FAP 0303 22 CR
- Let date
- Friday, February 27, 2026
- Contract
- 62T82 · job page
- District
- District 1
- County
- Lake
- Highway
- Limits
- Project consists of a single culvert removal and replacement includes shoulder widening at the culvert, guardrail removal and replacement and ditch regrading. Project is located on Illinois Route 173 over an unnamed Ditch, 0.5 miles east of Illinois Route 131 in the city of Zion, IL.
- Classification
- A single culvert removal and replacement includes shoulder widening at the culvert, guardrail removal and repl ·
- Project number
Bidders 2
| # | Contractor | Total bid | vs estimate | vs low |
|---|---|---|---|---|
| EE | Engineer's estimate | — | ||
| 1 | Martam Construction Incorporated Low bidder | $1,524,058 | ||
| 2 | Lorig Construction Company | $1,711,138 | +12.3% |
| Seq | Bid code | Description | Qty | Unit | Estimate | #1 Martam Construc… | #2 Lorig Construct… |
|---|---|---|---|---|---|---|---|
| 1 | X0326276 | TEMP LGHT SNGL LN STG | 1 | L SUM | $134,178.72 | $25,000.00 | |
| 2 | X0328048 | SANITARY FORCE MAIN 8 | 486 | FOOT | $206.69 | $390.00 | |
| 3 | X1200276 | REM/DSP FRCMN & WTRMN | 1 | L SUM | $10,075.33 | $9,600.00 | |
| 4 | X5000015 | REM & REIN PIPE CULV | 30 | FOOT | $147.44 | $325.00 | |
| 5 | X5021512 | COFFERDAM TYP 1 IS WW | 2 | EACH | $36,008.33 | $500.00 | |
| 6 | X5504020 | SS D I T2 18 | 25 | FOOT | $356.83 | $275.00 | |
| 7 | X5810103 | MEMB WTRPRF SYS B STR | 89 | SQ YD | $56.00 | $70.00 | |
| 8 | X6700407 | ENGRS FLD OFC TY A D1 | 12 | CAL MO | $5,248.52 | $3,500.00 | |
| 9 | X7010216 | TRAF CONT & PROT SPL | 1 | L SUM | $111,615.64 | $235,000.00 | |
| 10 | X7200061 | TEMP INFO SIGNING | 240 | SQ FT | $16.64 | $17.00 | |
| 11 | X7830050 | RRPM REFLECTOR REMOVL | 73 | EACH | $15.80 | $12.00 | |
| 12 | X7830052 | RRPM REFLECTOR REPLAC | 73 | EACH | $12.48 | $14.00 | |
| 13 | X8900104 | TEMP TR SIGNAL TIMING | 3 | EACH | $2,267.20 | $2,200.00 | |
| 14 | Z0013798 | CONSTRUCTION LAYOUT | 1 | L SUM | $10,337.45 | $75,000.00 | |
| 15 | Z0033020 | LUM SFTY CBL ASSEMBLY | 1 | EACH | $554.32 | $600.00 | |
| 16 | Z0054406 | ROCK FILL - FOUNDATN | 34.8 | CU YD | $125.93 | $250.00 | |
| 17 | Z0076600 | TRAINEES | 500 | HOUR | $0.8000 | $0.8000 | |
| 18 | Z0076604 | TRAINEES TPG | 500 | HOUR | $15.00 | $15.00 | |
| 19 | 20100210 | TREE REMOV OVER 15 | 38 | UNIT | $93.60 | $90.00 | |
| 20 | 20200100 | EARTH EXCAVATION | 824 | CU YD | $51.79 | $60.00 | |
| 21 | 20400800 | FURNISHED EXCAVATION | 460 | CU YD | $44.34 | $60.00 | |
| 22 | 20700220 | POROUS GRAN EMBANK | 90 | CU YD | $81.59 | $200.00 | |
| 23 | 20800150 | TRENCH BACKFILL | 50 | CU YD | $82.69 | $90.00 | |
| 24 | 21001000 | GEOTECH FAB F/GR STAB | 61 | SQ YD | $6.70 | $6.00 | |
| 25 | 21101505 | TOPSOIL EXC & PLAC | 76 | CU YD | $64.65 | $95.00 | |
| 26 | 21101600 | TOPSOIL F & P VAR DP | 140 | SQ YD | $19.40 | $20.00 | |
| 27 | 25000110 | SEEDING CL 1A | 0.03 | ACRE | $16,640.00 | $16,000.00 | |
| 28 | 25000210 | SEEDING CL 2A | 0.25 | ACRE | $6,032.00 | $6,000.00 | |
| 29 | 25000324 | SEEDING CL 5B | 0.25 | ACRE | $6,032.00 | $6,000.00 | |
| 30 | 25000400 | NITROGEN FERT NUTR | 23 | POUND | $2.60 | $3.00 | |
| 31 | 25000500 | PHOSPHORUS FERT NUTR | 23 | POUND | $2.60 | $3.00 | |
| 32 | 25000600 | POTASSIUM FERT NUTR | 23 | POUND | $2.60 | $3.00 | |
| 33 | 25100115 | MULCH METHOD 2 | 0.25 | ACRE | $4,992.00 | $4,800.00 | |
| 34 | 25100630 | EROSION CONTR BLANKET | 2,582 | SQ YD | $1.77 | $1.75 | |
| 35 | 28000250 | TEMP EROS CONTR SEED | 26 | POUND | $10.40 | $10.00 | |
| 36 | 28000305 | TEMP DITCH CHECKS | 235 | FOOT | $16.64 | $16.00 | |
| 37 | 28000400 | PERIMETER EROS BAR | 661 | FOOT | $3.95 | $4.00 | |
| 38 | 28000510 | INLET FILTERS | 1 | EACH | $286.00 | $300.00 | |
| 39 | 28100107 | STONE RIPRAP CL A4 | 117 | SQ YD | $111.49 | $195.00 | |
| 40 | 28200200 | FILTER FABRIC | 117 | SQ YD | $6.89 | $3.50 | |
| 41 | 28300400 | AGGREGATE DITCH | 47 | TON | $131.32 | $71.00 | |
| 42 | 30300001 | AGG SUBGRADE IMPROVE | 25 | CU YD | $70.57 | $180.00 | |
| 43 | 30300112 | AGG SUBGRADE IMPR 12 | 501 | SQ YD | $33.25 | $45.00 | |
| 44 | 40600290 | BIT MATLS TACK CT | 858 | POUND | $0.0100 | $0.0100 | |
| 45 | 40600370 | LONG JOINT SEALANT | 864 | FOOT | $15.85 | $14.00 | |
| 46 | 40603090 | HMA BC IL-19.0 N90 | 76 | TON | $250.25 | $225.00 | |
| 47 | 40604062 | HMA SC IL-9.5 D N70 | 181 | TON | $140.98 | $131.00 | |
| 48 | 44000100 | PAVEMENT REM | 191 | SQ YD | $27.36 | $37.00 | |
| 49 | 44000157 | HMA SURF REM 2 | 1,435 | SQ YD | $9.06 | $8.00 | |
| 50 | 44000500 | COMB CURB GUTTER REM | 309 | FOOT | $8.77 | $21.00 | |
| 51 | 44004000 | PAVED DITCH REMOVAL | 43 | FOOT | $27.96 | $60.00 | |
| 52 | 44004250 | PAVED SHLD REMOVAL | 77 | SQ YD | $33.95 | $42.00 | |
| 53 | 48101498 | AGGREGATE SHLDS B 4 | 199 | SQ YD | $25.94 | $30.00 | |
| 54 | 48203037 | HMA SHOULDERS 10 | 268 | SQ YD | $105.88 | $100.00 | |
| 55 | 48203100 | HMA SHOULDERS | 12 | TON | $198.16 | $175.00 | |
| 56 | 50100100 | REM EXIST STRUCT | 2 | EACH | $27,741.49 | $100.00 | |
| 57 | 50105220 | PIPE CULVERT REMOV | 15 | FOOT | $110.51 | $35.00 | |
| 58 | 50200100 | STRUCTURE EXCAVATION | 153 | CU YD | $86.30 | $130.00 | |
| 59 | 50200450 | REM/DISP UNS MATL-STR | 52 | CU YD | $86.30 | $150.00 | |
| 60 | 50300300 | PROTECTIVE COAT | 6 | SQ YD | $68.75 | $5.00 | |
| 61 | 50800205 | REINF BARS, EPOXY CTD | 19,920 | POUND | $2.14 | $2.00 | |
| 62 | 50800515 | BAR SPLICERS | 68 | EACH | $39.03 | $60.00 | |
| 63 | 52200010 | TEMP SHT PILING | 1,070 | SQ FT | $58.44 | $50.00 | |
| 64 | 54003000 | CONC BOX CUL | 95.5 | CU YD | $2,051.94 | $2,400.00 | |
| 65 | 54248510 | CONCRETE COLLAR | 1 | CU YD | $4,438.04 | $1,600.00 | |
| 66 | 55100500 | STORM SEWER REM 12 | 2 | FOOT | $110.62 | $30.00 | |
| 67 | 55100900 | STORM SEWER REM 18 | 13 | FOOT | $110.74 | $33.00 | |
| 68 | 60100060 | CONC HDWL FOR P DRAIN | 4 | EACH | $441.33 | $1,100.00 | |
| 69 | 60108204 | PIPE UNDERDR T 2 4 | 418 | FOOT | $29.61 | $58.00 | |
| 70 | 60500060 | REMOV INLETS | 1 | EACH | $509.39 | $500.00 | |
| 71 | 60600095 | CLASS SI CONC OUTLET | 1.8 | CU YD | $1,228.12 | $1,700.00 | |
| 72 | 63000001 | SPBGR TY A 6FT POSTS | 250 | FOOT | $33.68 | $45.00 | |
| 73 | 63000360 | LSG OV CUL 18'9" SPAN | 88 | FOOT | $46.08 | $41.00 | |
| 74 | 63100167 | TR BAR TRM T1 SPL TAN | 4 | EACH | $3,994.34 | $3,800.00 | |
| 75 | 63200310 | GUARDRAIL REMOV | 271 | FOOT | $16.96 | $10.00 | |
| 76 | 66900200 | NON SPL WASTE DISPOSL | 565 | CU YD | $80.24 | $90.00 | |
| 77 | 66900530 | SOIL DISPOSAL ANALY | 1 | EACH | $1,508.00 | $1,500.00 | |
| 78 | 66901001 | REG SUB P-CONST PLAN | 1 | L SUM | $3,224.00 | $3,200.00 | |
| 79 | 66901003 | REG SUB F CON REPORT | 1 | L SUM | $1,248.00 | $1,200.00 | |
| 80 | 66901006 | REG SUB MON | 30 | CAL DA | $707.20 | $850.00 | |
| 81 | 67100100 | MOBILIZATION | 1 | L SUM | $91,443.47 | $95,000.00 | |
| 82 | 70107025 | CHANGEABLE MESSAGE SN | 158 | CAL DA | $39.52 | $38.00 | |
| 83 | 70300150 | SHRT TRM PAVT MK REM | 5,264 | SQ FT | $0.4100 | $0.4000 | |
| 84 | 70307100 | TEMP PVT MK LTR & SYM T4 TAPE | 41 | SQ FT | $8.32 | $8.00 | |
| 85 | 70307120 | TEMP PVT MK L4 T4 TAPE | 7,077 | FOOT | $1.40 | $1.40 | |
| 86 | 70307130 | TEMP PVT MK L6 T4 TAPE | 91 | FOOT | $2.08 | $2.00 | |
| 87 | 70307160 | TEMP PVT MK L12 T4 TAPE | 369 | FOOT | $4.16 | $4.00 | |
| 88 | 70307210 | TEMP PVT MK L24 T4 TAPE | 155 | FOOT | $8.11 | $8.00 | |
| 89 | 70400100 | TEMP CONC BARRIER | 662.5 | FOOT | $37.98 | $34.00 | |
| 90 | 70400200 | REL TEMP CONC BARRIER | 587.5 | FOOT | $13.16 | $7.00 | |
| 91 | 70600260 | IMP ATTN TEMP FRN TL3 | 2 | EACH | $5,203.27 | $4,600.00 | |
| 92 | 70600322 | IMP ATTN REL FRN TL2 | 2 | EACH | $3,705.67 | $2,300.00 | |
| 93 | 78000100 | THPL PVT MK LTR & SYM | 124 | SQ FT | $6.76 | $7.00 | |
| 94 | 78000200 | THPL PVT MK LINE 4 | 5,360 | FOOT | $1.30 | $1.25 | |
| 95 | 78000400 | THPL PVT MK LINE 6 | 965 | FOOT | $1.72 | $1.75 | |
| 96 | 78000600 | THPL PVT MK LINE 12 | 107 | FOOT | $3.33 | $3.50 | |
| 97 | 78000650 | THPL PVT MK LINE 24 | 73 | FOOT | $6.76 | $7.00 | |
| 98 | 78100100 | RAISED REFL PAVT MKR | 4 | EACH | $1,144.00 | $1,100.00 | |
| 99 | 78200005 | GRDRAIL REF TYPE A | 8 | EACH | $14.62 | $12.00 | |
| 100 | 78300200 | RAISED REF PVT MK REM | 4 | EACH | $16.99 | $10.00 | |
| 101 | 78300202 | PVT MKG REM WTR BLAST | 2,295 | SQ FT | $1.64 | $1.60 | |
| 102 | 89000100 | TEMP TR SIG INSTALL | 1 | EACH | $28,100.80 | $100,000.00 |