123RS-7;(123RA)RS
- Let date
- Friday, April 24, 2026
- Contract
- 68K20 · job page
- District
- District 4
- County
- Stark
- Highway
- Limits
- 6.45 miles of resurfacing from the southern city limit of Bradford to the west leg of IL 17. Milling and resurfacing and minor drainage improvements at the IL 40 Camp Grove Rest Area located 0.6 mile north of the west leg of IL 17 are also included.
- Classification
- ·
- Project number
Bidders 1
| # | Contractor | Total bid | vs estimate | vs low |
|---|---|---|---|---|
| EE | Engineer's estimate | — | ||
| 1 | Advanced Asphalt Company Low bidder | $2,839,793 |
| Seq | Bid code | Description | Qty | Unit | Estimate | #1 Advanced Asphal… |
|---|---|---|---|---|---|---|
| 1 | XZ013798 | CONSTR STA LAYOUT | 1 | L SUM | $16,776.76 | |
| 2 | X0326899 | SOLAR-POWER FB AS CMP | 1 | EACH | $9,355.16 | |
| 3 | X6061005 | CONC CURB TB SPL | 60 | FOOT | $59.04 | |
| 4 | X6350204 | LINEAR DELIN PANELS 4 | 16 | EACH | $91.66 | |
| 5 | Z0001002 | GDRL AGG EROS CONT | 61 | TON | $111.46 | |
| 6 | Z0004542 | HMA REMOVAL SPL | 1,891 | SQ YD | $22.60 | |
| 7 | Z0076600 | TRAINEES | 1,500 | HOUR | $0.8000 | |
| 8 | Z0076604 | TRAINEES TPG | 1,500 | HOUR | $15.00 | |
| 9 | 20200100 | EARTH EXCAVATION | 769 | CU YD | $80.00 | |
| 10 | 20800150 | TRENCH BACKFILL | 34 | CU YD | $95.00 | |
| 11 | 21101615 | TOPSOIL F & P 4 | 1,190 | SQ YD | $22.50 | |
| 12 | 25100630 | EROSION CONTR BLANKET | 1,497 | SQ YD | $10.00 | |
| 13 | 28000250 | TEMP EROS CONTR SEED | 31 | POUND | $30.00 | |
| 14 | 28000305 | TEMP DITCH CHECKS | 2 | FOOT | $300.00 | |
| 15 | 28000500 | INLET & PIPE PROTECT | 3 | EACH | $1,000.00 | |
| 16 | 28100207 | STONE RIPRAP CL A4 | 27 | TON | $300.00 | |
| 17 | 28200200 | FILTER FABRIC | 41 | SQ YD | $22.91 | |
| 18 | 31101000 | SUB GRAN MAT B | 193 | TON | $76.80 | |
| 19 | 40600275 | BIT MATLS PR CT | 827 | POUND | $1.76 | |
| 20 | 40600295 | P BIT MATLS TACK CT | 77,995 | POUND | $1.01 | |
| 21 | 40600405 | MATL TRANSFER DEVICE | 9,094 | TON | $5.29 | |
| 22 | 40600982 | HMA SURF REM BUTT JT | 1,517 | SQ YD | $29.46 | |
| 23 | 40600990 | TEMPORARY RAMP | 324 | SQ YD | $46.96 | |
| 24 | 40603205 | P HMA BC IL-9.5 N50 | 282 | TON | $195.00 | |
| 25 | 40604160 | P HMA SC IL-9.5 D N50 | 8,812 | TON | $140.00 | |
| 26 | 40800050 | INCIDENTAL HMA SURF | 89 | TON | $280.25 | |
| 27 | 44000152 | HMA SURF REM 3/4 | 98,727 | SQ YD | $3.00 | |
| 28 | 44000157 | HMA SURF REM 2 | 2,508 | SQ YD | $12.50 | |
| 29 | 44000164 | HMA SURF REM 3 3/4 | 368 | SQ YD | $30.00 | |
| 30 | 44000600 | SIDEWALK REM | 39 | SQ FT | $26.68 | |
| 31 | 44004000 | PAVED DITCH REMOVAL | 124 | FOOT | $24.21 | |
| 32 | 44004250 | PAVED SHLD REMOVAL | 41 | SQ YD | $72.85 | |
| 33 | 44201717 | CL D PATCH T2 6 | 12 | SQ YD | $383.33 | |
| 34 | 44201723 | CL D PATCH T4 6 | 27 | SQ YD | $330.92 | |
| 35 | 48101200 | AGGREGATE SHLDS B | 2,759 | TON | $42.48 | |
| 36 | 48203100 | HMA SHOULDERS | 123 | TON | $479.50 | |
| 37 | 50105220 | PIPE CULVERT REMOV | 144 | FOOT | $35.00 | |
| 38 | 542D0220 | P CUL CL D 1 15 | 60 | FOOT | $50.00 | |
| 39 | 542D0226 | P CUL CL D 1 21 | 106 | FOOT | $65.00 | |
| 40 | 54262715 | METAL FL END SEC 15" | 2 | EACH | $500.00 | |
| 41 | 54262721 | METAL FL END SEC 21" | 4 | EACH | $600.00 | |
| 42 | 60615400 | PAVED DITCH TA-15 | 10 | FOOT | $200.00 | |
| 43 | 63000001 | SPBGR TY A 6FT POSTS | 625 | FOOT | $51.33 | |
| 44 | 63100085 | TRAF BAR TERM T6 | 4 | EACH | $4,882.28 | |
| 45 | 63100169 | TR BAR TRM T1 SPL FLR | 4 | EACH | $4,705.08 | |
| 46 | 63200310 | GUARDRAIL REMOV | 933 | FOOT | $9.17 | |
| 47 | 64200214 | SINUSOIDAL RUM STP 14 | 34,165 | FOOT | $0.3900 | |
| 48 | 67100100 | MOBILIZATION | 1 | L SUM | $160,000.00 | |
| 49 | 70100450 | TRAF CONT-PROT 701201 | 1 | L SUM | $2,302.19 | |
| 50 | 70100460 | TRAF CONT-PROT 701306 | 1 | L SUM | $21,361.98 | |
| 51 | 70107025 | CHANGEABLE MESSAGE SN | 28 | CAL DA | $61.11 | |
| 52 | 70300100 | SHORT TERM PAVT MKING | 3,428 | FOOT | $6.59 | |
| 53 | 70300150 | SHRT TRM PAVT MK REM | 1,143 | SQ FT | $3.47 | |
| 54 | 70300211 | TEMP PVT MK LTR & SYM PAINT | 31 | SQ FT | $3.67 | |
| 55 | 70300221 | TEMP PVT MK LINE 4 - PAINT | 22,480 | FOOT | $0.1700 | |
| 56 | 70300241 | TEMP PVT MK LINE 6 - PAINT | 68,852 | FOOT | $0.2700 | |
| 57 | 70300251 | TEMP PVT MK LINE 8 - PAINT | 348 | FOOT | $0.4300 | |
| 58 | 70300261 | TEMP PVT MK LINE 12 - PAINT | 227 | FOOT | $0.5900 | |
| 59 | 70300281 | TEMP PVT MK LINE 24 - PAINT | 31 | FOOT | $3.97 | |
| 60 | 72000100 | SIGN PANEL T1 | 2 | SQ FT | $91.66 | |
| 61 | 72501000 | TERMINAL MARKER - DA | 4 | EACH | $61.11 | |
| 62 | 72800100 | TELES STL SIN SUPPORT | 14 | FOOT | $46.44 | |
| 63 | 78009000 | MOD URETH PM LTR-SYM | 34 | SQ FT | $5.50 | |
| 64 | 78009004 | MOD URETH PM LINE 4 | 22,726 | FOOT | $0.9400 | |
| 65 | 78009006 | MOD URETH PM LINE 6 | 70,866 | FOOT | $1.42 | |
| 66 | 78009008 | MOD URETH PM LINE 8 | 348 | FOOT | $1.88 | |
| 67 | 78009012 | MOD URETH PM LINE 12 | 227 | FOOT | $2.82 | |
| 68 | 78009024 | MOD URETH PM LINE 24 | 31 | FOOT | $5.80 | |
| 69 | 78011000 | GRV RCSD PM LTR & SYM | 31 | SQ FT | $7.64 | |
| 70 | 78011025 | GRV RCSD PVT MRKG 5 | 22,480 | FOOT | $0.4900 | |
| 71 | 78011035 | GRV RCSD PVT MRKG 7 | 68,852 | FOOT | $0.7300 | |
| 72 | 78011045 | GRV RCSD PVT MRKG 9 | 348 | FOOT | $1.10 | |
| 73 | 78011065 | GRV RCSD PVT MRKG 13 | 227 | FOOT | $3.67 | |
| 74 | 78011125 | GRV RCSD PVT MRKG 25 | 31 | FOOT | $7.33 | |
| 75 | 78100100 | RAISED REFL PAVT MKR | 427 | EACH | $45.85 | |
| 76 | 78300200 | RAISED REF PVT MK REM | 427 | EACH | $20.11 |