| Let date | Contract / PPS | County / Division | Highway | Description | Estimate | Status | Low bidder | |
|---|---|---|---|---|---|---|---|---|
| Jan 19, 2018 | 61E26 | DuPageDistrict 1 | Resurfacing Fullerton Avenue from Bloomingdale Road to Glen Elleyn Road in the Village of Glendale Heights. | — | Executed | J. A. Johnson Paving Company $1,453,953 · | ||
| Jan 19, 2018 | 61E31 | DuPageDistrict 1 | Resurfacing Poplar Avenue from Park Avenue to Vallette Street in the City of Elmhurst. | — | Executed | J. A. Johnson Paving Company $596,413 · | ||
| Jan 19, 2018 | 62D54 | CookDuPageWillDistrict 1 | Guardrail and traffic barrier terminal removal and replacement on various arterial and expressway routes. | — | Executed | Kujo, Inc. $537,608 · | ||
| Jan 19, 2018 | 62F79 | CookDuPageDistrict 1 | Cleaning and painting existing steel structures at various locations in the villages of Elmhurst, Wood Dale, Oakbrook, Westchester and LaGrange Park. | — | Executed | ERA-Valdivia Contractors, Inc. $679,108 · | ||
| Mar 9, 2018 | 61E35 | DuPageDistrict 1 | Resurfacing and reconstruction on Park Boulevard from IL Route 38 to Crescent Boulevard, and on Main Street from IL Route 38 to Fairview Avenue in the Village of Glen Ellyn. | — | Executed | R. W. Dunteman Company $2,944,990 · | ||
| Mar 9, 2018 | 61E37 | DuPageDistrict 1 | resurfacing improvments on West Street from IL 38 (Roosevelt Road) to Wesley Street in the City of Wheaton. | — | Executed | Geneva Construction Company $375,759 · | ||
| Mar 9, 2018 | 61E43 | DuPageDistrict 1 | Construction of a multi-use path along Great Western Trail from Sassafras Drive to Prince Crossing Road. | — | Executed | Chicagoland Paving Contractors, Inc. $224,900 · | ||
| Apr 27, 2018 | 61D92 | DuPageDistrict 1 | Resurfacing on Central Avenue from Gary Avenue to Roselle Road in the Village of Roselle. | — | Executed | Arrow Road Construction Co. $888,255 · | ||
| Apr 27, 2018 | 61E40 | DuPageDistrict 1 | Construction of a multi-use trail along Taylor Avenue from Walnut Street to Willis Street, and the Construction of a tunnel under the Union Pacific Railroad, in the Village of Glen Ellyn. | — | Executed | D. Construction, Inc. $2,745,521 · | ||
| Apr 27, 2018 | 61E42 | DuPageDistrict 1 | Resurfacing on Army Trail Bouldevard from Mill Road to Rohlwing Road in the Village of Addison. | — | Executed | R. W. Dunteman Company $3,624,672 · | ||
| Apr 27, 2018 | 61E55 | DuPageDistrict 1 | Resurfacing, sidewalk construction and roadway reconstruction on Railroad Avenue from York Avenue to Addison Street in the Village of Bensenville. | — | Executed | R. W. Dunteman Company $1,290,683 · | ||
| Apr 27, 2018 | 61E58 | DuPageDistrict 1 | Resurfacing Internationale Parkway from Beaudin Boulevard to Woodward Avenue in the Village of Woodridge. | — | Executed | D. Construction, Inc. $807,962 · | ||
| Apr 27, 2018 | 61E61 | DuPageDistrict 1 | Resurfacing Main Street from Franklin Street to Ogden Avenue in the Village of Downers Grove. | — | Executed | J. A. Johnson Paving Company $591,945 · | ||
| Apr 27, 2018 | 61E62 | DuPageDistrict 1 | Resurfacing and ADA improvements on York Street from North Avenue to First Street in the City of Elmhurst. | — | Executed | K-Five Construction Corporation $666,667 · | ||
| Apr 27, 2018 | 61E65 | DuPageDistrict 1 | Resurfacing, curb, gutter and sidewalks on North Main Street from Seminary Avenue to Cole Avenue in the City of Wheaton. | — | Executed | R. W. Dunteman Company $892,096 · | ||
| Apr 27, 2018 | 62C24 | DuPageDistrict 1 | Remove and replace bridge structure SN 022-0103 carrying I-290 over Salt Creek. | — | Executed | Dunnet Bay Construction Company $14,397,932 · | ||
| Apr 27, 2018 | 62C67 | DuPageDistrict 1 | Resurfacing and pedestrian ramp improvement of IL 38 in the villages of Lombard and Villa Park. | — | Executed | R. W. Dunteman Company $2,092,603 · | ||
| Apr 27, 2018 | 62D58 | DuPageDistrict 1 | Pedestrian ramps at various location. | — | Executed | Sumit Construction Co., Inc. $527,044 · | ||
| Apr 27, 2018 | 62F28 | DuPageDistrict 1 | Resurfacing and pedestrian ramp improvements on IL 38 in the villages of Wheaton and Glen Ellyn. | — | Executed | R. W. Dunteman Company $3,400,758 · | ||
| Apr 27, 2018 | 62F53 | DuPageDistrict 1 | Resurfacing on IL 59 in the City of Warrenville. | — | Executed | Geneva Construction Company $1,410,239 · | ||
| Apr 27, 2018 | 62F56 | CookDuPageDistrict 1 | Resurfacing and pedestrian ramps on US 34 in the Village of Hinsdale. | — | Executed | R. W. Dunteman Company $1,772,682 · | ||
| Jun 15, 2018 | 60M74 | DuPageDistrict 1 | Repair bridge SN 022-0147 carrying IL 19 over Salt Creek, 0.3 mile west of West Dale Road in the village of Wood Dale. | — | Executed | D. Construction, Inc. $593,767 · | ||
| Jun 15, 2018 | 61E12 | DuPageDistrict 1 | Sidewalk work on Covington Drive from Schick Road to Brighton Drive, and on Brighton Drive from Covington Drive to Army Trial Drive in the Village of Bloomingdale. | — | Executed | Burrink Commercial Services, Inc. $258,642 · | ||
| Jun 15, 2018 | 61E80 | DuPageDistrict 1 | Resurfacing, traffic signals, and sidewalk installation and/or replacement on Benedictine Avenue from Abbeywood Drive to Maple Avenue in the village of Lisle. | — | Executed | K-Five Construction Corporation $717,469 · | ||
| Jun 15, 2018 | 62D16 | DuPageDistrict 1 | Resurfacing of IL 38 through the cities of Oakbrook Terrace and ELmhurst, and the village of Oak Brook. | — | Executed | K-Five Construction Corporation $4,186,352 · | ||
| Aug 3, 2018 | 61E85 | DuPageDistrict 1 | Rehabilitate the structure carrying 71st street over I-355 in Woodridge. | — | Executed | Areatha Construction Co., Inc. $289,477 · | ||
| Aug 3, 2018 | 61E92 | DuPageDistrict 1 | Resurfacing Maple Avenue from Main Street to Fairview Avenue in the Village of Downers Grove. | — | Executed | A Lamp Concrete Contractors, Inc. $415,550 · | ||
| Aug 3, 2018 | 61E93 | DuPageDistrict 1 | Resurfacing Westmore-Meyers Road from IL 38 to St. Charles Road in Lombard. | — | Executed | Arrow Road Construction Co. $1,575,970 · | ||
| Sep 21, 2018 | 61C21 | DuPageDistrict 1 | Construction of a multi-use path from Butterfield Road to South of Butterfield Road in the City of Elmhurst. | — | Executed | Lorig Construction Company $650,954 · | ||
| Sep 21, 2018 | 61E88 | DuPageDistrict 1 | Construction of a shared use path adjacent to Montgomery Road from Waubonsie Creek Trail to Middlebury Drive in the City of Aurora. | — | Executed | D. Construction, Inc. $588,452 · | ||
| Sep 21, 2018 | 61E98 | DuPageDistrict 1 | Roadway resurfacing and sidewalk installation on Greenbrook Boulevard from County Farm Road to Lake Street. | — | Executed | J. A. Johnson Paving Company $885,885 · | ||
| Nov 9, 2018 | 46472 | DuPageWillDistrict 1 | Replacing damaged and deteriorated overhead sign structures, componenets, and supports, described in the schedule of locations. | — | Executed | Aldridge Electric, Inc. $3,199,710 · | ||
| Nov 9, 2018 | 61E06 | DuPageDistrict 1 | Intersection improvement with signal timing progression and resurfacing on FAU Route 1504 (55th Street) from Dunham Road to Clerendon Hills Road. | — | Executed | R. W. Dunteman Company $8,525,282 · | ||
| Nov 9, 2018 | 61F05 | DuPageDistrict 1 | Install conduit, handholes and fiber optic interconnect cable to connect existing traffic signal controllers to the existing DuPage County Central System Network, located at various locations in DuPage County. | — | Executed | Thorne Electric, Inc. $3,355,558 · | ||
| Nov 9, 2018 | 62F57 | DuPageDistrict 1 | 4.5 miles of resurfacing (3P) and pedestrian ramps on IL 64 from Gary Avenue to IL 53. | — | Executed | R. W. Dunteman Company $6,955,644 · | ||
| Jan 18, 2019 | 46482 | DuPageDistrict 1 | Removing reflectors, placing new reflectors, removing damaged raised reflective pavement marker castings, and placing new raised pavement markeer castings. | — | Executed | Superior Road Striping, Inc. $1,114,319 · | ||
| Jan 18, 2019 | 61F20 | DuPageDistrict 1 | Resurfacing west Avenue from First Street to St. Charles Road in Elmhurst. | — | Executed | K-Five Construction Corporation $310,996 · | ||
| Jan 18, 2019 | 61F30 | DuPageDistrict 1 | Resurfacing on Lies Road from Gary Avenue to Schmale Road in Carol Stream. | — | Executed | Plote Construction, Inc. $1,031,758 · | ||
| Jan 18, 2019 | 61F38 | DuPageDistrict 1 | Resufacing on York Road from Grand Avenue to Green Street in Bensenville. | — | Executed | K-Five Construction Corporation $1,878,875 · | ||
| Jan 18, 2019 | 62G66 | DuPageWillDistrict 1 | Installation of seven truss mounted LED dynamic message signs, CCTBV, fiber optic networks and roadside bluetooth detectors at various locations. | — | Executed | John Burns Construction Company $5,592,292 · | ||
| Jan 18, 2019 | 62G88 | DuPageDistrict 1 | Cleaning and painting designated steel surfaces of I-290 bridge (SN 022-0107) at Metra (north of IL 19 - Irving Park Road) in the Village of Itasca. | — | Executed | Eagle Painting & Maintenance Company, Inc. $805,200 · | ||
| Jan 18, 2019 | 62G93 | DuPageDistrict 1 | Bridge deck overlay and approach pavement with latex concrete. Adjacent HMA pavement will be resurfaced to provide a smooth transition. | — | Executed | Martam Construction Incorporated $164,813 · | ||
| Jan 18, 2019 | 62G95 | DuPageDistrict 1 | Drainage improvement project in the median of IL 83 from 67th Street to Plainfield Road. | — | Executed | Scanlon Excavating & Concrete, Inc. $88,287 · | ||
| Mar 8, 2019 | 60M75 | DuPageDistrict 1 | Bridge deck overlay and bridge joint repair improvement of Emroy Ave over I-290. | — | Executed | Martam Construction Incorporated $396,588 · | ||
| Mar 8, 2019 | 60P68 | DuPageDistrict 1 | Resurfacing on IL-56 from Naperville Rd. to IL 53; includes retrofitting sidewalks to comply with ADA and Signal modernaization at the intersection with Park Ave. | — | Executed | K-Five Construction Corporation $3,038,712 · | ||
| Mar 8, 2019 | 61F62 | DuPageDistrict 1 | Roadway reconstruction on Washington Street from Town Road to Arbor Avenue in the city of West Chicago. | — | Executed | Schroeder Asphalt Services, Inc. $1,120,972 · | ||
| Mar 8, 2019 | 62F54 | DuPageDistrict 1 | 2.5 miles of resurfacing and ADA sidewalk improvements on IL 64 (North Avenue) from Villa Avenue to the Cook County line in the Village of Villa Park and the City of Elmhurst. | — | Executed | R. W. Dunteman Company $2,773,288 · | ||
| Mar 8, 2019 | 62G62 | DuPageDistrict 1 | 6 miles of resurfacing on US 34 (Ogden Avenue) from Ivanhoe Ave to east of IL 83 (Kingery Highway in the Villages of Lisle, Downers Grove, Westmont and Clarendon Hills. | — | Executed | R. W. Dunteman Company $7,098,580 · | ||
| Mar 8, 2019 | 62G64 | DuPageDistrict 1 | 2.4 miles of resurfacing and pedestrian ramp improvements on US 20 (W. Lake Street) from west of Summerfield Drive to west of I-355 (Veterans Memorial Tollway) in the Villages of Addison and Bloomingdale. | — | Executed | K-Five Construction Corporation $3,428,345 · | ||
| Mar 8, 2019 | 62H01 | DuPageDistrict 1 | Bridge deck overlay, joint repair, structural repair of concrete, drainage structure adjustment and concrete repair of beam ends for the structures carrying IL 83 of US 34 and the BNSF Railroad in the Villages of Hinsdale, Clarendon Hills and Westmont. | — | Executed | Herlihy Mid-Continent Company $2,269,678 · | ||
| Mar 8, 2019 | 62H04 | DuPageDistrict 1 | Bridge deck scarification, latex overlay, joint repairs, structural concrete and steel repairs on IL 38 (Roosevelt Road) over Salt Creek, also Bridge deck scarification, latex overlay, and joint repairs on IL 38 Frontage Road over Salt Creek. | — | Executed | Martam Construction Incorporated $1,330,256 · | ||
| Mar 8, 2019 | 62H24 | DuPageDistrict 1 | 2.4 miles of resurfacing and pedestrian ramp work on IL 56 (Butterfield Road) from the Kane County line to the CNRR overpass in Aurora. | — | Executed | Geneva Construction Company $1,241,694 · | ||
| Mar 8, 2019 | 62H30 | DuPageDistrict 1 | Routing, cleaning, and sealing longitudinal cracks in the existing HMA pavement; longitudinal joints between the existing HMA pavement and curb and gutter; and restriping with hot spray thermoplastic pavement marking. | — | Executed | Freehill Asphalt, Inc. $285,968 · | ||
| Apr 26, 2019 | 60V17 | DuPageDistrict 1 | 2.42 miles of resurfacing on IL 56 from I-355 to 22nd Street in Lombard, Oak Brook and Downers Grove. | — | Executed | K-Five Construction Corporation $4,278,640 · | ||
| Apr 26, 2019 | 61E96 | DuPageDistrict 1 | Construction of an HMA pedestrian path, sidewalks, storm sewer and the extension of Church Road from Grove Avenue to IL 19 in Bensenville. | — | Rejected | Martam Construction Incorporated $697,572 · | ||
| Apr 26, 2019 | 61F26 | DuPageDistrict 1 | Resurfacing Spring Road from Vallette Street to St. Charles Road in the City of Elmhurst. | — | Executed | A Lamp Concrete Contractors, Inc. $569,103 · | ||
| Apr 26, 2019 | 61F29 | DuPageDistrict 1 | Sidewalk construction on County Line Road from 60th Street to Longwood Drive in the Village of Burr Ridge. | — | Executed | Davis Concrete Construction Co. $667,394 · | ||
| Apr 26, 2019 | 61F50 | DuPageDistrict 1 | Resurfacing Blanchard Street from south of Tara Court to President Street and President Street from Blanchard Street to IL 38 in the City of Wheaton. | — | Executed | K-Five Construction Corporation $922,751 · | ||
| Apr 26, 2019 | 61F51 | DuPageDistrict 1 | Roadway reconstruction on Arlington Heights Road from Pierce Road to Thorndale Road in the village of Itasca. | — | Executed | A Lamp Concrete Contractors, Inc. $808,321 · | ||
| Apr 26, 2019 | 61F52 | DuPageDistrict 1 | Channelization improvements on Diehl Road from Davis Parkway to Winfield Road in the City of Warrenville. | — | Executed | Alliance Contractors, Inc. $383,892 · | ||
| Apr 26, 2019 | 61F55 | DuPageDistrict 1 | Resurfacing, curb and gutter, sidewalks, Street lighting and pavement markings on Forest Avenue from Joliet Street to IL 59 in West Chicago. | — | Executed | J. A. Johnson Paving Company $581,927 · | ||
| Apr 26, 2019 | 61F56 | DuPageDistrict 1 | Resurfacing Harrison Avenue from Gary Avenue to College Avenue in the City of Wheaton. | — | Executed | J. A. Johnson Paving Company $984,239 · | ||
| Apr 26, 2019 | 61F66 | DuPageDistrict 1 | Intersection and traffic signal improvements at 75th Street and Naper Boulevard in the City of Naperville. | — | Executed | Home Towne Electric, Inc. $859,094 · | ||
| Apr 26, 2019 | 61F70 | DuPageDistrict 1 | Resurface Collins Avenue from Swift Road to Rohwling Road, and resurface Fullerton Avenue from Rohwling Road to Addison Road in the village of Addison. | — | Executed | R. W. Dunteman Company $3,325,608 · | ||
| Apr 26, 2019 | 61F71 | DuPageDistrict 1 | Pavement reconstruction, resurfacing, add curb islands, storm sewer, water main adjustments, sidewalks and pavement markings at various locations in Bensenville. | — | Executed | R. W. Dunteman Company $2,799,980 · | ||
| Apr 26, 2019 | 61F72 | DuPageDistrict 1 | Resurfacing Janes Avenue from 75th Street to Center Drive in the Village of Woodridge. | — | Executed | K-Five Construction Corporation $529,749 · | ||
| Apr 26, 2019 | 61F73 | DuPageDistrict 1 | Rehabilitate the bridge carrying St. Charles Road over Salt Creek, 0.2 mile west of IL 83 in Villa Park. | — | Executed | Rausch Infrastructure, LLC $1,988,969 · | ||
| Apr 26, 2019 | 62G23 | DuPageDistrict 1 | 2.29 miles of resurfacing consisting of HMA surface removal, pavement patching, HMA resurfacing, ADA sidewalk repair, and thermoplastic pavement marking on IL 53 from I-88 to 59th St in Lisle. | — | Executed | K-Five Construction Corporation $2,942,254 · | ||
| Apr 26, 2019 | 62G51 | DuPageDistrict 1 | Bridge deck and approach overlay and repairs, reconstrution of deck joint, and repair of substructure for 022-0034 carrying US 34 over St. Josepth Creek in Lisle. | — | Executed | ERA-Valdivia Contractors, Inc. $486,455 · | ||
| Apr 26, 2019 | 62H80 | DuPageDistrict 1 | Substructure bridge repair on the structure carrying Highland Avenue and IL 83 (Kingery Highway) over IL 56 (Butterfield Road) in the Villages of Lombard/Downers grove and City of Oak Brook Terrace. (SN 022-0154, 0117, 0118) | — | Executed | Areatha Construction Co., Inc. $478,908 · | ||
| Jun 14, 2019 | 46505 | DuPageMcHenryDistrict 1 | Apply water borne, lead free, white and yellow paint pavement marking lines, 4, 6, and 8 inches in width in Dupage and McHenry counties. | — | Executed | STF, LLC d/b/a Traffic Control Company $422,500 · | ||
| Jun 14, 2019 | 61F83 | DuPageDistrict 1 | Bridge deck scarification, bridge deck latex concrete overlay and bridge deck grooving on the structure carryi Work consists of bridge deck scarification, bridge deck latex concrete overlay and bridge deck grooving on the structure carrying 83rd Street over I-355 between Wharf Dr. and Woodward Avenue in the village of Woodridge. | — | Executed | D. Construction, Inc. $288,756 · | ||
| Jun 14, 2019 | 62F19 | DuPageDistrict 1 | Channelization and traffic sigal modernization at IL 59 and Army Trail Road. | — | Executed | Benchmark Construction Co., Inc. $3,488,015 · | ||
| Jun 14, 2019 | 62H09 | CookDuPageKaneDistrict 1 | Guardrail end section replacement at various locations in Cook, DuPage and Kane Counties. | — | Executed | Midwest Fence Corporation $433,668 · | ||
| Jun 14, 2019 | 62H37 | DuPageDistrict 1 | Wing Wall and culvert repairs at the structure carrying IL 59 in Warrenville. Includes grading and shaping of the ditch on the south side of US 20, E of Garden Avenue in Roselle. | — | Executed | Lakes & Rivers Contracting, Inc. $290,571 · | ||
| Jun 14, 2019 | 62H94 | CookDuPageDistrict 1 | Expressway sweeping on I-55 (Stevenson Expressway) from I-355 to I-90/94 and on I-94, US 41 from US 14 (Dempster Street) to IL 68 (Dundee Road). | — | Executed | Elgin Sweeping Services, Inc. $2,196,168 · | ||
| Jun 14, 2019 | 62J01 | DuPageDistrict 1 | Demolition of a single-family residence at 22W432 IL 53 in Glen Ellyn. | — | Executed | Scanlon Excavating & Concrete, Inc. $83,910 · | ||
| Jun 14, 2019 | 62J09 | CookDuPageDistrict 1 | Intermittent resurfacing project on various expressway routes. | — | Executed | R. W. Dunteman Company $1,653,207 · | ||
| Jun 14, 2019 | 62J13 | DuPageKaneDistrict 1 | Intermittent resurfacing on various state maintained arterial routes in Dupage and Kane counties. | — | Executed | J. A. Johnson Paving Company $762,500 · | ||
| Jun 14, 2019 | 62J15 | CookDuPageDistrict 1 | INTRMITTENT RESURFACING PROJECT ON VARIOUS ROUTES IN VARIOUS CITIES. | — | Executed | R. W. Dunteman Company $2,872,070 · | ||
| Jul 12, 2019 | 62G59 | DuPageDistrict 1 | 1.6 miles of resurfacing and ADA sidewalk repair on IL 53 from St. Charles Road to Sidney Avenue in the Villages of Addison and Lombard. | — | Executed | R. W. Dunteman Company $1,651,036 · | ||
| Sep 20, 2019 | 61E69 | DuPageDistrict 1 | Landscaping and sign installation along the Elgin O'Hare Western Access Corridor at Lake Street (US 20), Roselle Road, Plum Grove Road and Rohlwing Road. Project is located in the villages of Roselle, Itasca and Hanover Park. | — | Rejected | Alliance Contractors, Inc. $1,264,017 · | ||
| Sep 20, 2019 | 61F85 | DuPageDistrict 1 | Streetscape to include sidewalk replacement, curb and gutter replacement, lighting improvements, landscaping, pavement imprinting and resurfacing. Project is located on Prospect Avenue from Ann Street to Burlington Avenue in the Village of Clarendon Hills. | — | Executed | A Lamp Concrete Contractors, Inc. $1,434,658 · | ||
| Jan 17, 2020 | 61F74 | DuPageDistrict 1 | Construction of a shared use path adjacent to Gary Avenue from Great Western Trail (St. charles Road) to Army Trail Road in Carol Stream. | — | Executed | R. W. Dunteman Company $2,023,958 · | ||
| Jan 17, 2020 | 61G14 | DuPageDistrict 1 | Sidewalk construction and the construction of multi-use paths at various locations in the Village of Itasca. | — | Executed | A Lamp Concrete Contractors, Inc. $834,549 · | ||
| Jan 17, 2020 | 62J46 | DuPageDistrict 1 | Designed overlay and pedestrian ramp project begins at the intersection of West Westgate Rd and I-55 South Frontage Rd and proceeds East for 2.44 miles to the West leg of the intersection of I-55 South Frontage Rd and Cass Ave. | — | Executed | P. T. Ferro Construction Co. $1,082,324 · | ||
| Jan 17, 2020 | 62K36 | CookDuPageDistrict 1 | Litter/Debris Removal from the edge of the pavement to the Pedestrian Barrier adjacent to the State-Owned Expr The improvement consists of Litter/Debris Removal from the edge of the pavement to the Pedestrian Barrier adjacent to the State-Owned Expressway. 200 miles in length. | — | Rejected | Sewer Rat Contractors, LLC $288,000 · | ||
| Jan 17, 2020 | 62K37 | CookDuPageDistrict 1 | Litter/Debris Removal from the edge of the pavement to the Pedestrian Barrier on I-290 Expressway from IL 83 ( The improvement consists of Litter/Debris Removal from the edge of the pavement to the Pedestrian Barrier on I-290 Expressway from IL 83 (Kingery Hwy) to Austin Blvd. 135 miles in length. | — | Rejected | Sewer Rat Contractors, LLC $192,000 · | ||
| Jan 17, 2020 | 62K47 | CookDuPageDistrict 1 | Litter/debris removal from the edge of the pavement to the pedestrian barrier on I-55 - Stevenson Expressway from IL 43 (Harlem Ave) to I-355._150 miles in length. | — | Rejected | Viridian Enterprises, Inc. $119,250 · | ||
| Mar 6, 2020 | 61F34 | DuPageDistrict 1 | Construction of a shared used path from Army Trail Road to Conerstone Lakes Park. Project is located in the Village of Wayne. | — | Executed | A Lamp Concrete Contractors, Inc. $874,861 · | ||
| Mar 6, 2020 | 61G16 | DuPageDistrict 1 | Reconstruct the intersection of Harger Road at North York Road, and the construction of an underpass to carry the Salt Creek Trail under Harger Road in Oak Brook. | — | Executed | Martam Construction Incorporated $7,365,297 · | ||
| Mar 6, 2020 | 61G18 | DuPageDistrict 1 | Pavement reconstruction and traffic signal modernization on 75th Street from Lyman Avenue to Exner Road/Williams Street, located in the Village of Downers Grove and the City of Darien | — | Executed | R. W. Dunteman Company $4,921,983 · | ||
| Mar 6, 2020 | 61G23 | DuPageDistrict 1 | Resurfacing Manchester Road from County Farm Road to Gables Boulevard in the City of Wheaton. | — | Executed | Plote Construction, Inc. $665,109 · | ||
| Mar 6, 2020 | 61G25 | DuPageDistrict 1 | Resurfacing President Street from Harrison Avenue to Geneva Road in the City of Wheaton. | — | Executed | Plote Construction, Inc. $677,196 · | ||
| Mar 6, 2020 | 61G27 | DuPageDistrict 1 | Resurfacing Woodward Avenue from 75th Street to the north village limits of Woodridge. | — | Executed | K-Five Construction Corporation $981,870 · | ||
| Mar 6, 2020 | 61G29 | DuPageDistrict 1 | Resurfacing Main Street from St Charles Road to Wilson Avenue in Lombard. | — | Executed | R. W. Dunteman Company $1,307,899 · | ||
| Mar 6, 2020 | 61G37 | DuPageDistrict 1 | Resurfacing 83rd Street from IL 53 to Janes Avenue in the Village of Woodridge. | — | Executed | K-Five Construction Corporation $896,777 · | ||
| Mar 6, 2020 | 62H85 | CookDuPageWillDistrict 1 | This is a safety (HSIP) improvement including guardrail end section replacement and new guardrail installation on various state maintained arterial routes. | — | Executed | Copenhaver Construction, Inc. $584,674 · | ||
| Mar 6, 2020 | 62J38 | DuPageDistrict 1 | Bridge repair, bridge joint repair, and bridge deck overlay on the structure carrying Chicago Ave over IL 83. | — | Executed | P. T. Ferro Construction Co. $172,877 · | ||
| Apr 24, 2020 | 61G06 | DuPageDistrict 1 | Construction of a PCC multi-use path, curb and gutter, culvert extension, storm sewer and pavement markings. Located on the east side of IL 83 from Bryn Mawr Avenue to Foster Avenue in Bensenville. | — | Executed | Alliance Contractors, Inc. $1,434,446 · |
1–100 of 283Next ›
Lettings: IDOT Transportation Bulletin (Notice of Letting and Contract Detail pages). Planned projects: IDOT Multi-Year Highway Improvement Program (roadway, structure and spot layers on the IDOT open data hub), listed by program year, not let date. "Added" is the first date Bid Potato saw the job. Always confirm against the official proposal before bidding.