Filtered by: County: Franklin Clear all
| Let date | Contract / PPS | County / Division | Highway | Description | Estimate | Status | Low bidder | |
|---|---|---|---|---|---|---|---|---|
| Jan 19, 2018 | 78577 | FranklinJeffersonDistrict 9 | Crack sealing on 6 structures on I-57 in Franklin and Jefferson Counties. | — | Executed | E. T. Simonds Construction Company $110,873 · | ||
| Jan 19, 2018 | 78614 | FranklinJeffersonDistrict 9 | Cleaning and painting 9 bridges on I-57. | — | Executed | ERA-Valdivia Contractors, Inc. $1,214,294 · | ||
| Jan 19, 2018 | 78620 | FranklinDistrict 9 | Addition of a non-automatic transfer switch and associated conduit and cabling at the West Frankfort pump station in West Frankfort. | — | Executed | F. W. Electric, Inc. $29,450 · | ||
| Mar 9, 2018 | 98820 | FranklinDistrict 9 | 2.5 miles of milling, resurfacing, culvert replacement, full depth HMA shoulders, earthwork, guardrails and tree removal on IL 37 from Wastena Street south of Benton to Yellow Banks Road. | — | Executed | E. T. Simonds Construction Company $2,770,067 · | ||
| Mar 9, 2018 | 99595 | FranklinDistrict 9 | Resurfacing CJ10 from .5 mile west of Cemetary Road to IL 37, | — | Executed | E. T. Simonds Construction Company $375,421 · | ||
| Jun 15, 2018 | 78670 | FranklinMassacUnionDistrict 9 | Tree removal on I-57 southbound in Franklin County, at the I-57 northbound Trial of Tears Rest Area in Union County, and at the I-24 Fort Massac Rest Area in Massac County. | — | Executed | Endrizzi Contracting, Inc $81,184 · | ||
| Jun 15, 2018 | 99597 | FranklinDistrict 9 | Resurfacing and crushed stone shoulders on FAS Route 874 (Logan Road) from IL 34 to IL 149. | — | Executed | Southern Illinois Asphalt Co., Inc. $1,082,766 · | ||
| Nov 9, 2018 | 78363 | FranklinWilliamsonDistrict 9 | Expand approximately 4.4 miles of I-57 to add an additional lane in each direction, install a median barrier, sresurface existing lanes, update pavement markings, upgrade guardrails, and install raised relectors and rumble strip. | — | Executed | E. T. Simonds Construction Company $14,359,766 · | ||
| Jan 18, 2019 | 78658 | FranklinDistrict 9 | 0.66 miles of HMA partial depth patching over existing PCC pavement on IL 149 from Ken Grey Boulevard to Joiner Street | — | Executed | E. T. Simonds Construction Company $134,883 · | ||
| Jan 18, 2019 | 78659 | FranklinDistrict 9 | 5.6 miles of replacing aggregate shoulder with a 2' safety shoulder consisting of 8" HMA on IL 14 from Mt. Zion Road to Ewing Road. | — | Executed | E. T. Simonds Construction Company $534,970 · | ||
| Jun 14, 2019 | 78698 | FranklinDistrict 9 | 1.9 miles of patching, milling and resurfacing at 2 locations: 1) IL 14 from Court Street to Glen Street in West City, 2)IL 14/37 from Bond Street to the Square in Benton. | — | Executed | E. T. Simonds Construction Company $1,671,585 · | ||
| Jun 14, 2019 | 78706 | FranklinDistrict 9 | 5.4 miles of milling, resurfacing and ADA Sidewalk improvements on IL 149 from Ziegler to West Frankfort. | — | Executed | E. T. Simonds Construction Company $1,328,449 · | ||
| Jun 14, 2019 | 78728 | FranklinJeffersonDistrict 9 | Patching and resurfacing on I-57 from 1 mile north of the West Frankfort interchange (MP 66) to Bonnie (MP 87.4). | — | Executed | E. T. Simonds Construction Company $4,645,456 · | ||
| Jun 14, 2019 | 99622 | FranklinDistrict 9 | Resurfacing and aggregate shoulders on Rend City Road from Rend Lake Dam Road to IL 14. | — | Executed | E. T. Simonds Construction Company $871,427 · | ||
| Jul 12, 2019 | 78608 | FranklinWilliamsonDistrict 9 | 2.6 miles of resurfacing on IL 148 from Maple Street in Zeigler to 0.8 miles south of Franklin/Williamson County line. | — | Executed | Southern Illinois Asphalt Co., Inc. $881,036 · | ||
| Sep 20, 2019 | 78631 | FranklinDistrict 9 | ADDITION OF A NEW LANE IN EACH DIRECTION, INSTALL A MEDIAN BARRIER AND UPGRADE GUARDRAIL ON A 3.2 MILE STRETCH OF I-57 FROM SOUTH OF THE COUNTRY CLUB ROAD OVERPASS TO MILE POST 66. | — | Executed | E. T. Simonds Construction Company $20,637,943 · | ||
| Jul 31, 2020 | 78769 | FranklinDistrict 9 | 1.8 miles of HMA surface removal, HMA resurfacing, patching and ADA ramp h reconstruction on IL 149 in West Frankfort, from IL 37 to the east corp limits near Horrell Street. | — | Executed | E. T. Simonds Construction Company $1,443,396 · | ||
| Nov 6, 2020 | 78481 | FranklinDistrict 9 | 0.64 miles of PCC replacement, HMA resurfacing, new curb and gutter and inlets; sidewalk and multi-use path will be replaced and/or constructed the length of the project on IL 149 in West Frankfort. | — | Executed | Samron Midwest Contracting, Inc. $2,556,842 · | ||
| Mar 5, 2021 | 78336 | FranklinDistrict 9 | Removal and replacement of a box culvert (SN 028-7029) carrying IL 34 over a drainage ditch, 5.5 miles east of IL 37 in Benton. | — | Executed | Sierra Bravo Contractors, LLC $137,877 · | ||
| Apr 23, 2021 | 78819 | FranklinDistrict 9 | 6 miles of pcc pavement, milling, surfacing, HMA shoulders, aggregate shoulders and patching on IL 148 from one mile south of IL 154 to IL 14. | — | Executed | Samron Midwest Contracting, Inc. $1,928,223 · | ||
| Jun 11, 2021 | 78812 | FranklinWilliamsonDistrict 9 | Retrofitting ADA ramps, relocating and installing pedestrian push buttons and signal heads at the intersection of IL 149 and Jefferson Street in West Frankfort and the intersections of IL 37 and 4th Street, Broadway Boulevard, and 8th Street in Johnston City. | — | Executed | Samron Midwest Contracting, Inc. $192,459 · | ||
| Jun 11, 2021 | 99664 | FranklinDistrict 9 | Resurface South Thompsonville Road from IL 34 to the Williamson County Line. | — | Executed | E. T. Simonds Construction Company $989,256 · | ||
| Jul 30, 2021 | 78656 | FranklinDistrict 9 | 9 miles of lane addition, median barrier installation and resurfacing existing lanes of I-57 from mile post 66 to Marcum Branch. | — | Executed | E. T. Simonds Construction Company $67,611,531 · | ||
| Sep 17, 2021 | 78503 | FranklinDistrict 9 | Conversion of the wye intersection of IL 149 and IL 184 to a roundabout intersection. | — | Executed | E. T. Simonds Construction Company $1,777,808 · | ||
| Sep 17, 2021 | 78848 | FranklinUnionWilliamsonDistrict 9 | Bridge deck repairs on SN 100-0069 carrying IL 148 over Crab Orchard Lake, 2.8 miles south of IL 13; SN 091-0064 carrying IL 127 over Lingle Creek, 0.3 miles north of Mill Creek; SN 091-0067 carrying IL 127 over Mill Creek, 0.5 miles 0.5 miles north of Mill Creek; SN 028-0037 carrying IL 149 over Big Muddy River, 1.6 miles east of Ziegler. | — | Executed | E. T. Simonds Construction Company $1,177,173 · | ||
| Sep 17, 2021 | 78898 | FranklinDistrict 9 | 5.4 miles of patching, HMA surface removal and resurfacing, safety shoulders and guardrail removal and replacement on IL 154 from near the rail crossing in Sesser to near Fitzgerrell Park Drive. | — | Executed | E. T. Simonds Construction Company $4,066,957 · | ||
| Apr 29, 2022 | 46931 | FranklinDistrict 9 | Resurfacing the parking lot and drive, pavement widening, asphalt seal coating and pavement marking at the IDNR Region V Headquarters in Benton. | — | Executed | Lake Contracting, Inc. $239,183 · | ||
| Jun 17, 2022 | 78897 | FranklinDistrict 9 | 1 mile of HMA resurfacing and ADA improvements on IL 34 from Benton Square to Brown Street. | — | Executed | Samron Midwest Contracting, Inc. $1,048,828 · | ||
| Jun 17, 2022 | 78951 | FranklinDistrict 9 | Patching at the northbound and southbound rest areas on I-57 near Rend Lake. | — | Executed | E. T. Simonds Construction Company $702,322 · | ||
| Jun 17, 2022 | 99682 | FranklinDistrict 9 | Resurface Creek Nation Blacktop from IL 184 to IL 148. | — | Executed | Samron Midwest Contracting, Inc. $974,794 · | ||
| Aug 5, 2022 | 78956 | FranklinJeffersonDistrict 9 | Patching, milling and resurfacing on I-57 from 1.5 miles south of IL 154 to 1.25 miles north of the Campground Road overpass bridge. | — | Executed | E. T. Simonds Construction Company $1,169,133 · | ||
| Nov 18, 2022 | 78893 | FranklinDistrict 9 | Replacement of 5 box culverts on IL 34 between Benton and Thompsonville. | — | Executed | Sierra Bravo Contractors, LLC $1,395,537 · | ||
| Nov 18, 2022 | 78930 | FranklinDistrict 9 | Joint reconstruction, hydro-scarification with microsilica concrete overlay, bearing replacement and approach Proposed improvements consist of joint reconstruction, hydro-scarification with microsilica concrete overlay, bearing replacement and approach slab repair on SN 028-0063, W. Webster St. over 1-57 in Franklin County. | — | Executed | E. T. Simonds Construction Company $453,453 · | ||
| Nov 18, 2022 | 78958 | FranklinDistrict 9 | Replacement of the pumps, piping, back-up and electrical controls of the pump station along I-57 at the West Frankfort interchange. | — | Active | Haier Plumbing and Heating, Inc. $3,343,253 · | ||
| Nov 18, 2022 | 78962 | FranklinDistrict 9 | Replacement of the sanitary sewer lift station and grinder, electrical service, alarm system, driveway pavement and water service at northbound I-57 Rend Lake Rest Area, 2.4 miles north of the IL 14 / Benton interchange. | — | Active | Lake Contracting, Inc. $434,024 · | ||
| Nov 18, 2022 | 99671 | FranklinDistrict 9 | .55 miles of PCC and HMA pavement road reconstruction, concrete curb and gutter, and storm sewer construction on Wastena Street from IL 37 to South McLeansboro Street in Benton. | — | Executed | Samron Midwest Contracting, Inc. $1,598,362 · | ||
| Jan 20, 2023 | 78778 | FranklinDistrict 9 | 1.5 miles of milling, rubbilizing and resurfacing on IL 148 from Ziegler-Royalton School to north of Yellow Banks Road. | — | Executed | Samron Midwest Contracting, Inc. $2,185,355 · | ||
| Mar 10, 2023 | 78953 | FranklinHamiltonDistrict 9 | Scour repair on SN 028-0040 carrying IL 149 over Tilley Creek, 3.4 miles west of IL 34; and scour repair on SN 033-0016 carrying IL 142 over Bear Creek, 1.8 miles south of IL 14. | — | Executed | E. T. Simonds Construction Company $176,175 · | ||
| Mar 10, 2023 | 99690 | FranklinDistrict 9 | Resurfacing Log Cabin Road from the Jefferson County Line to Ewing Road. | — | Executed | E. T. Simonds Construction Company $967,116 · | ||
| Jun 16, 2023 | 46932 | FranklinDistrict 9 | Parking lot resurfacing, sealing, striping, ADA sidewalk improvements, lighting and signing at the Wayne Fitzgerrell State Recreation Area. | — | Executed | E. T. Simonds Construction Company $1,974,520 · | ||
| Jun 16, 2023 | 78915 | FranklinDistrict 9 | Replacement of two structures on IL 149: SN 028-7061 in Royalton and SN 028-7078 east of West Frankfort. | — | Executed | Sierra Bravo Contractors, LLC $864,428 · | ||
| Aug 4, 2023 | 78814 | FranklinDistrict 9 | Conversion of I-57 and IL 149 ramp terminals into roundabouts, pavement pavement reconstruction and bridge modifications in West Frankfort. | — | Rejected | Samron Midwest Contracting, Inc. $6,389,347 · | ||
| Aug 4, 2023 | 78944 | FranklinDistrict 9 | 0.78 miles of resurfacing on IL 149 from Orient Road to Ken Gray Boulevard in West Frankfort. | — | Executed | E. T. Simonds Construction Company $544,594 · | ||
| Mar 8, 2024 | 78997 | FranklinDistrict 9 | Adding a 5- concrete wearing surface on 2 structures carrying IL 34 over a creek, approximately 2.5 miles east of Benton. (SN 028-0044 and 028-0045) | — | Executed | Samron Midwest Contracting, Inc. $731,731 · | ||
| Mar 8, 2024 | 78A45 | FranklinDistrict 9 | 5.7 miles of HMA surface removal, binder and surface course, HMA shoulders, aggregate shoulders and patching on IL 14 from IL 148 in Christopher to North Court Street in West City. | — | Executed | E. T. Simonds Construction Company $2,185,980 · | ||
| Mar 8, 2024 | 78A47 | FranklinPerryDistrict 9 | 10.9 miles of patching, milling and resurfacing on IL 154 from US 51 north of DuQuoin to IL 148 south of Sesser. | — | Executed | E. T. Simonds Construction Company $5,053,409 · | ||
| Apr 26, 2024 | 78A62 | FranklinJeffersonDistrict 9 | 9.8 miles of patching on I-57 from 2.5 miles south of IL 154 to Atchison Creek, south of Bonnie. | — | Executed | E. T. Simonds Construction Company $1,659,506 · | ||
| Jun 14, 2024 | 78961 | FranklinDistrict 9 | 4.7 miles of resurfacing on IL 149 from the Williamson County line to 1.5 miles east of IL 184 in Royalton. | — | Executed | Samron Midwest Contracting, Inc. $2,919,919 · | ||
| Jun 14, 2024 | 99732 | FranklinDistrict 9 | Resurface 21 Mine Road from the Jefferson County Line to IL 154. | — | Executed | E. T. Simonds Construction Company $712,185 · | ||
| Aug 2, 2024 | 78927 | FranklinDistrict 9 | 0.38 miles of resurfacing and ADA ramps on IL 154 from IL 148 to the BNSF Railroad in Sesser. | — | Executed | Samron Midwest Contracting, Inc. $469,469 · | ||
| Nov 8, 2024 | 78A88 | FranklinDistrict 9 | Mowing and application of herbicide to eliminate invasive species and interseeding at the Sugar Camp Creek Wetland Mitigation Site. | — | Executed | Mayer Landscaping, Inc. $555,883 · | ||
| Jan 17, 2025 | 78884 | FranklinJeffersonDistrict 9 | 9.7 miles of additional lane installation on I-57 from 2.5 miles south of IL 154 to Atchison Creek. Includes replacement of SN 028-0011 and SN 0028-0013. | — | Executed | E. T. Simonds Construction Company $104,503,286 · | ||
| Apr 25, 2025 | 78B14 | FranklinDistrict 9 | 5.7 miles of HMA surface removal, resurfacing, patching and shoulder work on IL 184 from IL 14 in Mulkeytown to IL 149 north of Royalton. | — | Executed | E. T. Simonds Construction Company $1,642,992 · | ||
| Jun 13, 2025 | 78786 | FranklinDistrict 9 | 2.3 miles of resurfacing on IL 154 from IL 37 to Fitzgerrell Park Road. Also includes replacement of SN 028-0052 over Rend Lake and construction of a multi-use path. | — | Executed | E. T. Simonds Construction Company $20,462,811 · | ||
| Jun 13, 2025 | 78943 | FranklinDistrict 9 | 10.5 miles of milling, patching and resurfacing on IL 14 from IL 37 in Benton to west of Happy Row Road in Macedonia. | — | Executed | E. T. Simonds Construction Company $5,779,645 · | ||
| Jun 13, 2025 | 99747 | FranklinDistrict 9 | Construction of stamped Concrete Sidewalk, street lighting system, Curb and gutter on IL 149 in West Frankfort. | — | Rejected | |||
| Nov 7, 2025 | 78994 | FranklinDistrict 9 | Adjustment of a sanitary sewer forced main and the repair of two eroded downstream channels at I-57 Northbound Rend Lake Rest Area. | — | Executed | Samron Midwest Contracting, Inc. $124,571 · | ||
| Nov 7, 2025 | 78B23 | FranklinDistrict 9 | Replacement of SN 028-7049 on IL 14, 1 mile east of Benton. | — | Executed | Samron Midwest Contracting, Inc. $758,456 · | ||
| Jan 16, 2026 | 78A09 | FranklinDistrict 9 | Drainage culvert removal and replacement on IL 148 south of 9th Street in the City of Christopher. | — | Executed | Samron Midwest Contracting, Inc. $957,763 · | ||
| Jan 16, 2026 | 78B75 | FranklinDistrict 9 | Patching on IL 37 from IL 154 to IL 14 in Benton. | — | Executed | E. T. Simonds Construction Company $576,537 · | ||
| Jan 16, 2026 | 78B78 | FranklinDistrict 9 | HMA overlay and joint repairs on SN 028-0050 and SN 028-0051 carrying IL 154 over Rend Lake. | — | Executed | Samron Midwest Contracting, Inc. $212,882 · | ||
| Jan 16, 2026 | 78B92 | FranklinDistrict 9 | 1.4 miles of slope stabilization with riprap along the IL 154 causeway over Rend Lake from Rend City Road to Fitzgerald Park Road. | — | Executed | Samron Midwest Contracting, Inc. $197,197 · | ||
| Feb 27, 2026 | 78A87 | FranklinDistrict 9 | Signal modifications, pedestrian crossings and sidewalks at the intersection of IL 14 and Central Street in West City. | — | Executed | F. W. Electric, Inc. $543,064 · | ||
| Feb 27, 2026 | 78B83 | FranklinSalineDistrict 9 | Building demolition and site cleanup at 3 locations in West City, Benton and Harrisburg. | — | Executed | Samron Midwest Contracting, Inc. $338,886 · | ||
| Apr 24, 2026 | 78B36 | FranklinDistrict 9 | Joint replacement, repairs and overlay on SN 028-0020 carrying IL 14 over the Big Muddy River, east of Buckner. | — | Executed | E. T. Simonds Construction Company $1,755,135 · | ||
| Apr 24, 2026 | 99767 | FranklinDistrict 9 | Resurfacing on North Thompsonville Road from Akin Blacktop to IL 34, north of Thompsonville. | — | Executed | E. T. Simonds Construction Company $1,090,460 · | ||
| Jun 12, 2026 | 78977 | FranklinDistrict 9 | Reconstruction of Benton Square (IL 14 / IL 37) with improved turning movements and island crosswalks. | — | Executed | Samron Midwest Contracting, Inc. $967,393 · | ||
| Jun 12, 2026 | 78B59 | FranklinDistrict 9 | 1.8 miles of resurfacing on IL 148 from IL 14 to Yellow Bank Road. | — | Executed | Samron Midwest Contracting, Inc. $1,230,184 · | ||
| Jul 31, 2026 | 78B80 | FranklinDistrict 9 | 10.5 miles of tree trimming on IL 34 from Akin Blacktop to the Saline County line. | — | Executed | Mosley Construction 1, LLC $717,325 · | ||
| Sep 18, 2026 | 78990 | FranklinDistrict 9 | Replace box culvert (SN 028-7068) on IL 149 over the Green River. | — | Executed | Samron Midwest Contracting, Inc. $539,518 · | ||
| Sep 18, 2026 | 78C34 | FranklinDistrict 9 | Tree removal along the east side of I-57 from 3 miles south of the West Frankfort interchange (at mile marker 62) to 3 miles south of the West City interchange (at mile marker 68). | — | Executed | Homer Tree Service, Inc. $1,824,386 · | ||
| Sep 18, 2026 | 99778 | FranklinDistrict 9 | Crack sealing, HMA binder, A-2 bituminous surface treatment, curb and gutter, and aggregate shoulders on various roadways in the Gun Creek Recreational Area. | — | Executed | E. T. Simonds Construction Company $301,965 · |
1–72 of 72
Lettings: IDOT Transportation Bulletin (Notice of Letting and Contract Detail pages). Planned projects: IDOT Multi-Year Highway Improvement Program (roadway, structure and spot layers on the IDOT open data hub), listed by program year, not let date. "Added" is the first date Bid Potato saw the job. Always confirm against the official proposal before bidding.