Filtered by: County: Sangamon Clear all
| Let date | Contract / PPS | County / Division | Highway | Description | Estimate | Status | Low bidder | |
|---|---|---|---|---|---|---|---|---|
| Dec 13, 2024 | 72122 | SangamonDistrict 6 | 1.7 miles of reconstruction, milling and resurfacing, ADA improvements and accessible pedestrian traffic signals on Dirksen Parkway in Springfield, from 0.1 miles south of Peoria Road to north of Northfield Drive. | — | Executed | Illinois Valley Paving, a div of UCM, Inc. $5,572,391 · | ||
| Dec 13, 2024 | 72M81 | SangamonDistrict 6 | Pavement patching, resurfacing, HMA shoulders, aggregate shoulders, grading and shaping ditches, rumble strips, and bridge repairs to SN 084-0111 on I-55 from 0.7 miles south of IL 104 to 0.5 miles north of Horse Farm Road/Old Route 66 at the Glenarm Interchange and on Horse Farm Road/Old Route 66 from 0.4 miles west to 1 mile east of I-55. | — | Executed | Illinois Valley Paving, a div of UCM, Inc. $17,664,190 · | ||
| Dec 13, 2024 | 93671 | SangamonDistrict 6 | Construction of two structures: Iron Bridge Road over the Union Pacific Railroad, and the Union Pacific Railroad over Woodside Road. Work includes; pedestrian truss bridge over Woodside Road, reconstruction of the signalized intersection of Iron Bridge and Woodside, and the relocation of the Interurban Trail. | — | Executed | |||
| Jan 17, 2025 | 72023 | SangamonDistrict 6 | Bridge painting on SN 084-0052 carrying Old US 36 over the Sangamon River, southwest of Riverton. | — | Executed | Civil Coatings and Construction Inc. $862,345 · | ||
| Jan 17, 2025 | 72515 | SangamonDistrict 6 | Patching on I-55 from the Montgomery County line to the Logan County line and on I-72 the Morgan County line to the Macon County line. | — | Executed | Kinney Contractors, Inc. $1,049,013 · | ||
| Jan 17, 2025 | 72609 | SangamonDistrict 6 | Riprap installation at SN 084-0152 and SN 084-0153 carrying I-72 over the Sangamon River, 3.5 miles east of I-55. | — | Executed | Kinney Contractors, Inc. $130,080 · | ||
| Jan 17, 2025 | 72650 | SangamonDistrict 6 | Bridge painting on SN 084-0163 and SN 084-0164 carrying I-72 over Long Point Slough, 1.5 miles east of Illiopolis. | — | Executed | ERA-Valdivia Contractors, Inc. $259,209 · | ||
| Jan 17, 2025 | 72770 | LoganSangamonDistrict 6 | Cured-in-place pipe liner at various locations on I-55 and the I-55 Frontage Road in Logan and Sangamon Counties. | — | Executed | Hoerr Construction, Inc. $561,200 · | ||
| Jan 17, 2025 | 72L31 | SangamonDistrict 6 | 1 mile of pavement resurfacing and fog sealing of shoulders on IL 124 from the Andrew Road Junction west of Sherman to Business I-55 in Sherman. | — | Executed | P. H. Broughton & Sons, Inc. $272,390 · | ||
| Jan 17, 2025 | 93773 | SangamonDistrict 6 | Construction of a two-span underpass structure to carry the Union Pacific Railroad over North Grand Avenue and construction of a two-span overpass structure to carry North Grand Avenue over the Illinois and Midland, and Norfolk Southern Railroads. This contract includes the reconstruction and re-alignment of North Grand Avenue from 9th Street to 19th Street in Springfield. | — | Executed | Freesen, a div of UCM, Inc. $99,697,564 · | ||
| Mar 7, 2025 | 72255 | SangamonDistrict 6 | 6 miles of resurfacing with drainage improvements on IL 123 from 0.4 miles east of IL 29, east of Athens, to West Outer Road, 0.3 miles west of I-55. | — | Executed | P. H. Broughton & Sons, Inc. $2,490,973 · | ||
| Mar 7, 2025 | 72321 | SangamonDistrict 6 | 3 miles of resurfacing on IL 4 (Veterans Parkway) from 0.2 miles north of Greenbriar Drive to 0.1 miles south of Prairie Crossing Drive in Springfield. | — | Executed | Illinois Valley Paving, a div of UCM, Inc. $8,892,709 · | ||
| Mar 7, 2025 | 72651 | SangamonDistrict 6 | Bridge painting on SN 084-0145 carrying Farmingdale Road over I-72, 2.6 miles west of Wabash Avenue, west of Springfield. | — | Executed | Three Star Painting, Inc. $210,000 · | ||
| Mar 7, 2025 | 72759 | SangamonDistrict 6 | 0.3 miles of pavement reconstruction, ADA improvements and traffic signal upgrades on 5th Street (Business I-55) from Spruce Street to Ash Street in Springfield. | — | Executed | Kinney Contractors, Inc. $5,348,364 · | ||
| Mar 7, 2025 | 72D99 | SangamonDistrict 6 | 4.9 miles of resurfacing on Old US 36 from 0.2 miles west of Loami Bates Road to 0.7 miles south of I-72. | — | Executed | Illinois Valley Paving, a div of UCM, Inc. $2,068,376 · | ||
| Apr 25, 2025 | 72040 | SangamonDistrict 6 | 1.9 miles of patching, HMA surface removal, HMA overlay, curb and gutter replacement and sidewalk ramp improvements on 9th Street (Peoria Road) from north of Madison Street to south of Sangamon Avenue. | — | Executed | Truman L. Flatt & Sons Co., Inc. $1,821,344 · | ||
| Jun 13, 2025 | 72634 | SangamonDistrict 6 | Cured-in-place pipe lines, and pipe culvert removal and replacement on Veterans Parkway (Rt 4) in Springfield | — | Executed | J.C. Dillon, Inc. $121,416 · | ||
| Jun 13, 2025 | 72C26 | SangamonDistrict 6 | Building removal at 3701 6th Street Frontage Road West in Springfield. | — | Executed | CSD Environmental Services, Inc. $74,707 · | ||
| Jun 13, 2025 | 72F42 | SangamonDistrict 6 | 2.8 miles of resurfacing and ADA improvements on Wabash Ave from west of Robbins Road to Macarthur Boulevard, Stanford Avenue from Macarthur Boulevard to 0.1 miles east of Macarthur Boulevard, and Macarthur Boulevard from 0.1 miles north to 0.1 miles south of Wabash Avenue. | — | Executed | Illinois Valley Paving, a div of UCM, Inc. $4,908,504 · | ||
| Jun 13, 2025 | 93832 | SangamonDistrict 6 | Sidewalk replacement at various locations in Auburn. | — | Executed | Otto Baum Company, Inc. $223,575 · | ||
| Aug 1, 2025 | 72958 | SangamonDistrict 6 | Expansion joint seal replacement on SN 084-0152 and SN 084-0153 carrying I-72 over the Sangamon River, 3.5 miles east of I-55. | — | Executed | Otto Baum Company, Inc. $68,200 · | ||
| Aug 1, 2025 | 72975 | SangamonDistrict 6 | Chip sealing on various routes in Sangamon County. | — | Executed | Illinois Valley Paving, a div of UCM, Inc. $325,622 · | ||
| Aug 1, 2025 | 93833 | SangamonDistrict 6 | Extension of MaArthur Boulevard between Woodside Road and Knights Recreation Drive. Includes full-depth HMA, resurfacing, curb and gutter, pipe culverts, storm sewer, lighting, and signage. | — | Executed | Illinois Valley Paving, a div of UCM, Inc. $6,690,296 · | ||
| Sep 19, 2025 | 72416 | SangamonDistrict 6 | 7.5 miles of crack and joint sealing on I-55 from north of the Glenarm interchange to 0.2 miles north of Southwind Road. | — | Executed | Complete Asphalt Service Co. $247,563 · | ||
| Nov 7, 2025 | 72508 | SangamonDistrict 6 | Tree removal and vegetation removal along I-55 from 11th Street to Stevenson Drive in Springfield. | — | Executed | Homer Tree Service, Inc. $190,542 · | ||
| Nov 7, 2025 | 72688 | SangamonDistrict 6 | Tree clearing and ditch grading along the IDOT access road near the Lincolnshire Subdivision, northwest of I-72 and Chatham Road in Springfield. | — | Executed | Freesen, a div of UCM, Inc. $97,470 · | ||
| Nov 7, 2025 | 72A62 | SangamonDistrict 6 | Bridge removal on I-55 / I-72, 0.1 miles south of Stevenson Drive. | — | Executed | William Charles Construction Company, LLC $1,014,537 · | ||
| Jan 16, 2026 | 72433 | SangamonDistrict 6 | 2.7 miles of resurfacing on Andrew Road from 0.1 miles east of IL 29 to west of IL 124, west of Sherman. | — | Executed | P. H. Broughton & Sons, Inc. $1,115,449 · | ||
| Jan 16, 2026 | 72715 | SangamonDistrict 6 | Substructure repairs on SN 084-0073 and SN 084-0178 carrying Dirksen Parkway over NS Railroad and IC Railroad in Springfield. | — | Executed | William Charles Construction Company, LLC $329,894 · | ||
| Jan 16, 2026 | 72729 | SangamonDistrict 6 | Bridge painting on SN 084-0127 and SN 084-0127 carrying I-72 over the NS Railroad, 1.2 miles east of Wabash Avenue in Springfield. | — | Executed | Three Star Painting, Inc. $409,200 · | ||
| Jan 16, 2026 | 72978 | SangamonDistrict 6 | Bridge deck overlay on SN 084-0192 carrying IL 104 over Sugar Creek, 1.2 miles east of Auburn. | — | Executed | Sangamo Construction Company $674,724 · | ||
| Jan 16, 2026 | 72979 | SangamonDistrict 6 | Bridge deck patching and substructure repairs on SN 084-0102 carrying Ridgely Road over I-55, 0.5 miles south of Sangamon Avenue in Springfield. | — | Executed | Path Construction Company, Inc. $398,054 · | ||
| Jan 16, 2026 | 72G53 | SangamonDistrict 6 | Patching on I-55 from the Montgomery County line to the Logan County line, I-72 from the Morgan County line to the Macon County line and IL 29 from Dirksen Parkway in Springfield to 0.2 miles east of Cardinal Hill in Rochester. | — | Executed | Kinney Contractors, Inc. $1,797,824 · | ||
| Jan 16, 2026 | 72K24 | LoganSangamonDistrict 6 | Bridge deck sealing at various locations in Logan and Sangamon Counties. | — | Executed | All States Painting, Inc. $306,990 · | ||
| Jan 16, 2026 | 72K80 | SangamonDistrict 6 | Painting bridges on I-72 at Curran Road and Cantrell Road. (SN 084-0146 and SN 084-0161) | — | Executed | Civil Coatings and Construction Inc. $382,075 · | ||
| Jan 16, 2026 | 93839 | SangamonDistrict 6 | Construction of left turn lanes at the intersections of Carpenter Street and 5th and 6th Streets in Springfield. Includes; HMA resurfacing, widening, traffic signals, sidewalks, ADA ramps, and storm sewer. | — | Executed | Kinney Contractors, Inc. $2,799,987 · | ||
| Feb 27, 2026 | 72546 | SangamonDistrict 6 | Installation of cure-in-place pipe liners at 12 locations on I-72 in Sangamon County. | — | Executed | J.C. Dillon, Inc. $555,264 · | ||
| Feb 27, 2026 | 72989 | SangamonDistrict 6 | 1.9 miles of resurfacing on Dirksen Parkway from Stevenson Drive to south of Wide Track Drive. | — | Executed | Illinois Valley Paving, a div of UCM, Inc. $3,597,405 · | ||
| Feb 27, 2026 | 72C96 | SangamonDistrict 6 | Patching and resurfacing on I-55 from 2.8 miles south of IL 123 in Williamsville to the Logan County line. | — | Executed | Illinois Valley Paving, a div of UCM, Inc. $25,964,194 · | ||
| Apr 24, 2026 | 72348 | SangamonDistrict 6 | 5.7 miles of resurfacing on IL 54 from 0.2 miles east of Prairie School Road to north of Bissell Road, northeast of Springfield. | — | Executed | P. H. Broughton & Sons, Inc. $4,462,601 · | ||
| Apr 24, 2026 | 72503 | SangamonDistrict 6 | Drainage improvements at the intersection of Old US 36 and Mt. Pulaski Road. | — | Executed | Phoenix Corporation of the Quad Cities $97,322 · | ||
| Apr 24, 2026 | 72638 | SangamonDistrict 6 | 0.1 miles of resurfacing on the IL 29 spur west of Hilltop Road; east of Springfield. | — | Executed | Truman L. Flatt & Sons Co., Inc. $65,135 · | ||
| Apr 24, 2026 | 72741 | SangamonDistrict 6 | Drainage improvements on Old US 36 west of Illiopolis. | — | Executed | P. H. Broughton & Sons, Inc. $313,859 · | ||
| Apr 24, 2026 | 72N43 | SangamonDistrict 6 | Expansion of the Emergency Vehicle Operations Course (EVOC) at the Illinois State Police Training Facility in Pawnee includes site grading, paving, and associated amenities. | — | Executed | Baxmeyer Construction, Inc. $13,405,307 · | ||
| Jun 12, 2026 | 72491 | SangamonDistrict 6 | Patching, curb and gutter replacement, HMA removal and overlay, guardrail replacement and traffic signal replacement on I-55 Business from 0.2 miles north of Fancy Creek in Sherman to 0.2 miles north of Dirksen Parkway in Springfield. | — | Executed | Illinois Valley Paving, a div of UCM, Inc. $10,156,787 · | ||
| Jun 12, 2026 | 72547 | MenardSangamonDistrict 6 | 5.9 miles of resurfacing on IL 29 / IL 123 from 0.1 miles west of the Menard / Sangamon County line to the IL 29 / 123 junction and from the IL 123 junction to 0.1 miles south of Andrew Road. | — | Executed | P. H. Broughton & Sons, Inc. $2,868,316 · | ||
| Jun 12, 2026 | 72E76 | SangamonDistrict 6 | Structural steel repairs on SN 084-0106 and 084-0111 over I-55 at the Divernon and Glenarm interchanges. | — | Executed | William Charles Construction Company, LLC $185,585 · | ||
| Jul 31, 2026 | 72E86 | SangamonDistrict 6 | Resurfacing on Stevenson Drive from east of Adloff Lane to east of I-55 northbound ramps in Springfield. | — | Executed | Truman L. Flatt & Sons Co., Inc. $286,492 · | ||
| Jul 31, 2026 | 72J00 | MacoupinSangamonDistrict 6 | 9.32 Miles of crack and joint Sealing on IL 4 from 0.3 miles south of IL 104 in Auburn to north of George Street in Virden and on IL 4 from 0.3 miles southwest of IL 29 (J David Jones Pkwy) to 0.2 miles north of Washington Street. | — | Executed | Freehill Asphalt, Inc. $92,224 · | ||
| Jul 31, 2026 | 92621 | SangamonDistrict 6 | 3.1 miles of additional lanes, noise wall, bridge demolition and pedestrian overpass on IL 97 / Jefferson Street from east of Lincoln Trail / North Old Covered Bridge Lane to 0.2 miles west of IL 4 (Veterans Parkway) in Springfield. | — | Executed | Illinois Valley Paving, a div of UCM, Inc. $36,568,681 · | ||
| Sep 18, 2026 | 72222 | SangamonDistrict 6 | Bridge deck overlay, bridge repairs, and bridge painting on SN 084-0207 carrying IL 29 over the Sangamon River, 2.7 miles north of IL 4 in Springfield. | — | Executed |
1–51 of 51
Lettings: IDOT Transportation Bulletin (Notice of Letting and Contract Detail pages). Planned projects: IDOT Multi-Year Highway Improvement Program (roadway, structure and spot layers on the IDOT open data hub), listed by program year, not let date. "Added" is the first date Bid Potato saw the job. Always confirm against the official proposal before bidding.