| Let date | Contract / PPS | County / Division | Highway | Description | Estimate | Status | Low bidder | |
|---|---|---|---|---|---|---|---|---|
| Dec 13, 2024 | 62T04 | WillDistrict 1 | Bridge deck overlay, reconstruction of abutment deck joint, approach slab repairs and substructure repairs of The proposed improvement consists of bridge deck overlay, reconstruction of abutment deck joint, approach slab repairs and substructure repairs of the bridge located on La Grange Road/US 45 at Hickory Creek in Will County. Gross length: 4854 Ft (0.919 Mi), Net length: 1327 Ft (0.252 Mi). | — | Executed | D. Construction, Inc. $1,407,207 · | ||
| Dec 13, 2024 | 62T17 | DuPageDistrict 1 | (760-Ft) Bridge Deck Overlay, Bridge Joint Replacement / Repair at IL 38 (Roosevelt Rd) at IL 53. This project is located in the Village of Glen Ellyn in DuPage County. | — | Executed | D. Construction, Inc. $1,972,826 · | ||
| Dec 13, 2024 | 62T30 | DuPageDistrict 1 | (307-Ft) Bridge preservation project: Deck overlay, Joints replacement/repair. Located on IL 53 / Rohlwing Road, at Canadian National (CN) Railroad (approximately 0.1-miles South of Fullerton Avenue) in the Village of Addison. | — | Executed | Martam Construction Incorporated $1,491,736 · | ||
| Jan 17, 2025 | 61J25 | WillDistrict 1 | Widening and reconstruction of Plainfield-Naperville Road at 127th Street and Reagan Boulevard in Plainfield. Includes addition of left turn lanes, curb and Gutter, HMA and Aggregate shoulders, concrete medians, guardrail, traffic signals and lighting. | — | Executed | P. T. Ferro Construction Co. $3,803,259 · | ||
| Jan 17, 2025 | 61J63 | CookDistrict 1 | Construction of a multi-use path on Euclid Avenue from Vermon Street to Hicks Street and continuing on Hicks too Kirchoff Road in Rolling Meadows. | — | Executed | Martam Construction Incorporated $1,051,893 · | ||
| Jan 17, 2025 | 61J91 | KaneDistrict 1 | Resurfacing and traffic signal modifications at various intersections on Indian Trail from Edgelawn Drive to Highland Avenue in Aurora | — | Executed | Geneva Construction Company $4,562,538 · | ||
| Jan 17, 2025 | 61K01 | DuPageDistrict 1 | Sidewalk construction, traffic signals and street lights on York Street from WB I-290 ramps/Crestview Avenue to Lake Street in Elmhurst. | — | Rejected | Martam Construction Incorporated $2,649,349 · | ||
| Jan 17, 2025 | 61K07 | CookDistrict 1 | Resurfacing and pavement widening at the IL 62/New Wilke Road intersection in Rolling Meadows. | — | Executed | Schroeder Asphalt Services, Inc. $2,851,746 · | ||
| Jan 17, 2025 | 61K43 | McHenryDistrict 1 | HMA resurfacing, PCC sidewalks, curb and gutter, outdoor fireplace and shelter construction, and landscaping at the downtown Cary Gateway Plaza in Cary. | — | Executed | Sjostrom & Sons, Inc. $1,190,661 · | ||
| Jan 17, 2025 | 61K53 | CookDistrict 1 | Install decorative street and pedestrian lighting on Des Plaines Avenue from Cermak Road to 26th Street in North Riverside. | — | Executed | Utility Dynamics Corporation $1,103,396 · | ||
| Jan 17, 2025 | 61K68 | KaneDistrict 1 | HMA resurfacing, curb and gutter, sidewalks, ADA ramps, traffic signals, lighting and pavement markings on Dundee Avenue between Enterprise Street and Page Street in Elgin. | — | Executed | Martam Construction Incorporated $9,964,717 · | ||
| Jan 17, 2025 | 61K81 | WillDistrict 1 | Widen and resurface Theodore Street from west of Staghorn Drive to Wesmere Parkway in Joliet. | — | Executed | Austin Tyler Construction, Inc. $2,764,372 · | ||
| Jan 17, 2025 | 61K84 | WillDistrict 1 | Construction of an HMA multi-use path, PCC Sidewalk, storm sewer, box culvert extension, retaining wall, and landscaping along Bridge Street in Channahon. | — | Executed | D. Construction, Inc. $2,494,970 · | ||
| Jan 17, 2025 | 61K86 | CookDistrict 1 | Resurfacing Grand Boulevard from Grant Avenue to Prairie; Brookfield Avenue from Prairie Avenue to Woodside Ave., and Woodside Avenue from Golf Road to Brookfield Avenue in Brookfield. | — | Executed | Schroeder Asphalt Services, Inc. $4,534,006 · | ||
| Jan 17, 2025 | 61K87 | CookDistrict 1 | Reconstruction of 19th Avenue from Oak Street to Madison Street in Maywood. | — | Executed | Berger Excavating Contractors, Inc. d/b/a Berger Contractors, Inc. $4,773,174 · | ||
| Jan 17, 2025 | 61K90 | DuPageDistrict 1 | Resurfacing Indian Trail Road from the Kane/DuPage County line to Eola Road in Aurora. | — | Executed | Geneva Construction Company $1,102,489 · | ||
| Jan 17, 2025 | 61K91 | LakeDistrict 1 | Resurfacing Washington Avenue from Western Avenue to Sheridan Road in Highland. | — | Executed | Peter Baker & Son Co. $464,636 · | ||
| Jan 17, 2025 | 61K92 | McHenryDistrict 1 | Construct a single-cell, three-sided precast structure to carry Hunter Road over Little Beaver Creek west of Harvard. Work includes HMA paving, shoulder construction, and landscaping. | — | Executed | Dunnet Bay Construction Company $2,789,285 · | ||
| Jan 17, 2025 | 61K94 | CookDistrict 1 | Traffic signal modernization, sidewalk replacemnt, curb and gutter replacement, and pavement markings at the intersection of Wolf Road and Wiltse Drive in Northlake. | — | Executed | R. W. Dunteman Company $711,000 · | ||
| Jan 17, 2025 | 61K97 | McHenryDistrict 1 | HMA resurfcing, curb and gutter, sidewalks, drainage improvements, and parkway restoration on First Street from US 14 to Three Oaks Road in Cary. | — | Rejected | |||
| Jan 17, 2025 | 61K98 | KaneDistrict 1 | Construciton of PPC Sidewalks, ADA Ramps, pavement markings and landscaping at various locations in Batavia. | — | Executed | Triggi Construction, Inc. $414,112 · | ||
| Jan 17, 2025 | 61L00 | McHenryDistrict 1 | HMA resurfacing and aggregate shoulders on Wonder Lake Road, from Thompson Road to White Oaks Road in Wonder Lake. | — | Executed | Curran Contracting Company $619,752 · | ||
| Jan 17, 2025 | 61L03 | KaneDistrict 1 | Installation of Recessed Reflective Pavement Markers and pavement marking at various locations in Kane County. | — | Executed | Precision Pavement Markings Inc. $545,288 · | ||
| Jan 17, 2025 | 61L04 | DuPageDistrict 1 | Roadway reconstruction on Woodridge Drive from Hobson Road to Center Drive in Woodridge. | — | Executed | K-Five Construction Corporation $2,756,923 · | ||
| Jan 17, 2025 | 61L07 | CookDistrict 1 | HMA Resurfacing, pavement patching, curb and gutter, sidewalk, pedestrian signals , ADA improvements, and pavement markings on Devon Avenue between Bristol Lane and Arthur Avenue in Elk Grove Village. | — | Executed | Plote Construction, Inc. $1,405,063 · | ||
| Jan 17, 2025 | 61L08 | CookDistrict 1 | HMA resurfacing, pavement patching, ADA Ramps, traffic signal modifications, street lightin, pavement markings, and signage on Devon Avenue and Arlington Heights Road in Elk Grove Village. | — | Executed | Plote Construction, Inc. $1,585,102 · | ||
| Jan 17, 2025 | 62R95 | McHenryDistrict 1 | (3.47-Mile) SMART Overlay, curb ramps (ADA) improvements, HMA shoulder additions located on IL 173 from Boone County Line to Flat Iron Road in Unincorporated McHenry County. | — | Executed | Peter Baker & Son Co. $2,149,178 · | ||
| Jan 17, 2025 | 62R99 | CookDistrict 1 | Bridge deck overlay, joint replacement, approach slab repairs and substructure repairs of the bridge located o (1576.49-Ft) The proposed improvement consists of bridge deck overlay, joint replacement, approach slab repairs and substructure repairs of the bridge located on US/ Ogden Avenue over IHB RR in the Village of LaGrange, Cook County | — | Executed | Martam Construction Incorporated $1,945,196 · | ||
| Jan 17, 2025 | 62T21 | DuPageDistrict 1 | (6.15-Mile) Smart Overlay and ADA Ramp improvements, hot-mix asphalt surface removal and replacement, pedestrian ramp, pavement patching, pavement markings. Project location at IL 56 (Butterfield Road) from 0.4 mile west of IL 59 to East of Naperville Road within Cities of Warrenville, Wheaton and Aurora in Dupage Co. | — | Executed | R. W. Dunteman Company $6,615,450 · | ||
| Jan 17, 2025 | 62T41 | CookDistrict 1 | Bridge deck overlay and joint repair of the structure located on Addison Street over I-90/94 and CTA in Cook C (921-Ft) The proposed improvement consists of bridge deck overlay and joint repair of the structure located on Addison Street over I-90/94 and CTA in Cook County. (SN-016-0669) | — | Executed | Martam Construction Incorporated $1,234,765 · | ||
| Jan 17, 2025 | 62U88 | WillDistrict 1 | (4.32-Mile) Patching (full depth, class D patches) work includes: Earth excavation, aggregate subgrade improvement, subbase granular material, full depth Class D (HMA) patches, special, detector loops, pavement markings and and incidental and collateral work. Located on IL 53, from South of Arsenal Road to Hoff Road within the City of Wilmington and the Village of Elwood in Will County. | — | Executed | K-Five Construction Corporation $9,653,442 · | ||
| Jan 17, 2025 | 62V90 | CookDistrict 1 | HMA overlay, ADA sidewalk and curb ramp improvements, drainage improvements, APS improvements, HMA surface rem (1.88-Mile) Standard Overlay, Drainage and ADA Improvements: HMA surface removal and replacement, Class D patches, detector loops replacement, pavement markings, sidewalk and curb removal and replacement, drainage structures adjustments, minor traffic signal (APS) improvements. The project also includes - Pavement markings/ striping improvements at 17th Avenue and Salt Creek Trail crossing. - New sidewalk and curb ramps for sidewalks (ADA) improvements on Roosevelt Road and Frontage Road, just W | — | Rejected | K-Five Construction Corporation $2,943,344 · | ||
| Jan 17, 2025 | 62W32 | LakeDistrict 1 | The installing scour countermeasures such as riprap erosion control and landscaping The improvement consists of the installing scour countermeasures such as riprap erosion control and landscaping. The project is located approximately 0.1 miles west of the Tri-State Tollway (I-94) and 1,100 ft east of Illinois Route 21 at SN 049-0046 and SN 049-0047 along Illinois Route 120 in the Village of Gurnee in Lake County. | — | Executed | Martam Construction Incorporated $617,286 · | ||
| Jan 17, 2025 | 62W49 | DuPageDistrict 1 | (1.40-Mile) Standard Overlay, ADA Improvements: Hot-mix asphalt surface removal earth excavation, new shoulders, pavement patching, hot-mix asphalt surface course, hot-mix asphalt binder course, curb and gutter removal and replacement, longitudinal joint sealing, thermoplastic pavement markings, raised reflective pavement markers, detector loops replacement and incidental and collateral work Project is located on I-55 (North) Frontage Road, from Clarendon Hills Road to Cass Avenue, within the Ci | — | Executed | K-Five Construction Corporation $1,066,333 · | ||
| Jan 17, 2025 | 62W52 | WillDistrict 1 | Furnishing the structural steel and bearings for the I-80 bridges over the Des Plaines River The proposed scope of work consists of furnishing the structural steel and bearings for the I-80 bridges over the Des Plaines River. Steel will also need to be stored until it can arrive on-site as part of the Contract (62R23). Steel will be for WB and EB of I-80 (SN 099-8309 WB and 099-8325 EB) over the Des Plain River, CSX Railroad, US-6, as well as several existing and proposed local roads The project is in the City of Joliet in Will County. | — | Executed | Veritas Steel LLC $28,658,382 · | ||
| Jan 17, 2025 | 62W71 | CookDistrict 1 | (3139.11-Ft) This project is a Standard Overlay and ADA Improvements. Located on Addison Street from IL. Route 171 (Cumberland Avenue) to Forest Preserve Drive within the City of Chicago. | — | Executed | A Lamp Concrete Contractors, Inc. $1,098,089 · | ||
| Jan 17, 2025 | 62X15 | CookDistrict 1 | (4,921-Ft) Designed Overlay, SMART Overlay, Curb Ramps (ADA) and Pedestrian Signals (APS) improvements on 5th Avenue from North River Road to IL 64 (North Avenue). This project is in the Villages of River Grove and Melrose Park in Cook County. | — | Executed | K-Five Construction Corporation $1,483,000 · | ||
| Jan 17, 2025 | 62X24 | CookDistrict 1 | Bridge repair to structures (016-1152 and 016-1153) under Garfield Blvd This improvement consists of bridge repair to structures (016-1152 and 016-1153) under Garfield Blvd. (55th St.) for project length of 546.8 ft (.103 miles) in the City of Chicago in Cook County. | — | Executed | Rausch Infrastructure, LLC $747,244 · | ||
| Jan 17, 2025 | 62X49 | LakeDistrict 1 | A Bridge Painting of the existing structure (049-0171) carrying IL 59 over Rollins Road, the existing structur This improvement consists of a Bridge Painting of the existing structure (049-0171) carrying IL 59 over Rollins Road, the existing structure (049-0016) carrying Washington Road over US 41, and the existing structure (049-0097) carrying Washington Road over the UP RR in the Village of FOX Lake, and the Village of FOX Lake, and the City of Park City in Lake County for a total length of 749 feet. | — | Executed | Capital Industrial Services, LLC $893,330 · | ||
| Jan 17, 2025 | 62X51 | VariousDistrict 1 | Restoring existing native landscapes at various roadside locations in D1. | — | Executed | McGinty Bros., Inc. $210,094 · | ||
| Jan 17, 2025 | 62X54 | McHenryDistrict 1 | Demolition of (2) single family residences (1-two story wood frame with attached garage) and demolition of (2) The scope of work consists of demolition of (2) single family residences (1-two story wood frame with attached garage) and demolition of (2) two commercial properties (1-one story concrete building, 1-story concrete block and wood frame) including site cleanup and any incidental and collateral work necessary to complete the improvements as shown in the plans. The project is in the plans The project is in the City of Woodstock in McHenry County. | — | Executed | Veterans Vac Services LLC $199,014 · | ||
| Jan 17, 2025 | 62X75 | CookDuPageDistrict 1 | Expressway Cleaning (Litter/Debris Removal) on various routes in D1. | — | Executed | Orlando Lawn Service, Inc. $276,000 · | ||
| Jan 17, 2025 | 62X78 | CookWillDistrict 1 | Expressway Cleaning (Litter/Debris Removal), This work is located on I-57 expressway from I-90/94 (Dan Ryan Expressway) to Will / Kankakee County Line in Cook and Will Counties. | — | Executed | Orlando Lawn Service, Inc. $227,238 · | ||
| Jan 17, 2025 | 62X80 | VariousDistrict 1 | Mowing the roadsides of expressways This work consists of mowing the roadsides of expressways. The project is located along various expressways at various locations in D1. | — | Executed | MYS, Incorporated $656,550 · | ||
| Jan 17, 2025 | 62X81 | CookWillDistrict 1 | Expressway Cleaning (Litter/Debris Removal), This work is located on FAI 80, I-80 Expressway from I-294 (Tri-State Tollway) to Will / Kendall County Line in Cook and Will Counties. | — | Executed | Thor General Contracting LLC $210,330 · | ||
| Mar 7, 2025 | 61J84 | KaneDistrict 1 | Reconstruct IL 38 from Fox River Bridge to Kirk Road in Geneva. | — | Executed | R. W. Dunteman Company $30,162,688 · | ||
| Mar 7, 2025 | 61K89 | CookDistrict 1 | Roadway Reconstruction at the intersection of John Humphrey Drive and 143rd Street in Orland Park. Includes drainage improvements, installation of a pile supported embankment system, replacement of the wearing surface on the existing dry land bridge, traffic signal modernization and interconnection, and lighting improvements. | — | Executed | D. Construction, Inc. $9,722,683 · | ||
| Mar 7, 2025 | 61L01 | CookDistrict 1 | Resurfacing 171st Street from Dixie Highway to Wood Street in Hazel Crest. | — | Executed | D. Construction, Inc. $341,757 · | ||
| Mar 7, 2025 | 61L02 | WillDistrict 1 | Construct an HMA Multi-Use Path in Home Glen, from Coachman Lane to Heatherwood Drive. Includes HMA Pavement removal, sidewalks, ADA ramps, and signage. | — | Executed | D. Construction, Inc. $398,891 · | ||
| Mar 7, 2025 | 61L05 | LakeDistrict 1 | Resurfacing, PCC base course, decorative PCC sidewalk, granite cobble curb, brick paver banding, and crosswalks, decorative lighting, and landscaping on Deerpath Road from Oakwood Avenue to Western Avenue in Lake Forest. | — | Executed | D'Land Construction, LLC $2,990,057 · | ||
| Mar 7, 2025 | 61L09 | CookDistrict 1 | Traffic signal modernization at the intersection of Wolf Road and Palmer Avenue in Northlake. | — | Executed | Home Towne Electric, Inc. $674,695 · | ||
| Mar 7, 2025 | 61L10 | DuPageDistrict 1 | PCC Sidewalk with segmental concrete block retaining wall from Freeport Drive to DuJardin Elementary Shcool. Additional work includes curb and gutter, pavement patching, storm sewer, steel railing, and fencing. | — | Executed | D'Land Construction, LLC $225,598 · | ||
| Mar 7, 2025 | 61L12 | CookDistrict 1 | Resurface Main Street from US 30 to 216th Street in Matteson. | — | Executed | Gallagher Asphalt Corporation $824,771 · | ||
| Mar 7, 2025 | 61L13 | WillDistrict 1 | HMA resurfacing on Highpoint Drive from Discovery Park to Weber Road in Romeoville. Additional work includes Class D patches, PCC driveways, sidewalks, drainage and utility structures, and pavement markings. | — | Executed | P. T. Ferro Construction Co. $392,397 · | ||
| Mar 7, 2025 | 61L14 | CookDistrict 1 | HMA resurfacing on Center Street from 175th Street to 171st Street in East Hazel Crest. Additional work includes Patching, HMA shoulders, Driveways, Sidewalks, an HMA Multi-use Path, Lighting, Drainage Structures, and Pavement Markings. | — | Executed | D. Construction, Inc. $927,996 · | ||
| Mar 7, 2025 | 61L15 | CookDistrict 1 | Resurface 207th Street from IL 50 to Crawford Avenue in Matteson. | — | Executed | P. T. Ferro Construction Co. $899,917 · | ||
| Mar 7, 2025 | 61L16 | LakeDistrict 1 | Sidewalk improvements at various intersections in Lake Forest. | — | Executed | D'Land Construction, LLC $246,136 · | ||
| Mar 7, 2025 | 61L17 | LakeDistrict 1 | Resurfacing Hart Road from West of the Village limits to Round Lake Road in Round Lake | — | Executed | Peter Baker & Son Co. $388,288 · | ||
| Mar 7, 2025 | 61L20 | CookDistrict 1 | Resurfacing Taft Drive from east of Union Avneu to Canal Street in South Holland. | — | Executed | D. Construction, Inc. $413,449 · | ||
| Mar 7, 2025 | 61L23 | CookDistrict 1 | HMA Resurfacing on Hassell Road from Fairway Cout to Rosedale Lane in Hoffman Estates. Additional work includes patching, ADA Ramp, Sidewalks, Driveways, Pavement Markings, and Signage. | — | Executed | A Lamp Concrete Contractors, Inc. $1,163,964 · | ||
| Mar 7, 2025 | 61L25 | CookDistrict 1 | Roadway, pedestrian, and street improvements on Sterling Avenue from Central Drive to Flossmoor Road in Flossmoor. | — | Executed | D. Construction, Inc. $1,920,303 · | ||
| Mar 7, 2025 | 61L26 | KaneDistrict 1 | Resurfacing on Prairie Street from Randall Road to South 13th Street in St. Charles. | — | Rejected | |||
| Mar 7, 2025 | 61L27 | CookDistrict 1 | HMA resurfacing of Stroy Avenue from 186th Street to Thornton-Lansing Road in Lansing. Includes patching, driveways, curb and gutter, sidewalks, drainage improvements, pavement markings, and signage. | — | Executed | Gallagher Asphalt Corporation $592,913 · | ||
| Mar 7, 2025 | 62G55 | WillDistrict 1 | Pavement patching, milling of existing HMA surface, placing hot-mix asphalt leveling binder and surface course The Standard Overlay consists of pavement patching, milling of existing HMA surface, placing hot-mix asphalt leveling binder and surface course, drainage structures adjustment and cleaning, grading and shaping ditches, placement of pavement markings. Located on Illinois Route 171 (Archer Ave.) begins at Boula Ave. and extends in a northeasterly direction for 4,542.2 feet (0.86 mile ) to approximately 0.1 miles southwest of I-355. The improvement is in the City of Lockport, in Will County. | — | Executed | Gallagher Asphalt Corporation $1,427,655 · | ||
| Mar 7, 2025 | 62L58 | CookDistrict 1 | Pavement patching, hot-mix asphalt surface removal, resurfacing with binder and surface course, sidewalk ramps (1.426-Mile) This improvement consists of pavement patching, hot-mix asphalt surface removal, resurfacing with binder and surface course, sidewalk ramps improvements, curb and gutter replacement, thermoplastic pavement marking, raised reflective pavement markers. Located in the Villages of Lincolnwood and City of Chicago in Cook County. | — | Rejected | Builders Paving, LLC $4,247,496 · | ||
| Mar 7, 2025 | 62N33 | DuPageDistrict 1 | (16.7-Mile) Changeable Message Signs, Signal Timing/Progression, Signing (New), Surveillance, Traffic Signal Modernization and ADA improvements. Located on IL 64 (North Avenue) from Smith / Kautz Rd to York St in the Cities of St. Charles West Chicago, and Elmhurst, and in the Villages of Carol Stream, Glendale Heights, Lombard, Addison, and Villa Park in DuPage County. | — | Rejected | John Burns Construction Company $25,464,000 · | ||
| Mar 7, 2025 | 62N91 | CookDistrict 1 | (3.86-Mile) Bridge Rehabilitation and Roadway Improvement along Il 53 in Cook County. | — | Executed | Dunnet Bay Construction Company & K-Five Construction Corporation $105,964,527 · | ||
| Mar 7, 2025 | 62P43 | CookDistrict 1 | (533-Ft), Bridge Superstructure replacement, bridge abutment replacement, approach slab replacement, pier repairs, lighting, ADA improvements and traffic signal Modernization. This project is located on Leavitt Street over Interstate 290 (I-290) between the intersections of Congress Parkway and Van Buren Street. | — | Executed | Lorig Construction Company $13,975,161 · | ||
| Mar 7, 2025 | 62R58 | CookDuPageDistrict 1 | This project is located along IL 19 (Irving Park Road) from East of Wise Road to Roselle Road. The scope of work includes designed overlay, new shoulders, and ADA improvements. The gross and net length is 14,175 feet (2 .68 miles). It is located in the Villages of Roselle and Schaumburg, and unincorporated Bloomingdale and Schaumburg Townships in Cook and DuPage Counties. | — | Executed | R. W. Dunteman Company $4,792,444 · | ||
| Mar 7, 2025 | 62R73 | CookDistrict 1 | Culvert replacement, construction of a retaining wall, construction of shared-use path, guardrail replacement The proposed improvement consists of culvert replacement, construction of a retaining wall, construction of shared-use path, guardrail replacement and resurfacing located on IL 68 (Dundee Road) over E. Branch of Salt Creek in the Village of Palatine, Cook County. Gross and Net length: 2430 Ft (0.46 Mile) | — | Executed | Martam Construction Incorporated $2,946,729 · | ||
| Mar 7, 2025 | 62R96 | McHenryDistrict 1 | Pavement patching) hot-mix asphalt surface removal, hot-mix asphalt resurfacing, placement of thermoplastic pa (3.16 miles) SMART Overlay consists of pavement patching) hot-mix asphalt surface removal, hot-mix asphalt resurfacing, placement of thermoplastic pavement markings and raised reflective pavement markers, on IL 173 from Northeast of Riegheimer Road to 0.2 miles south of Oak Grove Road. This project is in the City of Harvard and Alden Township. | — | Executed | Peter Baker & Son Co. $1,270,720 · | ||
| Mar 7, 2025 | 62T31 | DuPageDistrict 1 | Gross and Net Length = 3,713 feet (0.703 miles) and 341 feet (0.065 miles). Bridge Preservation Project: Deck Overlay, Joint Replacement / Repair at IL 53 over Ginko Way (Morton Arboretum) and over East Branch DuPage River. This project is located in Unincorporated DuPage County. | — | Executed | D. Construction, Inc. $1,159,146 · | ||
| Mar 7, 2025 | 62T48 | CookDistrict 1 | (1,119-Ft) Bridge preservation project: deck overlay, joints replacement/ repair. Improvement includes hydro scarification, latex modified concrete overlay, deck slab repair, structural repair of concrete, sawcut grooving, join replacement, approach slab repair, concrete sealer, HMA approach butt joints, median replacement and curb and gutter replacement. Location of Work: Western venue at Thorn Creek (approx. 0.2-miles South of Sauk Trail) in the Village of Park Forest. | — | Executed | D. Construction, Inc. $589,859 · | ||
| Mar 7, 2025 | 62T50 | CookDistrict 1 | Bridge deck overlay and joint repair of the structure located on IL 171 over IHB Railroad in Cook County (292-Ft) The proposed improvement consists of bridge deck overlay and joint repair of the structure located on IL 171 over IHB Railroad in Cook County. | — | Executed | D. Construction, Inc. $1,094,671 · | ||
| Mar 7, 2025 | 62T83 | McHenryDistrict 1 | Pavement patching) hot-mix asphalt surface removal, hot-mix asphalt resurfacing, placement of thermoplastic pa (1.49-Mile) SMART Overlay consists of pavement patching) hot-mix asphalt surface removal, hot-mix asphalt resurfacing, placement of thermoplastic pavement markings and raised reflective pavement markers; Location: IL 173, from Harvard Hills Rd to SW of Righeimer Rd within the City of Harvard. | — | Executed | Peter Baker & Son Co. $622,485 · | ||
| Mar 7, 2025 | 62U89 | WillDistrict 1 | The building demolition at various locations The proposed scope of work consists of the building demolition at various locations. Each building removal will include removal any structure above and below the ground, including the main building frames, attached and detached buildings, and facilities. It will also include the removal of fences, sidewalk and_driveways, utilities and trees within the parcels limits. The project is in Will County. | — | Executed | Scanlon Excavating & Concrete, Inc. $498,400 · | ||
| Mar 7, 2025 | 62U91 | LakeDistrict 1 | (1.61-Mile) Standard Overlay, New Shoulders improvement consisting of hot-mix asphalt surface removal, pavement patching, nominal curb and gutter replacement hot-mix asphalt resurfacing, installation of hot-mix asphalt shoulders, grading and shaping of existing aggregate shoulders, and thermoplastic pavement marking Old Skokie Road from US 41 (Skokie Highway) to the Wisconsin State Line within the Village of Wadsworth, in Lake County. | — | Executed | Payne & Dolan, Inc. $2,424,972 · | ||
| Mar 7, 2025 | 62W55 | VariousDistrict 1 | Various Expressway Routes (Daytime Sweeping) This work is located on various State maintained expressway routes located within the counties of Cook, DuPage, Lake and Will. | — | Executed | Central Sweeping of Illinois, LLC $11,515,816 · | ||
| Mar 7, 2025 | 62W60 | CookDuPageDistrict 1 | This work includes trombone mast arm and pole replacement, installation of LED signal heads, traffic signal posts, installation of accessible pedestrian signals with ADA compliant ramps at various locations in District 1. | — | Executed | H & H Electric Co. $1,375,723 · | ||
| Mar 7, 2025 | 62W61 | VariousDistrict 1 | This work includes replacement of existing span wire mounted traffic signals with new mast arm mounted traffic signals. installation of LED signal heads, traffic signal posts and mast arms, installation of accessible pedestrian signals, ADA ramp improvements, connection to KDOT and LCDOT centralized traffic signal systems at various locations in District 1. | — | Executed | H & H Electric Co. $2,125,601 · | ||
| Mar 7, 2025 | 62W63 | CookDistrict 1 | This is a parking lot resurfacing improvement includes pavement removal, drainage structure adjustment, placement of subbase material, HMA binder course HMA surface course, Portland cement concrete, thermoplastic pavement markings. Located in the IDOT Hillside Maintenance Yard at, 4160 May St., Hillside, IL. | — | Executed | A Lamp Concrete Contractors, Inc. $794,968 · | ||
| Mar 7, 2025 | 62W73 | CookDistrict 1 | Standard and Design Overlay and ADA Improvements and all incidental and collateral work (2.89-Mile) Standard and Designed Overlay with ADA improvements on Green Bay Road from Scott Avenue to Kenilworth Avenue located in the Villages of Kenilworth, Winnetka and Glencoe within Cook County. | — | Rejected | Peter Baker & Son Co. $4,682,472 · | ||
| Mar 7, 2025 | 62W87 | CookDistrict 1 | (9.76-Mile) Standard Overlay, Bridge Deck Overlay, Bridge Repair, Bridge Superstructure Replacement, Sign Structures, Lighting, and ITS. Location of Work: I-94 (Bishop Ford Freeway) from West of Martin Luther King Dr to US 6 (159th St) within the Cities of Chicago and Calumet and the Villages of Burnham Riverdale, South Holland and Dolton. | — | Active | Lorig Construction Company $81,370,819 · | ||
| Mar 7, 2025 | 62X21 | CookLakeDistrict 1 | Cleaning and painting designated steel surfaces This is a bridge painting project consists of cleaning and painting designated steel surfaces. Location #1: IL-58 (Dempster St) over I-94 (Edens Expwy) Village of Skokie in Cook County SN: 016-0943. Location #2: Clavey Rd over US-41 (Edens) City of Highland Park in Lake County SN: 049-0165. Location #3: Tower Rd over I-94/US-41 (Edens) Village of Northfield in Cook County SN: 016-0815. | — | Executed | ERA-Valdivia Contractors, Inc. $1,181,744 · | ||
| Mar 7, 2025 | 62X36 | McHenryDistrict 1 | This is a milled rumble strip project. This project begins at the south of the intersection of IL Route 31 (Richmond Road) and Pioneer Drive and proceeds in a northernly direction for 5.204 miles to south of the intersection of IL 31 Tryon Grove Road and U.S. Route 12. The project is located within the Villages of Ringwood and Richmond and the Townships of Richmond and McHenry in McHenry County. | — | Executed | Payne & Dolan, Inc. $348,412 · | ||
| Mar 7, 2025 | 62X76 | CookDuPageWillDistrict 1 | The pickup, removal and satisfactory disposal of debris, deceased animal carcasses, refuse, litter, and any ot The work to be done under Litter Picking shall consist of the pickup, removal and satisfactory disposal of debris, deceased animal carcasses, refuse, litter, and any other rubbish. This work is located on I-55 Expressway from ILL 43 (Harlem Ave) to Reed Road in Cook, DuPage, and Will Counties. | — | Executed | Thor General Contracting LLC $305,910 · | ||
| Mar 7, 2025 | 62X77 | CookWillDistrict 1 | The pickup, removal and satisfactory disposal of debris, deceased animal carcasses, refuse, litter, and any ot Litter Picking shall consist of the pickup, removal and satisfactory disposal of debris, deceased animal carcasses, refuse, litter, and any other rubbish. This work is located on I-94 (Bishop Ford Expwy) from Dan Ryan Expwy to I-80 in Cook County, on IL-394 from I-80 to IL 1 (Dixie Hwy) in Cook and Will Counties, on Stony Island Ave from I-94 to US 12 (95th St) and on 103rd St from Cottage Groove to Stony Island. | — | Executed | Thor General Contracting LLC $477,405 · | ||
| Mar 7, 2025 | 62X79 | CookLakeDistrict 1 | The pickup, removal and satisfactory disposal of debris, deceased animal carcasses, refuse, litter, and any ot The work to be done under Litter Picking shall consist of the pickup, removal and satisfactory disposal of debris, deceased animal carcasses, refuse, litter, and any other rubbish located on I-94 (Edens Expwy) / US 41 (Skokie Hwy) expressway from Clavey Rd to I-90 (Kennedy Expwy) in Cook and Lake Counties. | — | Executed | The Final Connection, Inc. $164,400 · | ||
| Mar 7, 2025 | 62X90 | LakeDistrict 1 | The pickup, removal and satisfactory disposal of limbs, sticks, leaves, sand, stones, dirt, weeds, debris, dec The work to be done under Arterial Cleaning shall consist of the pickup, removal and satisfactory disposal of limbs, sticks, leaves, sand, stones, dirt, weeds, debris, deceased animal carcasses, refuse, litter and any other rubbish located on various State maintained arterial routes located within the county of Lake. | — | Executed | Central Sweeping of Illinois, LLC $2,728,800 · | ||
| Mar 7, 2025 | 62X91 | VariousDistrict 1 | The pickup, removal and satisfactory disposal of limbs, sticks, leaves, sand, stones, dirt, weeds, debris, dec The work to be done under Arterial Cleaning shall consist of the pickup, removal and satisfactory disposal of limbs, sticks, leaves, sand, stones, dirt, weeds, debris, deceased animal carcasses, refuse, litter and any other rubbish. Location is on various State maintained arterial routes located within Kane and McHenry Counties. | — | Executed | Central Sweeping of Illinois, LLC $1,982,600 · | ||
| Mar 7, 2025 | 62X95 | VariousDistrict 1 | Weed Spraying within various areas in District 1 and IDOT District 1 maintenance yards: Alsip, Oakbrook, Gurnee, and Northbrook. | — | Executed | ALLEN CHASE ENTERPRISES INC. $338,044 · | ||
| Apr 25, 2025 | 61G79 | DuPageDistrict 1 | Widening the North Aurora road underpass and construction of railroad Bridges to carry WCL and BNSF Railways over North Aurora Road in Naperville. | — | Executed | OHLA Central, Inc. $33,197,030 · | ||
| Apr 25, 2025 | 61K19 | CookDistrict 1 | HMA resurfacing on Landmeier Road from Lively Boulevard to Cambridge Drive in Grove Village. Includes; patching, curb and gutter, storm sewer, sidewalks, traffic signal relocation, and ADA improvements. | — | Rejected | R. W. Dunteman Company $1,589,589 · | ||
| Apr 25, 2025 | 61K26 | KaneDistrict 1 | Replace the bridge carrying TR 2110 over the CN Railroad, 0.5 mile north of Bowes Road. | — | Executed | Rausch Infrastructure, LLC $3,894,087 · | ||
| Apr 25, 2025 | 61K44 | WillDistrict 1 | Construct an HMA shared-use path with pedestrial bridge and two boardwalks from 265th strett to the south end of the existing trail south of Burville Rd. | — | Executed | D. Construction, Inc. $3,654,428 · | ||
| Apr 25, 2025 | 61K61 | WillDistrict 1 | Construction of three 7'X 5' precast concrete box culverts to carry Woodcreek Drive over Lily Cache Lane Tributary in Bollingbrook. Includes; lighting, HMA Pavement, curb and gutter, and sidewalks. | — | Executed | D. Construction, Inc. $753,049 · | ||
| Apr 25, 2025 | 61K79 | DuPageDistrict 1 | Construct HMA bike paths at various locations in Carol Stream. | — | Executed | Everlast Blacktop Inc. $871,518 · | ||
| Apr 25, 2025 | 61K95 | DuPageDistrict 1 | HMA resurfacing on Lombard Rod from Army Trail Boulevard to Lake Street in Addison. Includes; ADA improvements, storm sewers, and Landscaping. | — | Executed | R. W. Dunteman Company $1,638,372 · | ||
| Apr 25, 2025 | 61L06 | CookDistrict 1 | Construct a shared-use path and roadway reconstruction at various locations in Park Forest. | — | Executed | D. Construction, Inc. $6,160,173 · | ||
| Apr 25, 2025 | 61L18 | McHenryDistrict 1 | HMA roadway reconstruction and construction of a shared-use path from Washington Street to IL 176 on Prospect Street and on IL 176 from Prospect Street east for 600 feet, in the city of Marengo. Includes; storm sewer and parkway restoration. | — | Executed | PirTano Construction Co., LLC $3,549,900 · |
1–100 of 1,219Next ›
Lettings: IDOT Transportation Bulletin (Notice of Letting and Contract Detail pages). Planned projects: IDOT Multi-Year Highway Improvement Program (roadway, structure and spot layers on the IDOT open data hub), listed by program year, not let date. "Added" is the first date Bid Potato saw the job. Always confirm against the official proposal before bidding.