2024-1000-RS,SW
- Let date
- Friday, June 13, 2025
- Contract
- 62X34 · job page
- District
- District 1
- County
- Will
- Highway
- Limits
- (2.88-Mile) Designed overlay and pedestrian ramp (ADA) project consists of asphalt surface removal, pavement patching, combination concrete curb and gutter removal and replacement, concrete sidewalk removal replacement, resurfacing with asphalt binder course and asphalt surface course, pavement markings. The improvement is in the Cities of Braidwood and Wilmington in Will County.
- Classification
- Asphalt surface removal, pavement patching, combination concrete curb and gutter removal and replacement, conc ·
- Project number
Bidders 5
| # | Contractor | Total bid | vs estimate | vs low |
|---|---|---|---|---|
| EE | Engineer's estimate | — | ||
| 1 | Iroquois Paving Corporation Low bidder | $1,353,712 | ||
| 2 | Gallagher Asphalt Corporation | $1,494,778 | +10.4% | |
| 3 | D. Construction, Inc. | $1,499,697 | +10.8% | |
| 4 | Austin Tyler Construction, Inc. | $1,636,840 | +20.9% | |
| 5 | P. T. Ferro Construction Co. | $1,648,804 | +21.8% |
| Seq | Bid code | Description | Qty | Unit | Estimate | #1 Iroquois Paving… | #2 Gallagher Aspha… | #3 D. Construction… | #4 Austin Tyler Co… | #5 P. T. Ferro Con… |
|---|---|---|---|---|---|---|---|---|---|---|
| 1 | K0026700 | TREE CARE | 20 | EACH | $152.05 | $150.00 | $165.00 | $150.00 | $800.00 | |
| 2 | K0029624 | WEED CONTROL TEASEL | 1 | GALLON | $5,050.00 | $5,000.00 | $2,750.00 | $2,500.00 | $10,000.00 | |
| 3 | X0320050 | CONSTRUCTN LAYOUT SPL | 1 | L SUM | $3,550.00 | $5,000.00 | $5,000.00 | $2,800.00 | $10,000.00 | |
| 4 | X0325222 | WEED CONT BASAL TRTMT | 30 | GALLON | $610.00 | $600.00 | $1,485.00 | $1,350.00 | $325.00 | |
| 5 | X1400367 | PED SIGNAL POST 10 FT | 3 | EACH | $1,910.00 | $2,000.00 | $2,310.00 | $2,100.00 | $2,100.00 | |
| 6 | X2020110 | GRADING & SHAP SHLDRS | 222 | UNIT | $11.00 | $94.00 | $11.00 | $89.00 | $0.0100 | |
| 7 | X4400501 | CC&G RMVL REPL < = 10 | 15 | FOOT | $90.00 | $100.00 | $82.50 | $88.00 | $200.00 | |
| 8 | X4400503 | CC&G RMVL REPL > 10FT | 335 | FOOT | $80.00 | $60.00 | $74.80 | $57.00 | $65.00 | |
| 9 | X5537800 | SS CLEANED 12 | 30 | FOOT | $15.25 | $47.00 | $30.00 | $15.00 | $15.00 | |
| 10 | X6700407 | ENGRS FLD OFC TY A D1 | 12 | CAL MO | $0.0100 | $500.00 | $4,500.00 | $3,000.00 | $1.00 | |
| 11 | X7200061 | TEMP INFO SIGNING | 105 | SQ FT | $32.00 | $16.20 | $25.00 | $30.00 | $20.00 | |
| 12 | X8140238 | REBLD EX DBL HANDHOLE | 2 | EACH | $2,400.00 | $2,500.00 | $4,950.00 | $4,500.00 | $4,500.00 | |
| 13 | X8760200 | ACCESSIBLE PED SIGNAL | 12 | EACH | $1,850.00 | $1,900.00 | $2,090.00 | $1,900.00 | $1,900.00 | |
| 14 | X8780012 | CONC FDN TY A 12D | 12 | FOOT | $500.00 | $530.00 | $440.00 | $400.00 | $400.00 | |
| 15 | Z0018500 | DRAINAGE STR CLEANED | 2 | EACH | $1,525.00 | $1,080.00 | $600.00 | $1,000.00 | $1,000.00 | |
| 16 | Z0033044 | RE-OPTIMIZE TR SIG SYS 1 | 1 | EACH | $1,295.00 | $1,375.00 | $1,650.00 | $1,500.00 | $1,500.00 | |
| 17 | Z0048665 | RR PROT LIABILITY INS | 1 | L SUM | $5,500.00 | $5,000.00 | $4,000.00 | $6,000.00 | $7,500.00 | |
| 18 | 20101300 | TREE PRUN 1-10 | 5 | EACH | $105.00 | $240.00 | $110.00 | $220.00 | $100.00 | |
| 19 | 20101350 | TREE PRUN OVER 10 | 10 | EACH | $155.00 | $240.00 | $165.00 | $330.00 | $150.00 | |
| 20 | 20200100 | EARTH EXCAVATION | 25 | CU YD | $80.00 | $100.00 | $66.00 | $88.00 | $100.00 | |
| 21 | 21101615 | TOPSOIL F & P 4 | 124 | SQ YD | $15.50 | $16.00 | $36.30 | $33.00 | $20.00 | |
| 22 | 25000400 | NITROGEN FERT NUTR | 1.5 | POUND | $2.50 | $105.00 | $5.50 | $5.00 | $150.00 | |
| 23 | 25000500 | PHOSPHORUS FERT NUTR | 1.5 | POUND | $2.50 | $105.00 | $5.50 | $5.00 | $150.00 | |
| 24 | 25000600 | POTASSIUM FERT NUTR | 1.5 | POUND | $2.50 | $105.00 | $5.50 | $5.00 | $150.00 | |
| 25 | 25003210 | INTERSEED CL 2A | 1 | ACRE | $1,825.00 | $1,900.00 | $4,356.00 | $3,960.00 | $3,500.00 | |
| 26 | 25200110 | SODDING SALT TOLERANT | 124 | SQ YD | $32.00 | $16.00 | $69.30 | $63.00 | $50.00 | |
| 27 | 25200200 | SUPPLE WATERING | 1.2 | UNIT | $1,025.00 | $1,000.00 | $5.50 | $5.00 | $250.00 | |
| 28 | 40600290 | BIT MATLS TACK CT | 27,449 | POUND | $0.0100 | $0.0100 | $0.0100 | $0.0100 | $0.0100 | |
| 29 | 40600370 | LONG JOINT SEALANT | 13,256 | FOOT | $3.00 | $2.95 | $3.12 | $3.60 | $4.00 | |
| 30 | 40600400 | MIX CR JTS FLANGEWYS | 61 | TON | $0.0100 | $50.00 | $0.0100 | $150.00 | $0.0100 | |
| 31 | 40600982 | HMA SURF REM BUTT JT | 261 | SQ YD | $0.0100 | $1.00 | $0.0100 | $15.00 | $0.0100 | |
| 32 | 40602985 | HMA BC IL-9.5 N70 | 4,526 | TON | $81.50 | $84.50 | $69.00 | $77.00 | $80.00 | |
| 33 | 40604062 | HMA SC IL-9.5 D N70 | 3,960 | TON | $84.00 | $85.50 | $72.00 | $79.00 | $80.00 | |
| 34 | 42001300 | PROTECTIVE COAT | 207 | SQ YD | $3.05 | $2.10 | $3.30 | $5.00 | $3.00 | |
| 35 | 42400200 | PC CONC SIDEWALK 5 | 1,865 | SQ FT | $13.50 | $13.90 | $12.65 | $10.00 | $13.00 | |
| 36 | 42400800 | DETECTABLE WARNINGS | 275 | SQ FT | $32.00 | $28.00 | $33.00 | $26.00 | $20.00 | |
| 37 | 44000164 | HMA SURF REM 3 3/4 | 40,403 | SQ YD | $4.00 | $3.15 | $3.10 | $4.00 | $5.00 | |
| 38 | 44000600 | SIDEWALK REM | 1,865 | SQ FT | $2.05 | $3.25 | $1.65 | $5.00 | $2.75 | |
| 39 | 44201789 | CL D PATCH T2 12 | 120 | SQ YD | $35.00 | $95.00 | $117.00 | $109.00 | $125.00 | |
| 40 | 44201794 | CL D PATCH T3 12 | 320 | SQ YD | $35.00 | $85.00 | $117.00 | $108.00 | $115.00 | |
| 41 | 44201796 | CL D PATCH T4 12 | 620 | SQ YD | $35.00 | $73.00 | $117.00 | $103.00 | $100.00 | |
| 42 | 48102100 | AGG WEDGE SHLD TYPE B | 755 | TON | $42.00 | $50.00 | $30.00 | $42.00 | $35.00 | |
| 43 | 60255500 | MAN ADJUST | 2 | EACH | $500.00 | $900.00 | $1,000.00 | $750.00 | $1,000.00 | |
| 44 | 60300305 | FR & LIDS ADJUST | 2 | EACH | $500.00 | $900.00 | $800.00 | $750.00 | $1,000.00 | |
| 45 | 66900200 | NON SPL WASTE DISPOSL | 25 | CU YD | $150.00 | $108.00 | $100.00 | $280.00 | $100.00 | |
| 46 | 66900530 | SOIL DISPOSAL ANALY | 1 | EACH | $2,100.00 | $2,100.00 | $1,650.00 | $1,980.00 | $1,980.00 | |
| 47 | 66901001 | REG SUB P-CONST PLAN | 1 | L SUM | $2,800.00 | $2,900.00 | $2,250.00 | $2,700.00 | $2,700.00 | |
| 48 | 66901003 | REG SUB F CON REPORT | 1 | L SUM | $2,400.00 | $2,400.00 | $2,250.00 | $2,300.00 | $2,300.00 | |
| 49 | 66901006 | REG SUB MON | 5 | CAL DA | $1,025.00 | $1,050.00 | $1,000.00 | $1,000.00 | $1,000.00 | |
| 50 | 67100100 | MOBILIZATION | 1 | L SUM | $70,000.00 | $88,000.00 | $66,412.95 | $73,800.00 | $98,000.00 | |
| 51 | 70100460 | TRAF CONT-PROT 701306 | 1 | L SUM | $4,000.00 | $1,700.00 | $108,315.00 | $100.00 | $100.00 | |
| 52 | 70102620 | TR CONT & PROT 701501 | 1 | L SUM | $1.00 | $56,295.15 | $0.0100 | $4,500.00 | $46,800.00 | |
| 53 | 70102635 | TR CONT & PROT 701701 | 1 | L SUM | $1.00 | $550.00 | $0.0100 | $100.00 | $100.00 | |
| 54 | 70102640 | TR CONT & PROT 701801 | 1 | L SUM | $1.00 | $2,250.00 | $0.0100 | $1,300.00 | $100.00 | |
| 55 | 70300100 | SHORT TERM PAVT MKING | 11,300 | FOOT | $0.0100 | $0.0100 | $0.0100 | $1.90 | $0.0100 | |
| 56 | 70300150 | SHRT TRM PAVT MK REM | 4,475 | SQ FT | $0.0100 | $0.0100 | $0.0100 | $4.40 | $0.0100 | |
| 57 | 70300211 | TEMP PVT MK LTR & SYM PAINT | 132 | SQ FT | $0.0100 | $0.0100 | $0.0100 | $2.00 | $1.35 | |
| 58 | 70300221 | TEMP PVT MK LINE 4 - PAINT | 39,174 | FOOT | $0.0100 | $0.0100 | $0.0100 | $0.3400 | $0.4500 | |
| 59 | 70300241 | TEMP PVT MK LINE 6 - PAINT | 720 | FOOT | $0.0100 | $0.0100 | $0.0100 | $0.3500 | $0.7000 | |
| 60 | 70300251 | TEMP PVT MK LINE 8 - PAINT | 30 | FOOT | $0.0100 | $0.0100 | $0.0100 | $0.7000 | $0.9000 | |
| 61 | 70300261 | TEMP PVT MK LINE 12 - PAINT | 129 | FOOT | $0.0100 | $0.0100 | $0.0100 | $1.05 | $1.35 | |
| 62 | 70300281 | TEMP PVT MK LINE 24 - PAINT | 264 | FOOT | $0.0100 | $0.0100 | $0.0100 | $2.10 | $2.70 | |
| 63 | 70307120 | TEMP PVT MK L4 T4 TAPE | 39,174 | FOOT | $0.0100 | $0.0100 | $0.0100 | $1.40 | $1.25 | |
| 64 | 78000100 | THPL PVT MK LTR & SYM | 132 | SQ FT | $5.35 | $5.65 | $5.78 | $5.00 | $5.25 | |
| 65 | 78000200 | THPL PVT MK LINE 4 | 39,174 | FOOT | $0.7500 | $0.6500 | $0.8000 | $0.9400 | $0.6000 | |
| 66 | 78000400 | THPL PVT MK LINE 6 | 720 | FOOT | $1.10 | $1.10 | $1.32 | $1.46 | $1.05 | |
| 67 | 78000500 | THPL PVT MK LINE 8 | 31 | FOOT | $1.40 | $1.45 | $1.65 | $1.94 | $1.35 | |
| 68 | 78000600 | THPL PVT MK LINE 12 | 130 | FOOT | $2.55 | $2.70 | $2.42 | $2.91 | $2.50 | |
| 69 | 78000650 | THPL PVT MK LINE 24 | 264 | FOOT | $5.35 | $5.70 | $5.78 | $5.83 | $5.25 | |
| 70 | 78100100 | RAISED REFL PAVT MKR | 463 | EACH | $40.00 | $41.00 | $44.55 | $45.10 | $39.00 | |
| 71 | 78300200 | RAISED REF PVT MK REM | 463 | EACH | $0.0100 | $1.00 | $8.00 | $13.50 | $0.0100 | |
| 72 | 78300202 | PVT MKG REM WTR BLAST | 14,118 | SQ FT | $0.0100 | $0.4500 | $0.0100 | $1.05 | $3.00 | |
| 73 | 81028200 | UNDRGRD C GALVS 2 | 53 | FOOT | $95.50 | $100.00 | $71.50 | $65.00 | $65.00 | |
| 74 | 85000200 | MAIN EX TR SIG INSTAL | 1 | EACH | $2,540.00 | $2,700.00 | $2,200.00 | $2,000.00 | $2,000.00 | |
| 75 | 87301215 | ELCBL C SIGNAL 14 2C | 824 | FOOT | $3.35 | $3.50 | $3.30 | $3.00 | $3.00 | |
| 76 | 87301225 | ELCBL C SIGNAL 14 3C | 1,232 | FOOT | $3.70 | $3.90 | $3.58 | $3.25 | $3.25 | |
| 77 | 87301900 | ELCBL C EGRDC 6 1C | 68 | FOOT | $3.80 | $4.00 | $3.30 | $3.00 | $3.00 | |
| 78 | 87900200 | DRILL EX HANDHOLE | 3 | EACH | $370.00 | $394.00 | $660.00 | $600.00 | $600.00 | |
| 79 | 88102717 | PED SH LED 1F BM CDT | 12 | EACH | $675.00 | $700.00 | $770.00 | $700.00 | $700.00 | |
| 80 | 88600100 | DET LOOP T1 | 1,442 | FOOT | $30.00 | $29.50 | $33.00 | $30.00 | $30.00 | |
| 81 | 89502300 | REM ELCBL FR CON | 1,107 | FOOT | $2.70 | $3.00 | $1.10 | $1.00 | $1.00 | |
| 82 | 89502375 | REMOV EX TS EQUIP | 1 | EACH | $370.00 | $394.00 | $3,850.00 | $3,500.00 | $3,500.00 | |
| 83 | 89502376 | REBUILD EX HANDHOLE | 1 | EACH | $1,875.00 | $1,950.00 | $5,500.00 | $5,000.00 | $5,000.00 |