‹ All IDOT jobs My Jobs
The placement of bridge deck concrete sealer upon the entire top surface of the bridge deck, sidewalks, top of
ExecutedThis Improvement consists of the placement of bridge deck concrete sealer upon the entire top surface of the bridge deck, sidewalks, top of inside vertical faces of the parapets, face of curbs and inside and outside of dividing walls along walkways of the structure, both faces of parapet where parapet separates roadway from sidewalk. These improvements are located on various routes/ structures within the Lake County limits.
- Let date
- Friday, September 18, 2026
- Bids open
- Sep 18, 2026 12:00 PM
- District
- District 1
- County
- Lake
- Letting item
- 010
- Added
- Nov 25, 2026 No longer listed