Filtered by: County: Saline Clear all
| Let date | Contract / PPS | County / Division | Highway | Description | Estimate | Status | Low bidder | |
|---|---|---|---|---|---|---|---|---|
| Jan 19, 2018 | 78597 | SalineDistrict 9 | Concrete shoulders, traffic signals and pavement markings at the intersection of IL 13 and Old IL 13 in Harrisburg. | — | Executed | Brown Electric, Inc. $228,251 · | ||
| Mar 9, 2018 | 78579 | SalineDistrict 9 | Bridge repairs on SN 083-0048 and approach correction repairs on SN 083-0062 just north of Harrisburg. | — | Executed | E. T. Simonds Construction Company $350,766 · | ||
| Apr 27, 2018 | 78166 | SalineDistrict 9 | Replacement of two single span bridges on IL 34, 0.5 mile west of Galatia and one mile east of Galatia (SN 083-0026 and 083-0027). | — | Executed | Sierra Bravo Contractors, LLC $2,313,470 · | ||
| Apr 27, 2018 | 78590 | SalineDistrict 9 | 16.3 miles of tree pruning along US 34 and US 45. | — | Rejected | Nettle Creek Nursery, Inc. $625,210 · | ||
| Jun 15, 2018 | 99576 | SalineDistrict 9 | Replace the bridge carrying Garner Road over Brush Creek, 3.5 miles northeast of Eldorado. | — | Executed | Depew and Owen Builders, Inc. $214,888 · | ||
| Aug 3, 2018 | 78661 | JeffersonSalineDistrict 9 | Remove box culverts 041-7056 on IL 37 and 083-7059 on IL 142 and replace with elliptical pipes. | — | Executed | Haier Plumbing and Heating, Inc. $191,911 · | ||
| Apr 26, 2019 | 99575 | SalineDistrict 9 | Replace the bridge carrying DeNeal Road over an unnamed creek, 3 miles east of Mitchellsville. | — | Executed | Dees, Inc. $188,243 · | ||
| Aug 2, 2019 | 78734 | SalineDistrict 9 | Tree planting for wetland mitigation site and proposed steel plate weir along IL 13 near Lovers Lane, west of Harrisburg. | — | Executed | Nettle Creek Nursery, Inc. $64,465 · | ||
| Apr 24, 2020 | 78764 | SalineDistrict 9 | 7.2 miles of resurfacing on US 45 / IL 34 from Locust Street in Harrisburg to IL 142 in Eldorado. | — | Executed | E. T. Simonds Construction Company $3,339,966 · | ||
| Apr 24, 2020 | 99635 | SalineDistrict 9 | Replace the bridge carrying Hagen Road over Indian Creek, 2.0 miles northwest of Eldorado. | — | Executed | Dees, Inc. $180,714 · | ||
| Jun 12, 2020 | 78717 | SalineDistrict 9 | Reconstruction of ADA ramps at 7 locations along IL 34 (Main Street) and along Old IL 13 (Polar Steet) in Harrisburg. | — | Executed | Samron Midwest Contracting, Inc. $161,701 · | ||
| Jun 12, 2020 | 99600 | SalineDistrict 9 | Removal of a three-span precast prestressed concrete deck beam bridge, construction of 148 feet of reinforced concrete culvert pipe, construction of 300 feet of roadway embankment (using 22,392 cu. yd. of furnished excavation) and hot-mix asphalt pavement with aggregate base, placing riprap for erosion control, seeding all distrubed areas and miscellaneous items necessary to complete the improvement. | — | Executed | E. T. Simonds Construction Company $403,665 · | ||
| Jun 12, 2020 | 99649 | SalineDistrict 9 | Resurfacing Mill Street from Town Park Road to Oak Street. | — | Executed | E. T. Simonds Construction Company $412,963 · | ||
| Jan 15, 2021 | 99656 | SalineDistrict 9 | Resurfacing Liberty Road from Barnett Street to US 45. | — | Executed | E. T. Simonds Construction Company $411,217 · | ||
| Mar 5, 2021 | 78501 | SalineDistrict 9 | Replacement of box culvert carrying US 45 over a stream and replacement of a single span bridge with a double box culvert carrying Feazel Road, off of US 45, over Pankey Branch. This project is located near Harrisburg. | — | Executed | Samron Midwest Contracting, Inc. $896,261 · | ||
| Mar 5, 2021 | 78760 | SalineDistrict 9 | 12.8 miles of pavement patching and resurfacing on US 45 from IL 145 in Harrisburg to the Williamson County line in Stonefort. | — | Executed | Southern Illinois Asphalt Co., Inc. $4,208,512 · | ||
| Apr 23, 2021 | 78151 | SalineDistrict 9 | Replacing the existing single span, closed abutment bridge with a new long span open abutment steel beam bridge with reinforced concrete deck on IL 142, 3 miles north of Eldorado. (SN 083-0032) | — | Executed | E. T. Simonds Construction Company $1,121,486 · | ||
| Jun 11, 2021 | 78680 | SalineDistrict 9 | Replacing the existing two-span deck beam bridge with a new triple opening, cast in place box culvert on IL 34/145, approximately 0.5 miles south of Harrisburg. (SN 083-0017) | — | Executed | E. T. Simonds Construction Company $1,135,942 · | ||
| Jun 11, 2021 | 78788 | SalineDistrict 9 | Construction of a RCUT intersection at the intersection of IL 13 and Carrier Mills Road and resurfacing IL 13 from the Williamson County line to West Poplar Street in Harrisburg. | — | Executed | Southern Illinois Asphalt Co., Inc. $6,632,826 · | ||
| Jun 11, 2021 | 78856 | PerrySalineDistrict 9 | Signal and highway lighting upgrades at the intersection of IL 154 and IL 150 in Perry County and the intersection of US 45 and Old IL 13 in Saline County. | — | Executed | Wissehr Electric, Inc. $86,998 · | ||
| Jun 11, 2021 | 99661 | SalineDistrict 9 | Resurface Johnston City Road from the Williamson County line to Harco Road. | — | Executed | E. T. Simonds Construction Company $832,254 · | ||
| Jun 11, 2021 | 99663 | SalineDistrict 9 | Sidewalk Construction along US 45 from IL 142 to 300' east, along IL 142 from Locust Street to US 45, and pedestrian traffic signal improvements at the intersection of IL 142 and US 45 in Eldorado. | — | Executed | E. T. Simonds Construction Company $348,961 · | ||
| Jul 30, 2021 | 99601 | SalineDistrict 9 | Replace the bridge carrying Forest Road over Little Eagle Creek, 8 miles west of IL 1. | — | Executed | Samron Midwest Contracting, Inc. $497,333 · | ||
| Sep 17, 2021 | 78602 | SalineDistrict 9 | 5.9 miles of patching, HMA surface removal, HMA surface, HMA shoulders and aggregate shoulders on IL 34 / 145 from the signalized intersection of US 45 and IL 34 / 145 to the intersection of IL 34 and IL 145. | — | Executed | E. T. Simonds Construction Company $2,188,313 · | ||
| Nov 5, 2021 | 78871 | SalineDistrict 9 | Resurfacing of Old IL 13 between the intersections with IL 13; Resurfacing of IL 13 from US 45 to Pankey Creek Bridge. | — | Executed | Southern Illinois Asphalt Co., Inc. $1,393,249 · | ||
| Mar 11, 2022 | 78890 | SalineDistrict 9 | Patching on US 45 from IL 13 to IL 34/145 in Harrisburg. | — | Executed | E. T. Simonds Construction Company $148,544 · | ||
| Apr 29, 2022 | 78901 | SalineDistrict 9 | 0.9 miles of resurfacing and pavement patching on IL 34 from Old IL 13 (Poplar Street) to the levee just north of Reservoir Road in Harrisburg. | — | Executed | E. T. Simonds Construction Company $646,217 · | ||
| Apr 29, 2022 | 78910 | MassacPopeSalineDistrict 9 | Pier and abutment repairs at SN 083-0038 on IL 34 over Middle Fork Ditch in Saline County; Pier and abutment repairs and new wearing surface at SN SN 076-0006 on IL 146 over Sugar Creek in Pope County; Partial depth joint reconstruction at SN 064-0003 on US 45 over Q Ditch in Massac County. | — | Executed | E. T. Simonds Construction Company $738,610 · | ||
| Jan 20, 2023 | 78716 | SalineDistrict 9 | Remove and replace SN 083-0001 and 083-0002 carrying US 45 over North Fork of Saline River and overflow, 1 mile and 0.5 miles north of Texas City. | — | Executed | E. T. Simonds Construction Company $9,746,225 · | ||
| Jan 20, 2023 | 78909 | SalineDistrict 9 | Signal modifications and ADA improvements at the intersection of Old IL 13 and Main Street in Harrisburg. , Signal modifications and ADA improvements at the intersection of Old IL 13 and Main Street in Harrisburg. | — | Executed | Brown Electric, Inc. $412,836 · | ||
| Apr 28, 2023 | 99681 | SalineDistrict 9 | Replace existing structure with a single-span PPC Deck Beam Bridge with Aggregate approaches on Tuller Road over a drainage ditch 1.6 miels south of Carrier Mills. | — | Executed | Dees, Inc. $317,900 · | ||
| Jun 16, 2023 | 99705 | SalineDistrict 9 | HMA resurfacing with aggregate shoulders, precast box culvert extensions, and pavement markings on College Road from IL 142 to IL 13. | — | Executed | E. T. Simonds Construction Company $1,063,122 · | ||
| Nov 17, 2023 | 78771 | SalineDistrict 9 | Intersection reconstruction at the intersection of US 45 and Poplar (Old IL 13) in Harrisburg. | — | Executed | E. T. Simonds Construction Company $1,369,045 · | ||
| Jan 19, 2024 | 99722 | SalineDistrict 9 | HMA Resurfacing with aggregate shoulders on Galatia Road from Cedar Point Road to IL 34 | — | Executed | Samron Midwest Contracting, Inc. $343,343 · | ||
| Mar 8, 2024 | 78A37 | SalineDistrict 9 | 7 miles of patching, HMA surface removal and resurfacing on IL 142 from the Hamilton County line to just north of US 45 in Eldorado. | — | Executed | E. T. Simonds Construction Company $2,986,792 · | ||
| Jun 14, 2024 | 78A51 | SalineDistrict 9 | 0.8 miles of resurfacing on US 45 / IL 34 from Poplar Street to IL 145 in Harrisburg. | — | Executed | Samron Midwest Contracting, Inc. $979,979 · | ||
| Jun 14, 2024 | 99724 | SalineDistrict 9 | Resurfacing Harco Road from IL 34 to IL 13. | — | Executed | E. T. Simonds Construction Company $1,930,584 · | ||
| Sep 20, 2024 | 78A32 | SalineDistrict 9 | 5.4 miles of resurfacing and guardrail repair and replacement on Old IL 13 from Harco Road to Barrett Lane in Harrisburg. | — | Executed | E. T. Simonds Construction Company $1,736,324 · | ||
| Mar 7, 2025 | 46946 | SalineDistrict 9 | Oil and chip, drainage and other improvements to the roads, Carrier Mills Township Road and parking lots near and within Sahara Woods State Fish and Wildlife Area. | — | Executed | Illini Asphalt Corporation $883,314 · | ||
| Apr 25, 2025 | 78894 | SalineDistrict 9 | 3.4 miles of resurfacing on IL 145 from north of the Pope County line to IL 34. | — | Executed | Samron Midwest Contracting, Inc. $1,493,057 · | ||
| Apr 25, 2025 | 78A56 | SalineDistrict 9 | Partial single box culvert replacement on US 45 just east of 4th Street in the City of Eldorado. | — | Executed | Samron Midwest Contracting, Inc. $584,789 · | ||
| Apr 25, 2025 | 78A99 | SalineDistrict 9 | 5.5 miles of resurfacing on IL 13 from Lindale Road to the Gallatin County line. | — | Executed | E. T. Simonds Construction Company $2,299,898 · | ||
| Apr 25, 2025 | 78B09 | GallatinSalineWhiteDistrict 9 | 2.4 miles of HMA removal, pavement overlay, shoulder work and guardrail improvements on US 45 beginning 0.7 miles southwest of the Saline/Gallatin County line and proceeding northeast 2.4 miles. | — | Executed | E. T. Simonds Construction Company $1,208,977 · | ||
| Jun 13, 2025 | 78399 | SalineDistrict 9 | Replacement of 3 structures: 1) SN 083-7000 carrying IL 34 over a creek 1.5 miles east of Franklin County; 2) SN 083-7001 carrying IL 34 over a creek 2.4 miles east of Franklin County; 3) SN 083-7022 carrying IL 145/34 over a creek 3.2 miles south of US 45. | — | Executed | Samron Midwest Contracting, Inc. $797,387 · | ||
| Jun 13, 2025 | 78B06 | SalineDistrict 9 | Signal replacement at the intersection of US 45 and Poplar Street in Harrisburg. | — | Executed | Brown Electric, Inc. $493,996 · | ||
| Jun 13, 2025 | 99750 | SalineDistrict 9 | Construction of a Roundabout at Small Street and Veterans Drive in Harrisburg. Includes PCC pavement, sidewalks, drainage, signing and lighting. | — | Executed | E. T. Simonds Construction Company $1,463,163 · | ||
| Jan 16, 2026 | 78C03 | SalineDistrict 9 | Replacement of SN 083-7080 carrying Old IL 13 over an unnamed creek, 4.6 miles west of Harrisburg. | — | Executed | Sierra Bravo Contractors, LLC $449,516 · | ||
| Feb 27, 2026 | 78B83 | FranklinSalineDistrict 9 | Building demolition and site cleanup at 3 locations in West City, Benton and Harrisburg. | — | Executed | Samron Midwest Contracting, Inc. $338,886 · | ||
| Apr 24, 2026 | 78B87 | SalineDistrict 9 | Joint repairs, wingwall repairs and bridge deck overlay on SN 083-0052 and 083-0053 carrying IL 13 over Bankston Fork. | — | Executed | E. T. Simonds Construction Company $501,499 · | ||
| Jun 12, 2026 | 78B94 | SalineDistrict 9 | Mast arm upgrades at the intersection of US 45 and IL 13. | — | Executed | Brown Electric, Inc. $612,761 · | ||
| Sep 18, 2026 | 78A98 | SalineDistrict 9 | Removal and replacement of 2 box culverts: 1) SN 083-7053 carrying IL 142 over a creek, 1 mile southeast of US 45 in Eldorado; 2) SN 083-7054 carrying IL 142 over a creek, 2.1 miles southeast of US 45 in Eldorado. | — | Executed | |||
| Sep 18, 2026 | 78C29 | GallatinSalineDistrict 9 | Location 1 - 2.08 miles of HMA surface removal, HMA resurfacing, HMA shoulders, patching and ADA ramps on IL 13 from Poplar Street to US 45 in Harrisburg. Location 2 - 0.74 miles of HMA surface removal, HMA resurfacing, aggregate shoulders and patching on IL 13 from the Gallatin County line to IL 142. | — | Executed | E. T. Simonds Construction Company $2,354,550 · | ||
| Sep 18, 2026 | 99776 | SalineDistrict 9 | PCC sidewalk construction along US 45 from IL 142 to the Tunnel Hill State Trail Extention parking lot in Eldorado. | — | Rejected |
1–53 of 53
Lettings: IDOT Transportation Bulletin (Notice of Letting and Contract Detail pages). Planned projects: IDOT Multi-Year Highway Improvement Program (roadway, structure and spot layers on the IDOT open data hub), listed by program year, not let date. "Added" is the first date Bid Potato saw the job. Always confirm against the official proposal before bidding.