FAP 0846A 23 PATCH
- Let date
- Friday, January 17, 2025
- Contract
- 62U88 · job page
- District
- District 1
- County
- Will
- Highway
- Limits
- (4.32-Mile) Patching (full depth, class D patches) work includes: Earth excavation, aggregate subgrade improvement, subbase granular material, full depth Class D (HMA) patches, special, detector loops, pavement markings and and incidental and collateral work. Located on IL 53, from South of Arsenal Road to Hoff Road within the City of Wilmington and the Village of Elwood in Will County.
- Classification
- ·
- Project number
Bidders 4
| # | Contractor | Total bid | vs estimate | vs low |
|---|---|---|---|---|
| EE | Engineer's estimate | — | ||
| 1 | K-Five Construction Corporation Low bidder | $9,653,442 | ||
| 2 | Gallagher Asphalt Corporation | $10,332,568 | +7.0% | |
| 3 | Austin Tyler Construction, Inc. | $10,367,460 | +7.4% | |
| 4 | D. Construction, Inc. | $15,297,931 | +58.5% |
| Seq | Bid code | Description | Qty | Unit | Estimate | #1 K-Five Construc… | #2 Gallagher Aspha… | #3 Austin Tyler Co… | #4 D. Construction… |
|---|---|---|---|---|---|---|---|---|---|
| 1 | X1400150 | SERV INSTL GR MT MTR | 1 | EACH | $4,535.00 | $4,535.00 | $10,000.00 | $11,000.00 | |
| 2 | X4420828 | CL D PATCH T3 12 SPL | 1,235 | SQ YD | $85.98 | $170.00 | $99.20 | $137.00 | |
| 3 | X4421790 | CL D PATCH T2 12 SPL | 485 | SQ YD | $153.00 | $210.00 | $98.00 | $138.00 | |
| 4 | X4421791 | CL D PATCH T4 12 SPL | 89,005 | SQ YD | $85.98 | $83.00 | $81.15 | $130.00 | |
| 5 | X6700407 | ENGRS FLD OFC TY A D1 | 12 | CAL MO | $3,000.00 | $3,800.00 | $4,000.00 | $5,000.00 | |
| 6 | X8860105 | DET LOOP REPL | 78 | FOOT | $27.38 | $27.39 | $25.00 | $27.50 | |
| 7 | X8891009 | VID VEH DET SYS SN AP | 1 | EACH | $15,320.00 | $15,319.20 | $25,000.00 | $27,500.00 | |
| 8 | Z0030850 | TEMP INFO SIGNING | 104 | SQ FT | $16.71 | $30.00 | $20.00 | $30.00 | |
| 9 | Z0076604 | TRAINEES TPG | 3,000 | HOUR | $15.00 | $15.00 | $15.00 | $15.00 | |
| 10 | 20200100 | EARTH EXCAVATION | 15,426 | CU YD | $0.0100 | $0.0100 | $37.00 | $0.0100 | |
| 11 | 20201200 | REM & DISP UNS MATL | 1,714 | CU YD | $128.00 | $50.00 | $38.15 | $40.00 | |
| 12 | 21001000 | GEOTECH FAB F/GR STAB | 9,075 | SQ YD | $0.0100 | $3.00 | $3.00 | $7.00 | |
| 13 | 30300112 | AGG SUBGRADE IMPR 12 | 9,075 | SQ YD | $0.0100 | $42.00 | $30.30 | $50.00 | |
| 14 | 31101200 | SUB GRAN MAT B 4 | 81,650 | SQ YD | $6.57 | $0.0100 | $12.00 | $17.00 | |
| 15 | 64200108 | SHOULDER RUM STRIP 8 | 13,675 | FOOT | $1.30 | $1.20 | $1.10 | $0.8500 | |
| 16 | 66900200 | NON SPL WASTE DISPOSL | 535 | CU YD | $84.00 | $80.00 | $68.00 | $70.00 | |
| 17 | 66900530 | SOIL DISPOSAL ANALY | 2 | EACH | $1,500.00 | $1,740.00 | $1,740.00 | $3,630.00 | |
| 18 | 66901001 | REG SUB P-CONST PLAN | 1 | L SUM | $3,300.00 | $2,700.00 | $2,700.00 | $2,750.00 | |
| 19 | 66901003 | REG SUB F CON REPORT | 1 | L SUM | $1,300.00 | $2,300.00 | $2,300.00 | $2,750.00 | |
| 20 | 66901006 | REG SUB MON | 30 | CAL DA | $680.00 | $998.00 | $1,000.00 | $1,200.00 | |
| 21 | 67100100 | MOBILIZATION | 1 | L SUM | $585,000.00 | $608,399.00 | $165,000.00 | $760,000.00 | |
| 22 | 70100310 | TRAF CONT-PROT 701421 | 1 | L SUM | $134,000.00 | $1,177,565.00 | $275,000.00 | $200,000.00 | |
| 23 | 70102620 | TR CONT & PROT 701501 | 1 | L SUM | $1.00 | $50.00 | $0.0100 | $0.0100 | |
| 24 | 70102630 | TR CONT & PROT 701601 | 1 | L SUM | $1.00 | $50.00 | $0.0100 | $0.0100 | |
| 25 | 70102635 | TR CONT & PROT 701701 | 1 | L SUM | $1.00 | $50.00 | $0.0100 | $0.0100 | |
| 26 | 70102640 | TR CONT & PROT 701801 | 1 | L SUM | $1.00 | $50.00 | $0.0100 | $0.0100 | |
| 27 | 70300100 | SHORT TERM PAVT MKING | 83,010 | FOOT | $0.0100 | $0.0100 | $2.00 | $1.13 | |
| 28 | 70300150 | SHRT TRM PAVT MK REM | 27,670 | SQ FT | $0.0100 | $0.0100 | $3.00 | $2.00 | |
| 29 | 78009000 | MOD URETH PM LTR-SYM | 805 | SQ FT | $4.75 | $5.00 | $5.00 | $5.50 | |
| 30 | 78009004 | MOD URETH PM LINE 4 | 112,790 | FOOT | $0.6000 | $0.5500 | $0.6000 | $0.6600 | |
| 31 | 78009006 | MOD URETH PM LINE 6 | 5,600 | FOOT | $0.7000 | $0.7500 | $0.7500 | $0.8300 | |
| 32 | 78009008 | MOD URETH PM LINE 8 | 1,550 | FOOT | $0.8000 | $1.65 | $1.65 | $1.82 | |
| 33 | 78009012 | MOD URETH PM LINE 12 | 840 | FOOT | $1.25 | $3.05 | $3.05 | $3.36 | |
| 34 | 78009024 | MOD URETH PM LINE 24 | 490 | FOOT | $4.75 | $5.00 | $5.00 | $5.50 | |
| 35 | 78100100 | RAISED REFL PAVT MKR | 975 | EACH | $38.00 | $30.00 | $33.00 | $36.30 | |
| 36 | 78300200 | RAISED REF PVT MK REM | 975 | EACH | $11.00 | $10.00 | $7.00 | $9.00 | |
| 37 | 85000200 | MAIN EX TR SIG INSTAL | 1 | EACH | $1,800.00 | $1,800.00 | $7,400.00 | $8,102.60 | |
| 38 | 87301805 | ELCBL C SERV 6 2C | 120 | FOOT | $25.33 | $25.33 | $7.00 | $7.70 | |
| 39 | 87301900 | ELCBL C EGRDC 6 1C | 120 | FOOT | $8.70 | $8.70 | $3.50 | $3.85 | |
| 40 | 87800100 | CONC FDN TY A | 4 | FOOT | $812.50 | $812.50 | $700.00 | $770.00 | |
| 41 | 88600100 | DET LOOP T1 | 319 | FOOT | $27.39 | $27.39 | $25.00 | $27.50 | |
| 42 | 89502300 | REM ELCBL FR CON | 287 | FOOT | $1.10 | $1.10 | $4.00 | $4.40 | |
| 43 | 89502375 | REMOV EX TS EQUIP | 1 | EACH | $1,120.00 | $1,120.00 | $1,000.00 | $1,100.00 | |
| 44 | 89502380 | REMOV EX HANDHOLE | 1 | EACH | $1,560.00 | $1,560.00 | $1,500.00 | $1,650.00 |