IDOT Jobs

All dates · 51 jobs · —
★ My Jobs

Filtered by: County: Sangamon Clear all

51 jobs · — estimated

ExcelCSV
Let date Contract / PPS County / Division Highway Description Estimate Status Added Low bidder
Dec 13, 2024 72122 SangamonDistrict 6 1.7 miles of reconstruction, milling and resurfacing, ADA improvements and accessible pedestrian traffic signals on Dirksen Parkway in Springfield, from 0.1 miles south of Peoria Road to north of Northfield Drive. — Executed Nov 25 New Illinois Valley Paving, a div of UCM, Inc. $5,572,391 ·
Dec 13, 2024 72M81 SangamonDistrict 6 Pavement patching, resurfacing, HMA shoulders, aggregate shoulders, grading and shaping ditches, rumble strips, and bridge repairs to SN 084-0111 on I-55 from 0.7 miles south of IL 104 to 0.5 miles north of Horse Farm Road/Old Route 66 at the Glenarm Interchange and on Horse Farm Road/Old Route 66 from 0.4 miles west to 1 mile east of I-55. — Executed Nov 25 New Illinois Valley Paving, a div of UCM, Inc. $17,664,190 ·
Dec 13, 2024 93671 SangamonDistrict 6 Construction of two structures: Iron Bridge Road over the Union Pacific Railroad, and the Union Pacific Railroad over Woodside Road. Work includes; pedestrian truss bridge over Woodside Road, reconstruction of the signalized intersection of Iron Bridge and Woodside, and the relocation of the Interurban Trail. — Executed Nov 25 New
Jan 17, 2025 72023 SangamonDistrict 6 Bridge painting on SN 084-0052 carrying Old US 36 over the Sangamon River, southwest of Riverton. — Executed Nov 25 New Civil Coatings and Construction Inc. $862,345 ·
Jan 17, 2025 72515 SangamonDistrict 6 Patching on I-55 from the Montgomery County line to the Logan County line and on I-72 the Morgan County line to the Macon County line. — Executed Nov 25 New Kinney Contractors, Inc. $1,049,013 ·
Jan 17, 2025 72609 SangamonDistrict 6 Riprap installation at SN 084-0152 and SN 084-0153 carrying I-72 over the Sangamon River, 3.5 miles east of I-55. — Executed Nov 25 New Kinney Contractors, Inc. $130,080 ·
Jan 17, 2025 72650 SangamonDistrict 6 Bridge painting on SN 084-0163 and SN 084-0164 carrying I-72 over Long Point Slough, 1.5 miles east of Illiopolis. — Executed Nov 25 New ERA-Valdivia Contractors, Inc. $259,209 ·
Jan 17, 2025 72770 LoganSangamonDistrict 6 Cured-in-place pipe liner at various locations on I-55 and the I-55 Frontage Road in Logan and Sangamon Counties. — Executed Nov 25 New Hoerr Construction, Inc. $561,200 ·
Jan 17, 2025 72L31 SangamonDistrict 6 1 mile of pavement resurfacing and fog sealing of shoulders on IL 124 from the Andrew Road Junction west of Sherman to Business I-55 in Sherman. — Executed Nov 25 New P. H. Broughton & Sons, Inc. $272,390 ·
Jan 17, 2025 93773 SangamonDistrict 6 Construction of a two-span underpass structure to carry the Union Pacific Railroad over North Grand Avenue and construction of a two-span overpass structure to carry North Grand Avenue over the Illinois and Midland, and Norfolk Southern Railroads. This contract includes the reconstruction and re-alignment of North Grand Avenue from 9th Street to 19th Street in Springfield. — Executed Nov 25 New Freesen, a div of UCM, Inc. $99,697,564 ·
Mar 7, 2025 72255 SangamonDistrict 6 6 miles of resurfacing with drainage improvements on IL 123 from 0.4 miles east of IL 29, east of Athens, to West Outer Road, 0.3 miles west of I-55. — Executed Nov 25 New P. H. Broughton & Sons, Inc. $2,490,973 ·
Mar 7, 2025 72321 SangamonDistrict 6 3 miles of resurfacing on IL 4 (Veterans Parkway) from 0.2 miles north of Greenbriar Drive to 0.1 miles south of Prairie Crossing Drive in Springfield. — Executed Nov 25 New Illinois Valley Paving, a div of UCM, Inc. $8,892,709 ·
Mar 7, 2025 72651 SangamonDistrict 6 Bridge painting on SN 084-0145 carrying Farmingdale Road over I-72, 2.6 miles west of Wabash Avenue, west of Springfield. — Executed Nov 25 New Three Star Painting, Inc. $210,000 ·
Mar 7, 2025 72759 SangamonDistrict 6 0.3 miles of pavement reconstruction, ADA improvements and traffic signal upgrades on 5th Street (Business I-55) from Spruce Street to Ash Street in Springfield. — Executed Nov 25 New Kinney Contractors, Inc. $5,348,364 ·
Mar 7, 2025 72D99 SangamonDistrict 6 4.9 miles of resurfacing on Old US 36 from 0.2 miles west of Loami Bates Road to 0.7 miles south of I-72. — Executed Nov 25 New Illinois Valley Paving, a div of UCM, Inc. $2,068,376 ·
Apr 25, 2025 72040 SangamonDistrict 6 1.9 miles of patching, HMA surface removal, HMA overlay, curb and gutter replacement and sidewalk ramp improvements on 9th Street (Peoria Road) from north of Madison Street to south of Sangamon Avenue. — Executed Nov 25 New Truman L. Flatt & Sons Co., Inc. $1,821,344 ·
Jun 13, 2025 72634 SangamonDistrict 6 Cured-in-place pipe lines, and pipe culvert removal and replacement on Veterans Parkway (Rt 4) in Springfield — Executed Nov 25 New J.C. Dillon, Inc. $121,416 ·
Jun 13, 2025 72C26 SangamonDistrict 6 Building removal at 3701 6th Street Frontage Road West in Springfield. — Executed Nov 25 New CSD Environmental Services, Inc. $74,707 ·
Jun 13, 2025 72F42 SangamonDistrict 6 2.8 miles of resurfacing and ADA improvements on Wabash Ave from west of Robbins Road to Macarthur Boulevard, Stanford Avenue from Macarthur Boulevard to 0.1 miles east of Macarthur Boulevard, and Macarthur Boulevard from 0.1 miles north to 0.1 miles south of Wabash Avenue. — Executed Nov 25 New Illinois Valley Paving, a div of UCM, Inc. $4,908,504 ·
Jun 13, 2025 93832 SangamonDistrict 6 Sidewalk replacement at various locations in Auburn. — Executed Nov 25 New Otto Baum Company, Inc. $223,575 ·
Aug 1, 2025 72958 SangamonDistrict 6 Expansion joint seal replacement on SN 084-0152 and SN 084-0153 carrying I-72 over the Sangamon River, 3.5 miles east of I-55. — Executed Nov 25 New Otto Baum Company, Inc. $68,200 ·
Aug 1, 2025 72975 SangamonDistrict 6 Chip sealing on various routes in Sangamon County. — Executed Nov 25 New Illinois Valley Paving, a div of UCM, Inc. $325,622 ·
Aug 1, 2025 93833 SangamonDistrict 6 Extension of MaArthur Boulevard between Woodside Road and Knights Recreation Drive. Includes full-depth HMA, resurfacing, curb and gutter, pipe culverts, storm sewer, lighting, and signage. — Executed Nov 25 New Illinois Valley Paving, a div of UCM, Inc. $6,690,296 ·
Sep 19, 2025 72416 SangamonDistrict 6 7.5 miles of crack and joint sealing on I-55 from north of the Glenarm interchange to 0.2 miles north of Southwind Road. — Executed Nov 25 New Complete Asphalt Service Co. $247,563 ·
Nov 7, 2025 72508 SangamonDistrict 6 Tree removal and vegetation removal along I-55 from 11th Street to Stevenson Drive in Springfield. — Executed Nov 25 New Homer Tree Service, Inc. $190,542 ·
Nov 7, 2025 72688 SangamonDistrict 6 Tree clearing and ditch grading along the IDOT access road near the Lincolnshire Subdivision, northwest of I-72 and Chatham Road in Springfield. — Executed Nov 25 New Freesen, a div of UCM, Inc. $97,470 ·
Nov 7, 2025 72A62 SangamonDistrict 6 Bridge removal on I-55 / I-72, 0.1 miles south of Stevenson Drive. — Executed Nov 25 New William Charles Construction Company, LLC $1,014,537 ·
Jan 16, 2026 72433 SangamonDistrict 6 2.7 miles of resurfacing on Andrew Road from 0.1 miles east of IL 29 to west of IL 124, west of Sherman. — Executed Nov 25 New P. H. Broughton & Sons, Inc. $1,115,449 ·
Jan 16, 2026 72715 SangamonDistrict 6 Substructure repairs on SN 084-0073 and SN 084-0178 carrying Dirksen Parkway over NS Railroad and IC Railroad in Springfield. — Executed Nov 25 New William Charles Construction Company, LLC $329,894 ·
Jan 16, 2026 72729 SangamonDistrict 6 Bridge painting on SN 084-0127 and SN 084-0127 carrying I-72 over the NS Railroad, 1.2 miles east of Wabash Avenue in Springfield. — Executed Nov 25 New Three Star Painting, Inc. $409,200 ·
Jan 16, 2026 72978 SangamonDistrict 6 Bridge deck overlay on SN 084-0192 carrying IL 104 over Sugar Creek, 1.2 miles east of Auburn. — Executed Nov 25 New Sangamo Construction Company $674,724 ·
Jan 16, 2026 72979 SangamonDistrict 6 Bridge deck patching and substructure repairs on SN 084-0102 carrying Ridgely Road over I-55, 0.5 miles south of Sangamon Avenue in Springfield. — Executed Nov 25 New Path Construction Company, Inc. $398,054 ·
Jan 16, 2026 72G53 SangamonDistrict 6 Patching on I-55 from the Montgomery County line to the Logan County line, I-72 from the Morgan County line to the Macon County line and IL 29 from Dirksen Parkway in Springfield to 0.2 miles east of Cardinal Hill in Rochester. — Executed Nov 25 New Kinney Contractors, Inc. $1,797,824 ·
Jan 16, 2026 72K24 LoganSangamonDistrict 6 Bridge deck sealing at various locations in Logan and Sangamon Counties. — Executed Nov 25 New All States Painting, Inc. $306,990 ·
Jan 16, 2026 72K80 SangamonDistrict 6 Painting bridges on I-72 at Curran Road and Cantrell Road. (SN 084-0146 and SN 084-0161) — Executed Nov 25 New Civil Coatings and Construction Inc. $382,075 ·
Jan 16, 2026 93839 SangamonDistrict 6 Construction of left turn lanes at the intersections of Carpenter Street and 5th and 6th Streets in Springfield. Includes; HMA resurfacing, widening, traffic signals, sidewalks, ADA ramps, and storm sewer. — Executed Nov 25 New Kinney Contractors, Inc. $2,799,987 ·
Feb 27, 2026 72546 SangamonDistrict 6 Installation of cure-in-place pipe liners at 12 locations on I-72 in Sangamon County. — Executed Nov 25 New J.C. Dillon, Inc. $555,264 ·
Feb 27, 2026 72989 SangamonDistrict 6 1.9 miles of resurfacing on Dirksen Parkway from Stevenson Drive to south of Wide Track Drive. — Executed Nov 25 New Illinois Valley Paving, a div of UCM, Inc. $3,597,405 ·
Feb 27, 2026 72C96 SangamonDistrict 6 Patching and resurfacing on I-55 from 2.8 miles south of IL 123 in Williamsville to the Logan County line. — Executed Nov 25 New Illinois Valley Paving, a div of UCM, Inc. $25,964,194 ·
Apr 24, 2026 72348 SangamonDistrict 6 5.7 miles of resurfacing on IL 54 from 0.2 miles east of Prairie School Road to north of Bissell Road, northeast of Springfield. — Executed Nov 25 New P. H. Broughton & Sons, Inc. $4,462,601 ·
Apr 24, 2026 72503 SangamonDistrict 6 Drainage improvements at the intersection of Old US 36 and Mt. Pulaski Road. — Executed Nov 25 New Phoenix Corporation of the Quad Cities $97,322 ·
Apr 24, 2026 72638 SangamonDistrict 6 0.1 miles of resurfacing on the IL 29 spur west of Hilltop Road; east of Springfield. — Executed Nov 25 New Truman L. Flatt & Sons Co., Inc. $65,135 ·
Apr 24, 2026 72741 SangamonDistrict 6 Drainage improvements on Old US 36 west of Illiopolis. — Executed Nov 25 New P. H. Broughton & Sons, Inc. $313,859 ·
Apr 24, 2026 72N43 SangamonDistrict 6 Expansion of the Emergency Vehicle Operations Course (EVOC) at the Illinois State Police Training Facility in Pawnee includes site grading, paving, and associated amenities. — Executed Nov 25 New Baxmeyer Construction, Inc. $13,405,307 ·
Jun 12, 2026 72491 SangamonDistrict 6 Patching, curb and gutter replacement, HMA removal and overlay, guardrail replacement and traffic signal replacement on I-55 Business from 0.2 miles north of Fancy Creek in Sherman to 0.2 miles north of Dirksen Parkway in Springfield. — Executed Nov 25 New Illinois Valley Paving, a div of UCM, Inc. $10,156,787 ·
Jun 12, 2026 72547 MenardSangamonDistrict 6 5.9 miles of resurfacing on IL 29 / IL 123 from 0.1 miles west of the Menard / Sangamon County line to the IL 29 / 123 junction and from the IL 123 junction to 0.1 miles south of Andrew Road. — Executed Nov 25 New P. H. Broughton & Sons, Inc. $2,868,316 ·
Jun 12, 2026 72E76 SangamonDistrict 6 Structural steel repairs on SN 084-0106 and 084-0111 over I-55 at the Divernon and Glenarm interchanges. — Executed Nov 25 New William Charles Construction Company, LLC $185,585 ·
Jul 31, 2026 72E86 SangamonDistrict 6 Resurfacing on Stevenson Drive from east of Adloff Lane to east of I-55 northbound ramps in Springfield. — Executed Nov 25 New Truman L. Flatt & Sons Co., Inc. $286,492 ·
Jul 31, 2026 72J00 MacoupinSangamonDistrict 6 9.32 Miles of crack and joint Sealing on IL 4 from 0.3 miles south of IL 104 in Auburn to north of George Street in Virden and on IL 4 from 0.3 miles southwest of IL 29 (J David Jones Pkwy) to 0.2 miles north of Washington Street. — Executed Nov 25 New Freehill Asphalt, Inc. $92,224 ·
Jul 31, 2026 92621 SangamonDistrict 6 3.1 miles of additional lanes, noise wall, bridge demolition and pedestrian overpass on IL 97 / Jefferson Street from east of Lincoln Trail / North Old Covered Bridge Lane to 0.2 miles west of IL 4 (Veterans Parkway) in Springfield. — Executed Nov 25 New Illinois Valley Paving, a div of UCM, Inc. $36,568,681 ·
Sep 18, 2026 72222 SangamonDistrict 6 Bridge deck overlay, bridge repairs, and bridge painting on SN 084-0207 carrying IL 29 over the Sangamon River, 2.7 miles north of IL 4 in Springfield. — Executed Nov 25 New
1–51 of 51

Lettings: IDOT Transportation Bulletin (Notice of Letting and Contract Detail pages). Planned projects: IDOT Multi-Year Highway Improvement Program (roadway, structure and spot layers on the IDOT open data hub), listed by program year, not let date. "Added" is the first date Bid Potato saw the job. Always confirm against the official proposal before bidding.