Bid tab 66M52

Let Sep 23, 2022 · District 3 · Grundy Sign up free

‹ Sep 2022 results

(32-3)HL

Let date
Friday, September 23, 2022
Contract
66M52 · job page
District
District 3
County
Grundy
Highway
Limits
This work is located at the Interchange of I-80 and IL 47 in Grundy County. This work consists of removal and replacement of highway light poles, luminaries and breakaway couplings.
Classification
Removal and replacement of highway light poles, luminaries and breakaway couplings

Bidders 1

#ContractorTotal bidvs estimatevs low
EEEngineer's estimate—
1 Electric Conduit Construction Low bidder $184,785

Bid tab: unit prices 10 items

ExcelCSV
SeqBid codeDescriptionQtyUnitEstimate #1 Electric Condui…
1X0323927 MAINTAIN LIGHTING SYS1EACH $1,000.00
2X0324599 ROD AND CLEAN EX COND3,270FOOT $0.4600
3X8210402 LUMINAIRE MT BRKT SPL4EACH $498.51
467100100 MOBILIZATION1L SUM $5,350.00
570107025 CHANGEABLE MESSAGE SN28CAL DA $107.50
681702415 EC C XLP USE 3-1C 63,270FOOT $7.83
782110008 LUM LED RDWY H4EACH $1,233.52
883060840 LT P GS 50MH TEN MT4EACH $5,431.55
983800650 BKWY DEV COU SS SCRN288EACH $398.01
1089502300 REM ELCBL FR CON3,270FOOT $1.54