05-00164-03-FP
- Let date
- Friday, August 1, 2025
- Contract
- 93833 · job page
- District
- District 6
- County
- Sangamon
- Highway
- Limits
- Extension of MaArthur Boulevard between Woodside Road and Knights Recreation Drive. Includes full-depth HMA, resurfacing, curb and gutter, pipe culverts, storm sewer, lighting, and signage.
- Classification
- ·
- Project number
Bidders 2
| # | Contractor | Total bid | vs estimate | vs low |
|---|---|---|---|---|
| EE | Engineer's estimate | — | ||
| 1 | Illinois Valley Paving, a div of UCM, Inc. Low bidder | $6,690,296 | ||
| 2 | Truman L. Flatt & Sons Co., Inc. | $7,722,589 | +15.4% |
| Seq | Bid code | Description | Qty | Unit | Estimate | #1 Illinois Valley… | #2 Truman L. Flatt… |
|---|---|---|---|---|---|---|---|
| 1 | XX009453 | STORM SEW CL B 1 8 | 211 | FOOT | $67.67 | $70.80 | |
| 2 | X0326899 | SOLAR-POWER FB AS CMP | 1 | EACH | $2,524.50 | $4,410.00 | |
| 3 | X6020084 | MANHOLE SPECIAL | 1 | EACH | $15,180.43 | $11,134.61 | |
| 4 | X6060300 | CONC MED TSB6.24 SPL | 6,624 | SQ FT | $15.44 | $25.50 | |
| 5 | X7010216 | TRAF CONT & PROT SPL | 1 | L SUM | $65,182.88 | $4,946.82 | |
| 6 | X7240207 | REM EX SIGN COMPL | 4 | EACH | $322.19 | $118.75 | |
| 7 | Z0013798 | CONSTRUCTION LAYOUT | 1 | L SUM | $76,381.35 | $97,650.00 | |
| 8 | Z0076600 | TRAINEES | 3,000 | HOUR | $0.8000 | $0.8000 | |
| 9 | Z0076604 | TRAINEES TPG | 3,000 | HOUR | $15.00 | $15.00 | |
| 10 | 20100500 | TREE REMOV ACRES | 0.5 | ACRE | $26,181.90 | $25,179.00 | |
| 11 | 20200100 | EARTH EXCAVATION | 8,055 | CU YD | $12.02 | $19.48 | |
| 12 | 20400800 | FURNISHED EXCAVATION | 52,135 | CU YD | $8.02 | $20.22 | |
| 13 | 20800150 | TRENCH BACKFILL | 318.3 | CU YD | $147.91 | $76.06 | |
| 14 | 21101505 | TOPSOIL EXC & PLAC | 20,215 | CU YD | $8.94 | $17.08 | |
| 15 | 25000200 | SEEDING CL 2 | 9.25 | ACRE | $2,040.00 | $6,037.42 | |
| 16 | 25000300 | SEEDING CL 3 | 0.25 | ACRE | $5,100.00 | $6,037.40 | |
| 17 | 25000400 | NITROGEN FERT NUTR | 939 | POUND | $2.04 | $1.84 | |
| 18 | 25000500 | PHOSPHORUS FERT NUTR | 939 | POUND | $2.04 | $3.00 | |
| 19 | 25000600 | POTASSIUM FERT NUTR | 939 | POUND | $2.04 | $3.35 | |
| 20 | 25000700 | AGR GROUND LIMESTONE | 21.8 | TON | $102.00 | $315.00 | |
| 21 | 25100115 | MULCH METHOD 2 | 9.5 | ACRE | $1,020.00 | $4,024.94 | |
| 22 | 25100630 | EROSION CONTR BLANKET | 15,318 | SQ YD | $1.53 | $1.89 | |
| 23 | 25200110 | SODDING SALT TOLERANT | 6,743 | SQ YD | $19.38 | $12.76 | |
| 24 | 25200200 | SUPPLE WATERING | 337 | UNIT | $204.00 | $0.0100 | |
| 25 | 28000250 | TEMP EROS CONTR SEED | 931.25 | POUND | $5.10 | $4.99 | |
| 26 | 28000305 | TEMP DITCH CHECKS | 1,410 | FOOT | $11.61 | $9.56 | |
| 27 | 28000400 | PERIMETER EROS BAR | 11,729 | FOOT | $2.24 | $5.10 | |
| 28 | 28000500 | INLET & PIPE PROTECT | 8 | EACH | $381.29 | $231.16 | |
| 29 | 28100127 | STONE RIPRAP CL B4 | 1,444 | SQ YD | $61.59 | $88.59 | |
| 30 | 28100701 | STONE DUMP RIP CL A1 | 1,444 | SQ YD | $29.21 | $28.17 | |
| 31 | 28200200 | FILTER FABRIC | 1,444 | SQ YD | $5.56 | $5.45 | |
| 32 | 30200650 | PROCESS MOD SOIL 12 | 38,842 | SQ YD | $4.60 | $3.84 | |
| 33 | 30201500 | LIME | 1,036 | TON | $163.20 | $168.00 | |
| 34 | 31101191 | SUB GRAN MAT B 3 | 38,842 | SQ YD | $6.95 | $6.99 | |
| 35 | 40200700 | AGG SURF CSE A 8 | 925 | SQ YD | $18.37 | $28.14 | |
| 36 | 40600290 | BIT MATLS TACK CT | 13,998 | POUND | $0.9700 | $0.7000 | |
| 37 | 40600370 | LONG JOINT SEALANT | 24,021 | FOOT | $2.93 | $3.89 | |
| 38 | 40600405 | MATL TRANSFER DEVICE | 16,041 | TON | $0.0100 | $4.40 | |
| 39 | 40604160 | P HMA SC IL-9.5 D N50 | 31 | TON | $126.04 | $157.60 | |
| 40 | 40701866 | HMA PAVT FD 9 1/4 | 30,967 | SQ YD | $62.14 | $64.09 | |
| 41 | 42001300 | PROTECTIVE COAT | 6,766 | SQ YD | $0.0100 | $0.0100 | |
| 42 | 42300400 | PCC DRIVEWAY PAVT 8 | 269 | SQ YD | $123.19 | $104.69 | |
| 43 | 44000157 | HMA SURF REM 2 | 293 | SQ YD | $16.67 | $10.91 | |
| 44 | 44000500 | COMB CURB GUTTER REM | 48 | FOOT | $18.71 | $22.53 | |
| 45 | 542A0241 | P CUL CL A 1 36 | 418 | FOOT | $188.91 | $206.30 | |
| 46 | 542A1105 | P CUL CL A 2 60 | 179 | FOOT | $425.12 | $383.23 | |
| 47 | 542C0223 | P CUL CL C 1 18 | 152 | FOOT | $110.45 | $141.23 | |
| 48 | 542C0229 | P CUL CL C 1 24 | 46 | FOOT | $117.12 | $115.01 | |
| 49 | 54213657 | PRC FLAR END SEC 12 | 91 | EACH | $1,533.15 | $1,250.24 | |
| 50 | 54213681 | PRC FLAR END SEC 36 | 6 | EACH | $3,514.61 | $2,788.80 | |
| 51 | 54215460 | CIP RC END SEC 60 | 2 | EACH | $21,314.05 | $29,190.00 | |
| 52 | 54262718 | METAL FL END SEC 18" | 6 | EACH | $428.48 | $394.64 | |
| 53 | 54262724 | METAL FL END SEC 24" | 2 | EACH | $768.58 | $645.16 | |
| 54 | 550A0050 | STORM SEW CL A 1 12 | 2,035 | FOOT | $106.48 | $93.88 | |
| 55 | 60100060 | CONC HDWL FOR P DRAIN | 6 | EACH | $1,148.09 | $447.18 | |
| 56 | 60100915 | PIPE DRAINS 6 | 120 | FOOT | $42.97 | $43.82 | |
| 57 | 60100925 | PIPE DRAINS 8 | 120 | FOOT | $45.71 | $47.18 | |
| 58 | 60100945 | PIPE DRAINS 12 | 120 | FOOT | $62.19 | $69.12 | |
| 59 | 60108104 | PIPE UNDERDR T 1 4 | 11,196 | FOOT | $10.29 | $15.04 | |
| 60 | 60218500 | MAN TA 4 DIA T3F&G | 5 | EACH | $5,378.08 | $4,426.52 | |
| 61 | 60219300 | MAN TA 4 DIA T11F&G | 1 | EACH | $6,290.52 | $4,273.76 | |
| 62 | 60235700 | INLETS TA T3F&G | 98 | EACH | $2,017.96 | $2,197.87 | |
| 63 | 60236800 | INLETS TA T11F&G | 4 | EACH | $2,472.72 | $2,179.23 | |
| 64 | 60240220 | INLETS TB T3F&G | 2 | EACH | $3,576.72 | $2,862.15 | |
| 65 | 60604400 | COMB CC&G TB6.18 | 48 | FOOT | $113.86 | $103.56 | |
| 66 | 60605000 | COMB CC&G TY B-6.24 | 20,766.5 | FOOT | $44.00 | $42.84 | |
| 67 | 60618300 | CONC MEDIAN SURF 4 | 592 | SQ FT | $15.94 | $8.99 | |
| 68 | 61000050 | CONC THRUST BLOCKS | 6 | EACH | $934.97 | $561.60 | |
| 69 | 61100500 | EXPLOR TRENCH 52 | 1,120 | FOOT | $3.62 | $12.65 | |
| 70 | 61100605 | MISC CONCRETE | 3 | CU YD | $1,716.84 | $1,516.03 | |
| 71 | 61101007 | STORM SEW PROT A 6 | 400 | FOOT | $55.08 | $50.67 | |
| 72 | 61101009 | STORM SEW PROT A 8 | 400 | FOOT | $58.34 | $50.19 | |
| 73 | 61101017 | STORM SEW PROT A 15 | 550 | FOOT | $73.28 | $55.88 | |
| 74 | 61101020 | STORM SEW PROT A 18 | 200 | FOOT | $92.98 | $53.68 | |
| 75 | 66700205 | PERM SURV MKRS T1 | 5 | EACH | $910.91 | $776.83 | |
| 76 | 67100100 | MOBILIZATION | 1 | L SUM | $282,029.13 | $291,706.77 | |
| 77 | 70102630 | TR CONT & PROT 701601 | 1 | L SUM | $0.0100 | $13,373.13 | |
| 78 | 70102635 | TR CONT & PROT 701701 | 1 | L SUM | $0.0100 | $4,299.18 | |
| 79 | 72000100 | SIGN PANEL T1 | 118.9 | SQ FT | $42.33 | $37.86 | |
| 80 | 72000200 | SIGN PANEL T2 | 10 | SQ FT | $22.44 | $57.94 | |
| 81 | 72800100 | TELES STL SIN SUPPORT | 36 | FOOT | $15.81 | $26.22 | |
| 82 | 73000100 | WOOD SIN SUPPORT | 272 | FOOT | $28.51 | $19.98 | |
| 83 | 73100100 | BASE TEL STL SIN SUPP | 3 | EACH | $331.50 | $562.31 | |
| 84 | 78001100 | PT PVT MK LTRS & SYMB | 162 | SQ FT | $3.06 | $3.15 | |
| 85 | 78001120 | PAINT PVT MK LINE 5 | 31,210 | FOOT | $0.2600 | $0.2600 | |
| 86 | 78001130 | PAINT PVT MK LINE 6 | 1,581 | FOOT | $0.3700 | $0.3800 | |
| 87 | 78001150 | PAINT PVT MK LINE 12 | 296 | FOOT | $0.7700 | $0.7900 | |
| 88 | 78001180 | PAINT PVT MK LINE 24 | 175 | FOOT | $4.08 | $4.20 | |
| 89 | 78100100 | RAISED REFL PAVT MKR | 246 | EACH | $37.18 | $38.27 | |
| 90 | 78300200 | RAISED REF PVT MK REM | 59 | EACH | $10.79 | $18.76 | |
| 91 | 78300202 | PVT MKG REM WTR BLAST | 3,973 | SQ FT | $1.53 | $1.58 | |
| 92 | 81028550 | UNDRGRD C IM 2 | 148 | FOOT | $78.03 | $80.33 | |
| 93 | 81603000 | UD 2#8 #8G XLPUSE 3/4 | 316 | FOOT | $37.03 | $38.12 | |
| 94 | 81702110 | EC C XLP USE 1C 10 | 451 | FOOT | $5.81 | $5.99 | |
| 95 | 82110005 | LUM LED RDWY E | 3 | EACH | $948.60 | $976.50 | |
| 96 | 82110008 | LUM LED RDWY H | 4 | EACH | $948.60 | $976.50 | |
| 97 | 82500330 | LT CONT PEDM 240V 60 | 1 | EACH | $26,010.00 | $26,775.00 | |
| 98 | 83008600 | LT P A 40MH 15MA | 2 | EACH | $8,262.00 | $8,505.00 | |
| 99 | 83009500 | LT P A 45MH 12MA | 3 | EACH | $8,017.20 | $8,253.00 | |
| 100 | 83600356 | LP F M 15BC 8 5/8X6 | 3 | EACH | $2,019.60 | $2,079.00 | |
| 101 | 83800650 | BKWY DEV COU SS SCRN | 20 | EACH | $211.14 | $217.35 |