IDOT Jobs

All dates · 53 jobs · — Sign up free
★ My Jobs

Filtered by: County: Saline Clear all

53 jobs · — estimated

ExcelCSV
Let date Contract / PPS County / Division Highway Description Estimate Status Added Low bidder
Jan 19, 2018 78597 SalineDistrict 9 Concrete shoulders, traffic signals and pavement markings at the intersection of IL 13 and Old IL 13 in Harrisburg. — Executed Nov 26 New Brown Electric, Inc. $228,251 ·
Mar 9, 2018 78579 SalineDistrict 9 Bridge repairs on SN 083-0048 and approach correction repairs on SN 083-0062 just north of Harrisburg. — Executed Nov 26 New E. T. Simonds Construction Company $350,766 ·
Apr 27, 2018 78166 SalineDistrict 9 Replacement of two single span bridges on IL 34, 0.5 mile west of Galatia and one mile east of Galatia (SN 083-0026 and 083-0027). — Executed Nov 26 New Sierra Bravo Contractors, LLC $2,313,470 ·
Apr 27, 2018 78590 SalineDistrict 9 16.3 miles of tree pruning along US 34 and US 45. — Rejected Nov 26 New Nettle Creek Nursery, Inc. $625,210 ·
Jun 15, 2018 99576 SalineDistrict 9 Replace the bridge carrying Garner Road over Brush Creek, 3.5 miles northeast of Eldorado. — Executed Nov 26 New Depew and Owen Builders, Inc. $214,888 ·
Aug 3, 2018 78661 JeffersonSalineDistrict 9 Remove box culverts 041-7056 on IL 37 and 083-7059 on IL 142 and replace with elliptical pipes. — Executed Nov 26 New Haier Plumbing and Heating, Inc. $191,911 ·
Apr 26, 2019 99575 SalineDistrict 9 Replace the bridge carrying DeNeal Road over an unnamed creek, 3 miles east of Mitchellsville. — Executed Nov 26 New Dees, Inc. $188,243 ·
Aug 2, 2019 78734 SalineDistrict 9 Tree planting for wetland mitigation site and proposed steel plate weir along IL 13 near Lovers Lane, west of Harrisburg. — Executed Nov 26 New Nettle Creek Nursery, Inc. $64,465 ·
Apr 24, 2020 78764 SalineDistrict 9 7.2 miles of resurfacing on US 45 / IL 34 from Locust Street in Harrisburg to IL 142 in Eldorado. — Executed Nov 26 New E. T. Simonds Construction Company $3,339,966 ·
Apr 24, 2020 99635 SalineDistrict 9 Replace the bridge carrying Hagen Road over Indian Creek, 2.0 miles northwest of Eldorado. — Executed Nov 26 New Dees, Inc. $180,714 ·
Jun 12, 2020 78717 SalineDistrict 9 Reconstruction of ADA ramps at 7 locations along IL 34 (Main Street) and along Old IL 13 (Polar Steet) in Harrisburg. — Executed Nov 26 New Samron Midwest Contracting, Inc. $161,701 ·
Jun 12, 2020 99600 SalineDistrict 9 Removal of a three-span precast prestressed concrete deck beam bridge, construction of 148 feet of reinforced concrete culvert pipe, construction of 300 feet of roadway embankment (using 22,392 cu. yd. of furnished excavation) and hot-mix asphalt pavement with aggregate base, placing riprap for erosion control, seeding all distrubed areas and miscellaneous items necessary to complete the improvement. — Executed Nov 26 New E. T. Simonds Construction Company $403,665 ·
Jun 12, 2020 99649 SalineDistrict 9 Resurfacing Mill Street from Town Park Road to Oak Street. — Executed Nov 26 New E. T. Simonds Construction Company $412,963 ·
Jan 15, 2021 99656 SalineDistrict 9 Resurfacing Liberty Road from Barnett Street to US 45. — Executed Nov 26 New E. T. Simonds Construction Company $411,217 ·
Mar 5, 2021 78501 SalineDistrict 9 Replacement of box culvert carrying US 45 over a stream and replacement of a single span bridge with a double box culvert carrying Feazel Road, off of US 45, over Pankey Branch. This project is located near Harrisburg. — Executed Nov 26 New Samron Midwest Contracting, Inc. $896,261 ·
Mar 5, 2021 78760 SalineDistrict 9 12.8 miles of pavement patching and resurfacing on US 45 from IL 145 in Harrisburg to the Williamson County line in Stonefort. — Executed Nov 26 New Southern Illinois Asphalt Co., Inc. $4,208,512 ·
Apr 23, 2021 78151 SalineDistrict 9 Replacing the existing single span, closed abutment bridge with a new long span open abutment steel beam bridge with reinforced concrete deck on IL 142, 3 miles north of Eldorado. (SN 083-0032) — Executed Nov 26 New E. T. Simonds Construction Company $1,121,486 ·
Jun 11, 2021 78680 SalineDistrict 9 Replacing the existing two-span deck beam bridge with a new triple opening, cast in place box culvert on IL 34/145, approximately 0.5 miles south of Harrisburg. (SN 083-0017) — Executed Nov 26 New E. T. Simonds Construction Company $1,135,942 ·
Jun 11, 2021 78788 SalineDistrict 9 Construction of a RCUT intersection at the intersection of IL 13 and Carrier Mills Road and resurfacing IL 13 from the Williamson County line to West Poplar Street in Harrisburg. — Executed Nov 26 New Southern Illinois Asphalt Co., Inc. $6,632,826 ·
Jun 11, 2021 78856 PerrySalineDistrict 9 Signal and highway lighting upgrades at the intersection of IL 154 and IL 150 in Perry County and the intersection of US 45 and Old IL 13 in Saline County. — Executed Nov 26 New Wissehr Electric, Inc. $86,998 ·
Jun 11, 2021 99661 SalineDistrict 9 Resurface Johnston City Road from the Williamson County line to Harco Road. — Executed Nov 26 New E. T. Simonds Construction Company $832,254 ·
Jun 11, 2021 99663 SalineDistrict 9 Sidewalk Construction along US 45 from IL 142 to 300' east, along IL 142 from Locust Street to US 45, and pedestrian traffic signal improvements at the intersection of IL 142 and US 45 in Eldorado. — Executed Nov 26 New E. T. Simonds Construction Company $348,961 ·
Jul 30, 2021 99601 SalineDistrict 9 Replace the bridge carrying Forest Road over Little Eagle Creek, 8 miles west of IL 1. — Executed Nov 26 New Samron Midwest Contracting, Inc. $497,333 ·
Sep 17, 2021 78602 SalineDistrict 9 5.9 miles of patching, HMA surface removal, HMA surface, HMA shoulders and aggregate shoulders on IL 34 / 145 from the signalized intersection of US 45 and IL 34 / 145 to the intersection of IL 34 and IL 145. — Executed Nov 26 New E. T. Simonds Construction Company $2,188,313 ·
Nov 5, 2021 78871 SalineDistrict 9 Resurfacing of Old IL 13 between the intersections with IL 13; Resurfacing of IL 13 from US 45 to Pankey Creek Bridge. — Executed Nov 26 New Southern Illinois Asphalt Co., Inc. $1,393,249 ·
Mar 11, 2022 78890 SalineDistrict 9 Patching on US 45 from IL 13 to IL 34/145 in Harrisburg. — Executed Nov 26 New E. T. Simonds Construction Company $148,544 ·
Apr 29, 2022 78901 SalineDistrict 9 0.9 miles of resurfacing and pavement patching on IL 34 from Old IL 13 (Poplar Street) to the levee just north of Reservoir Road in Harrisburg. — Executed Nov 26 New E. T. Simonds Construction Company $646,217 ·
Apr 29, 2022 78910 MassacPopeSalineDistrict 9 Pier and abutment repairs at SN 083-0038 on IL 34 over Middle Fork Ditch in Saline County; Pier and abutment repairs and new wearing surface at SN SN 076-0006 on IL 146 over Sugar Creek in Pope County; Partial depth joint reconstruction at SN 064-0003 on US 45 over Q Ditch in Massac County. — Executed Nov 26 New E. T. Simonds Construction Company $738,610 ·
Jan 20, 2023 78716 SalineDistrict 9 Remove and replace SN 083-0001 and 083-0002 carrying US 45 over North Fork of Saline River and overflow, 1 mile and 0.5 miles north of Texas City. — Executed Nov 26 New E. T. Simonds Construction Company $9,746,225 ·
Jan 20, 2023 78909 SalineDistrict 9 Signal modifications and ADA improvements at the intersection of Old IL 13 and Main Street in Harrisburg. , Signal modifications and ADA improvements at the intersection of Old IL 13 and Main Street in Harrisburg. — Executed Nov 26 New Brown Electric, Inc. $412,836 ·
Apr 28, 2023 99681 SalineDistrict 9 Replace existing structure with a single-span PPC Deck Beam Bridge with Aggregate approaches on Tuller Road over a drainage ditch 1.6 miels south of Carrier Mills. — Executed Nov 26 New Dees, Inc. $317,900 ·
Jun 16, 2023 99705 SalineDistrict 9 HMA resurfacing with aggregate shoulders, precast box culvert extensions, and pavement markings on College Road from IL 142 to IL 13. — Executed Nov 26 New E. T. Simonds Construction Company $1,063,122 ·
Nov 17, 2023 78771 SalineDistrict 9 Intersection reconstruction at the intersection of US 45 and Poplar (Old IL 13) in Harrisburg. — Executed Nov 26 New E. T. Simonds Construction Company $1,369,045 ·
Jan 19, 2024 99722 SalineDistrict 9 HMA Resurfacing with aggregate shoulders on Galatia Road from Cedar Point Road to IL 34 — Executed Nov 26 New Samron Midwest Contracting, Inc. $343,343 ·
Mar 8, 2024 78A37 SalineDistrict 9 7 miles of patching, HMA surface removal and resurfacing on IL 142 from the Hamilton County line to just north of US 45 in Eldorado. — Executed Nov 26 New E. T. Simonds Construction Company $2,986,792 ·
Jun 14, 2024 78A51 SalineDistrict 9 0.8 miles of resurfacing on US 45 / IL 34 from Poplar Street to IL 145 in Harrisburg. — Executed Nov 26 New Samron Midwest Contracting, Inc. $979,979 ·
Jun 14, 2024 99724 SalineDistrict 9 Resurfacing Harco Road from IL 34 to IL 13. — Executed Nov 26 New E. T. Simonds Construction Company $1,930,584 ·
Sep 20, 2024 78A32 SalineDistrict 9 5.4 miles of resurfacing and guardrail repair and replacement on Old IL 13 from Harco Road to Barrett Lane in Harrisburg. — Executed Nov 26 New E. T. Simonds Construction Company $1,736,324 ·
Mar 7, 2025 46946 SalineDistrict 9 Oil and chip, drainage and other improvements to the roads, Carrier Mills Township Road and parking lots near and within Sahara Woods State Fish and Wildlife Area. — Executed Nov 25 New Illini Asphalt Corporation $883,314 ·
Apr 25, 2025 78894 SalineDistrict 9 3.4 miles of resurfacing on IL 145 from north of the Pope County line to IL 34. — Executed Nov 25 New Samron Midwest Contracting, Inc. $1,493,057 ·
Apr 25, 2025 78A56 SalineDistrict 9 Partial single box culvert replacement on US 45 just east of 4th Street in the City of Eldorado. — Executed Nov 25 New Samron Midwest Contracting, Inc. $584,789 ·
Apr 25, 2025 78A99 SalineDistrict 9 5.5 miles of resurfacing on IL 13 from Lindale Road to the Gallatin County line. — Executed Nov 25 New E. T. Simonds Construction Company $2,299,898 ·
Apr 25, 2025 78B09 GallatinSalineWhiteDistrict 9 2.4 miles of HMA removal, pavement overlay, shoulder work and guardrail improvements on US 45 beginning 0.7 miles southwest of the Saline/Gallatin County line and proceeding northeast 2.4 miles. — Executed Nov 25 New E. T. Simonds Construction Company $1,208,977 ·
Jun 13, 2025 78399 SalineDistrict 9 Replacement of 3 structures: 1) SN 083-7000 carrying IL 34 over a creek 1.5 miles east of Franklin County; 2) SN 083-7001 carrying IL 34 over a creek 2.4 miles east of Franklin County; 3) SN 083-7022 carrying IL 145/34 over a creek 3.2 miles south of US 45. — Executed Nov 25 New Samron Midwest Contracting, Inc. $797,387 ·
Jun 13, 2025 78B06 SalineDistrict 9 Signal replacement at the intersection of US 45 and Poplar Street in Harrisburg. — Executed Nov 25 New Brown Electric, Inc. $493,996 ·
Jun 13, 2025 99750 SalineDistrict 9 Construction of a Roundabout at Small Street and Veterans Drive in Harrisburg. Includes PCC pavement, sidewalks, drainage, signing and lighting. — Executed Nov 25 New E. T. Simonds Construction Company $1,463,163 ·
Jan 16, 2026 78C03 SalineDistrict 9 Replacement of SN 083-7080 carrying Old IL 13 over an unnamed creek, 4.6 miles west of Harrisburg. — Executed Nov 25 New Sierra Bravo Contractors, LLC $449,516 ·
Feb 27, 2026 78B83 FranklinSalineDistrict 9 Building demolition and site cleanup at 3 locations in West City, Benton and Harrisburg. — Executed Nov 25 New Samron Midwest Contracting, Inc. $338,886 ·
Apr 24, 2026 78B87 SalineDistrict 9 Joint repairs, wingwall repairs and bridge deck overlay on SN 083-0052 and 083-0053 carrying IL 13 over Bankston Fork. — Executed Nov 25 New E. T. Simonds Construction Company $501,499 ·
Jun 12, 2026 78B94 SalineDistrict 9 Mast arm upgrades at the intersection of US 45 and IL 13. — Executed Nov 25 New Brown Electric, Inc. $612,761 ·
Sep 18, 2026 78A98 SalineDistrict 9 Removal and replacement of 2 box culverts: 1) SN 083-7053 carrying IL 142 over a creek, 1 mile southeast of US 45 in Eldorado; 2) SN 083-7054 carrying IL 142 over a creek, 2.1 miles southeast of US 45 in Eldorado. — Executed Nov 25 New
Sep 18, 2026 78C29 GallatinSalineDistrict 9 Location 1 - 2.08 miles of HMA surface removal, HMA resurfacing, HMA shoulders, patching and ADA ramps on IL 13 from Poplar Street to US 45 in Harrisburg. Location 2 - 0.74 miles of HMA surface removal, HMA resurfacing, aggregate shoulders and patching on IL 13 from the Gallatin County line to IL 142. — Executed Nov 25 New E. T. Simonds Construction Company $2,354,550 ·
Sep 18, 2026 99776 SalineDistrict 9 PCC sidewalk construction along US 45 from IL 142 to the Tunnel Hill State Trail Extention parking lot in Eldorado. — Rejected Nov 25 New
1–53 of 53

Lettings: IDOT Transportation Bulletin (Notice of Letting and Contract Detail pages). Planned projects: IDOT Multi-Year Highway Improvement Program (roadway, structure and spot layers on the IDOT open data hub), listed by program year, not let date. "Added" is the first date Bid Potato saw the job. Always confirm against the official proposal before bidding.