09-00230-00-BR
- Let date
- Friday, November 9, 2018
- Contract
- 87686 · job page
- District
- District 3
- County
- Bureau
- Highway
- Limits
- Remove deteriorated wingwalls of the three-barrel box culvert and a portion of the box culvert ends and replace with permanent steel sheet pile wingwalls along with replacing the concrete on the culvert ends, located on FAS 247 (CH 31) at Crow Creek, 6.0 miles east of Bradford
- Classification
- ·
- Project number
Bidders 7
| # | Contractor | Total bid | vs estimate | vs low |
|---|---|---|---|---|
| EE | Engineer's estimate | — | ||
| 1 | Miller Trucking & Excavating Company Low bidder | $1,092,510 | ||
| 2 | N. E. Finch Co. | $1,198,569 | +9.7% | |
| 3 | D. Construction, Inc. | $1,239,276 | +13.4% | |
| 4 | Stark Excavating, Inc. | $1,458,628 | +33.5% | |
| 5 | Brandt Construction Co. | $1,813,304 | +66.0% | |
| 6 | Kovilic Construction Company, Inc. | $1,818,923 | +66.5% | |
| 7 | Phoenix Corporation of the Quad Cities | $1,903,888 | +74.3% |
| Seq | Bid code | Description | Qty | Unit | Estimate | #1 Miller Trucking… | #2 N. E. Finch Co. | #3 D. Construction… | #4 Stark Excavatin… | #5 Brandt Construc… | #6 Kovilic Constru… | #7 Phoenix Corpora… |
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 1 | X0326910 | SLOPE STABILIZATION | 1 | L SUM | $25,000.00 | $99,000.00 | $80,000.00 | $111,000.00 | $160,000.00 | $200,000.00 | $314,000.00 | |
| 2 | X2020410 | EARTH EXCAVATION SPL | 502 | CU YD | $30.00 | $61.00 | $65.00 | $110.00 | $91.25 | $75.00 | $75.00 | |
| 3 | X2070302 | POROUS GRAN EMB SPEC | 478 | TON | $49.00 | $34.00 | $30.00 | $52.00 | $60.00 | $75.00 | $48.00 | |
| 4 | X2501100 | SEEDING CL 3 SPL | 0.2 | ACRE | $17,000.00 | $17,700.00 | $5,500.00 | $15,500.00 | $4,275.00 | $5,000.00 | $3,800.00 | |
| 5 | X2810208 | STONE RIPRAP CL A4 SP | 950 | TON | $57.00 | $57.00 | $65.00 | $95.00 | $81.50 | $100.00 | $85.75 | |
| 6 | X2810214 | STONE RIPRAP CL A7 SP | 1,035 | TON | $65.00 | $90.00 | $75.00 | $105.00 | $83.50 | $150.00 | $90.50 | |
| 7 | X7010216 | TRAF CONT & PROT SPL | 1 | L SUM | $4,470.00 | $4,830.00 | $10,000.00 | $4,200.00 | $4,725.00 | $30,000.00 | $5,500.00 | |
| 8 | Z0013798 | CONSTRUCTION LAYOUT | 1 | L SUM | $7,500.00 | $7,850.00 | $10,000.00 | $4,750.00 | $16,000.00 | $5,000.00 | $7,000.00 | |
| 9 | Z0023600 | FILL EXIST CULVERTS | 2 | EACH | $750.00 | $1,550.00 | $2,500.00 | $3,000.00 | $6,050.00 | $10,000.00 | $2,000.00 | |
| 10 | 20100500 | TREE REMOV ACRES | 0.65 | ACRE | $21,000.00 | $21,900.00 | $20,900.00 | $26,500.00 | $21,350.00 | $25,000.00 | $13,250.00 | |
| 11 | 25100630 | EROSION CONTR BLANKET | 946 | SQ YD | $1.30 | $1.50 | $2.20 | $1.20 | $1.75 | $3.00 | $1.55 | |
| 12 | 28000250 | TEMP EROS CONTR SEED | 20 | POUND | $20.00 | $6.00 | $11.00 | $6.50 | $11.25 | $50.00 | $10.00 | |
| 13 | 28000305 | TEMP DITCH CHECKS | 45 | FOOT | $30.00 | $20.00 | $22.00 | $12.00 | $15.25 | $25.00 | $15.00 | |
| 14 | 28000400 | PERIMETER EROS BAR | 931 | FOOT | $2.00 | $4.00 | $2.48 | $4.00 | $3.00 | $5.00 | $3.20 | |
| 15 | 28000500 | INLET & PIPE PROTECT | 1 | EACH | $200.00 | $213.00 | $250.00 | $120.00 | $230.00 | $250.00 | $175.00 | |
| 16 | 28100205 | STONE RIPRAP CL A3 | 920 | TON | $55.00 | $46.00 | $50.00 | $64.00 | $68.00 | $100.00 | $66.80 | |
| 17 | 40200800 | AGG SURF CSE B | 39 | TON | $57.00 | $20.00 | $30.00 | $45.00 | $40.00 | $75.00 | $36.00 | |
| 18 | 48101200 | AGGREGATE SHLDS B | 324 | TON | $35.00 | $20.00 | $30.00 | $36.00 | $46.00 | $75.00 | $40.00 | |
| 19 | 50100100 | REM EXIST STRUCT | 1 | EACH | $30,000.00 | $20,700.00 | $27,500.00 | $41,000.00 | $160,000.00 | $50,000.00 | $14,500.00 | |
| 20 | 50700305 | HARDWARE | 5,280 | POUND | $15.00 | $4.00 | $10.00 | $12.50 | $10.00 | $10.00 | $12.50 | |
| 21 | 50800205 | REINF BARS, EPOXY CTD | 59,000 | POUND | $1.60 | $1.65 | $2.00 | $1.51 | $1.75 | $2.00 | $1.70 | |
| 22 | 51500100 | NAME PLATES | 1 | EACH | $550.00 | $600.00 | $500.00 | $368.80 | $500.00 | $750.00 | $500.00 | |
| 23 | 52200015 | PERM SHT PILING | 8,928 | SQ FT | $35.00 | $50.50 | $46.00 | $55.00 | $60.00 | $50.00 | $71.00 | |
| 24 | 54003000 | CONC BOX CUL | 188.4 | CU YD | $1,150.00 | $807.00 | $1,000.00 | $825.00 | $1,550.00 | $1,500.00 | $835.00 | |
| 25 | 542D0220 | P CUL CL D 1 15 | 30 | FOOT | $60.00 | $40.00 | $50.00 | $46.00 | $58.00 | $150.00 | $54.00 | |
| 26 | 54262715 | METAL FL END SEC 15" | 2 | EACH | $330.00 | $333.00 | $500.00 | $175.00 | $390.00 | $500.00 | $475.00 | |
| 27 | 63000001 | SPBGR TY A 6FT POSTS | 325 | FOOT | $28.00 | $27.50 | $26.00 | $25.00 | $28.75 | $32.00 | $26.65 | |
| 28 | 63100167 | TR BAR TRM T1 SPL TAN | 4 | EACH | $3,200.00 | $3,220.00 | $2,847.00 | $2,850.00 | $3,675.00 | $4,500.00 | $2,700.00 | |
| 29 | 63200310 | GUARDRAIL REMOV | 858 | FOOT | $6.00 | $6.00 | $6.00 | $6.00 | $8.00 | $10.00 | $3.85 | |
| 30 | 67100100 | MOBILIZATION | 1 | L SUM | $45,000.00 | $44,300.00 | $45,000.00 | $86,000.00 | $105,000.00 | $100,000.00 | $249,059.45 | |
| 31 | 78200005 | GRDRAIL REF TYPE A | 8 | EACH | $10.00 | $10.00 | $16.50 | $9.00 | $15.00 | $100.00 | $10.00 |