LTR & SYM | 435 | SQ FT | $6.00 | |
| 58 | 78011025 | GRV RCSD PVT MRKG 5 | 11,541 | FOOT | $0.5400 | |
| 59 | 78011035 | GRV RCSD PVT MRKG 7 | 3,274 | FOOT | $0.8100 | |
| 60 | 78011045 | GRV RCSD PVT MRKG 9 | 1,670 | FOOT | $1.10 | |
| 61 | 78011065 | GRV RCSD PVT MRKG 13 | 525 | FOOT | $2.75 | |
| 62 | 78011125 | GRV RCSD PVT MRKG 25 | 618 | FOOT | $6.50 | |
| 63 | 78100100 | RAISED REFL PAVT MKR | 301 | EACH | $35.65 | |
| 64 | 78300200 | RAISED REF PVT MK REM | 301 | EACH | $16.00 | |
| 65 | 78300202 | PAVMT MRKG REM WTR BL | 1,305 | SQ FT | $3.00 | |
| 66 | 85000200 | MAIN EX TR SIG INSTAL | 6 | EACH | $1,096.00 |