32B-2; 32B-3
- Let date
- Friday, March 5, 2021
- Contract
- 78501 · job page
- District
- District 9
- County
- Saline
- Highway
- Limits
- Replacement of box culvert carrying US 45 over a stream and replacement of a single span bridge with a double box culvert carrying Feazel Road, off of US 45, over Pankey Branch. This project is located near Harrisburg.
Bidders 3
| # | Contractor | Total bid | vs estimate | vs low |
|---|---|---|---|---|
| EE | Engineer's estimate | — | ||
| 1 | Samron Midwest Contracting, Inc. Low bidder | $896,261 | ||
| 2 | E. T. Simonds Construction Company | $997,654 | +11.3% | |
| 3 | Sierra Bravo Contractors, LLC | $1,107,524 | +23.6% |
| Seq | Bid code | Description | Qty | Unit | Estimate | #1 Samron Midwest … | #2 E. T. Simonds C… | #3 Sierra Bravo Co… |
|---|---|---|---|---|---|---|---|---|
| 1 | X0323265 | REMOVE EXIST RIPRAP | 24 | SQ YD | $20.00 | $15.58 | $24.08 | |
| 2 | X0327979 | PAVMT MRKG REM GRIND | 250 | SQ FT | $3.00 | $11.26 | $10.93 | |
| 3 | X0900064 | MEMBR WTRPR SYS B STR | 244 | SQ YD | $35.00 | $48.59 | $24.03 | |
| 4 | X4401198 | HMA SURF REM VAR DP | 482 | SQ YD | $17.00 | $10.55 | $18.23 | |
| 5 | X6310088 | TRAF BAR TERM T6A SPL | 1 | EACH | $6,300.00 | $6,300.00 | $5,431.50 | |
| 6 | X6310195 | TBT T1 SPL TANG MOD | 2 | EACH | $2,675.00 | $2,625.00 | $3,825.00 | |
| 7 | X6330725 | SPBGR (SHORT RADIUS) | 87.5 | FOOT | $55.00 | $52.50 | $51.00 | |
| 8 | X7011800 | TRAF CONT-PROT BLR 21 | 1 | L SUM | $2,500.00 | $2,016.15 | $7,650.00 | |
| 9 | X7030005 | TEMP PAVT MKING REMOV | 453 | SQ FT | $0.00 | $0.00 | $11.72 | |
| 10 | X7040125 | PIN TEMP CONC BARRIER | 24 | EACH | $40.00 | $20.78 | $20.87 | |
| 11 | Z0033700 | LONG JOINT SEALANT | 295 | FOOT | $5.00 | $33.55 | $29.06 | |
| 12 | Z0054517 | ROCK FILL - FOUNDATN | 535 | TON | $28.00 | $37.57 | $36.35 | |
| 13 | Z0075496 | CONC RETAIN WALL REM | 137 | FOOT | $10.00 | $9.54 | $21.21 | |
| 14 | 20200100 | EARTH EXCAVATION | 2,180 | CU YD | $19.00 | $24.87 | $20.44 | |
| 15 | 20700220 | POROUS GRAN EMBANK | 800 | CU YD | $40.00 | $47.20 | $42.82 | |
| 16 | 25000210 | SEEDING CL 2A | 0.25 | ACRE | $7,000.00 | $2,205.00 | $2,142.00 | |
| 17 | 25000305 | SEEDING CL 3A | 0.5 | ACRE | $4,800.00 | $3,255.00 | $3,162.00 | |
| 18 | 25000400 | NITROGEN FERT NUTR | 70 | POUND | $1.20 | $1.05 | $1.02 | |
| 19 | 25000500 | PHOSPHORUS FERT NUTR | 70 | POUND | $1.20 | $1.05 | $1.02 | |
| 20 | 25000600 | POTASSIUM FERT NUTR | 70 | POUND | $1.20 | $1.05 | $1.02 | |
| 21 | 25000700 | AGR GROUND LIMESTONE | 1.5 | TON | $275.00 | $105.00 | $102.00 | |
| 22 | 25100115 | MULCH METHOD 2 | 0.75 | ACRE | $1,600.00 | $1,890.00 | $1,836.00 | |
| 23 | 25100630 | EROSION CONTR BLANKET | 2,413 | SQ YD | $1.60 | $1.68 | $1.63 | |
| 24 | 28000250 | TEMP EROS CONTR SEED | 150 | POUND | $0.00 | $3.40 | $1.00 | |
| 25 | 28000305 | TEMP DITCH CHECKS | 45 | FOOT | $25.00 | $14.28 | $15.84 | |
| 26 | 28000500 | INLET & PIPE PROTECT | 1 | EACH | $125.00 | $146.16 | $153.00 | |
| 27 | 28100107 | STONE RIPRAP CL A4 | 325 | SQ YD | $30.00 | $37.97 | $45.95 | |
| 28 | 28200200 | FILTER FABRIC | 325 | SQ YD | $2.00 | $2.66 | $2.04 | |
| 29 | 31101200 | SUB GRAN MAT B 4 | 554 | SQ YD | $8.00 | $9.49 | $8.91 | |
| 30 | 35102000 | AGG BASE CSE B 8 | 407 | SQ YD | $12.00 | $16.09 | $15.96 | |
| 31 | 35650500 | BASE CSE WID 10 | 769 | SQ YD | $75.00 | $79.67 | $97.81 | |
| 32 | 40600290 | BIT MATLS TACK CT | 1,967 | POUND | $0.00 | $0.00 | $0.0100 | |
| 33 | 40600990 | TEMPORARY RAMP | 76 | SQ YD | $20.00 | $47.88 | $113.21 | |
| 34 | 40604052 | HMA SC IL-9.5 C N70 | 112 | TON | $175.00 | $133.80 | $191.54 | |
| 35 | 42000060 | WELDED WIRE REINF | 134 | SQ YD | $15.00 | $10.49 | $18.00 | |
| 36 | 42000500 | PCC PVT 10 | 507 | SQ YD | $95.00 | $101.12 | $91.02 | |
| 37 | 42001300 | PROTECTIVE COAT | 507 | SQ YD | $0.00 | $0.00 | $2.00 | |
| 38 | 44000100 | PAVEMENT REM | 576 | SQ YD | $15.00 | $19.66 | $18.81 | |
| 39 | 44004250 | PAVED SHLD REMOVAL | 107 | SQ YD | $15.00 | $12.21 | $12.66 | |
| 40 | 48203029 | HMA SHOULDERS 8 | 262 | SQ YD | $25.00 | $88.94 | $82.64 | |
| 41 | 50100300 | REM EXIST STRUCT N1 | 1 | EACH | $10,000.00 | $12,783.69 | $29,033.66 | |
| 42 | 50100400 | REM EXIST STRUCT N2 | 1 | EACH | $10,000.00 | $21,274.65 | $29,033.66 | |
| 43 | 50104400 | CONC HDWL REM | 1 | EACH | $1,000.00 | $326.60 | $5,774.83 | |
| 44 | 50105220 | PIPE CULVERT REMOV | 5 | FOOT | $35.00 | $47.77 | $112.01 | |
| 45 | 50200450 | REM/DISP UNS MATL-STR | 307 | CU YD | $20.00 | $21.08 | $24.30 | |
| 46 | 50800205 | REINF BARS, EPOXY CTD | 48,960 | POUND | $1.40 | $1.53 | $1.41 | |
| 47 | 50800515 | BAR SPLICERS | 90 | EACH | $30.00 | $21.09 | $26.71 | |
| 48 | 50900200 | STEEL RAIL TYPE 2399 | 19 | FOOT | $440.00 | $420.00 | $484.50 | |
| 49 | 51500100 | NAME PLATES | 2 | EACH | $400.00 | $589.00 | $765.00 | |
| 50 | 52200010 | TEMP SHT PILING | 915 | SQ FT | $45.00 | $34.94 | $39.52 | |
| 51 | 52200015 | PERM SHT PILING | 600 | SQ FT | $40.00 | $46.07 | $69.99 | |
| 52 | 52200600 | GEOTEX RETAIN WALL | 50 | SQ FT | $12.00 | $69.55 | $102.00 | |
| 53 | 54003000 | CONC BOX CUL | 237 | CU YD | $885.00 | $975.00 | $940.13 | |
| 54 | 542A0223 | P CUL CL A 1 18 | 2 | FOOT | $230.00 | $160.17 | $488.41 | |
| 55 | 54213663 | PRC FLAR END SEC 18 | 1 | EACH | $950.00 | $954.71 | $1,500.00 | |
| 56 | 59100100 | GEOCOMPOSITE WALL DR | 244 | SQ YD | $15.00 | $17.69 | $21.94 | |
| 57 | 60218400 | MAN TA 4 DIA T1F CL | 1 | EACH | $2,500.00 | $3,052.60 | $4,280.12 | |
| 58 | 63000003 | SPBGR TY A 9FT POSTS | 75 | FOOT | $38.00 | $36.75 | $45.90 | |
| 59 | 63000030 | SPGR ATT TO CULVERT | 62.5 | FOOT | $250.00 | $236.25 | $188.70 | |
| 60 | 63100087 | TRAF BAR TERM T6A | 1 | EACH | $5,000.00 | $4,725.00 | $4,921.50 | |
| 61 | 63100167 | TR BAR TRM T1 SPL TAN | 4 | EACH | $4,200.00 | $3,990.00 | $3,876.00 | |
| 62 | 63200310 | GUARDRAIL REMOV | 329 | FOOT | $6.00 | $6.71 | $12.53 | |
| 63 | 63500105 | DELINEATORS | 5 | EACH | $70.00 | $103.16 | $85.68 | |
| 64 | 64200108 | SHOULDER RUM STRIP 8 | 585 | FOOT | $17.00 | $15.56 | $17.26 | |
| 65 | 66600105 | FUR ERECT ROW MARKERS | 12 | EACH | $150.00 | $110.25 | $107.10 | |
| 66 | 67000400 | ENGR FIELD OFFICE A | 10 | CAL MO | $1,500.00 | $1,800.00 | $2,040.00 | |
| 67 | 67100100 | MOBILIZATION | 1 | L SUM | $53,000.00 | $62,461.45 | $66,388.17 | |
| 68 | 70100100 | TRAF CONT-PROT 701316 | 1 | EACH | $2,500.00 | $3,628.85 | $9,613.50 | |
| 69 | 70100405 | TRAF CONT-PROT 701321 | 1 | EACH | $5,000.00 | $11,324.88 | $19,890.00 | |
| 70 | 70100450 | TRAF CONT-PROT 701201 | 1 | L SUM | $10,000.00 | $5,131.00 | $2,550.00 | |
| 71 | 70100500 | TRAF CONT-PROT 701326 | 1 | L SUM | $0.00 | $3,848.25 | $3,825.00 | |
| 72 | 70103815 | TR CONT SURVEILLANCE | 10 | CAL DA | $0.00 | $0.00 | $414.15 | |
| 73 | 70106500 | TEMP BR TRAF SIGNALS | 1 | EACH | $17,500.00 | $15,642.81 | $16,830.00 | |
| 74 | 70106700 | TEMP RUMBLE STRIPS | 6 | EACH | $1,200.00 | $603.75 | $586.50 | |
| 75 | 70107025 | CHANGEABLE MESSAGE SN | 56 | CAL DA | $75.00 | $57.69 | $91.80 | |
| 76 | 70300100 | SHORT TERM PAVT MKING | 144 | FOOT | $0.00 | $1.39 | $2.00 | |
| 77 | 70300150 | SHRT TRM PAVT MK REM | 48 | SQ FT | $0.00 | $2.51 | $10.00 | |
| 78 | 70300220 | TEMP PVT MK LINE 4 | 1,357 | FOOT | $0.00 | $0.00 | $2.37 | |
| 79 | 70400100 | TEMP CONC BARRIER | 400 | FOOT | $24.00 | $25.45 | $22.91 | |
| 80 | 70400200 | REL TEMP CONC BARRIER | 175 | FOOT | $3.00 | $4.21 | $15.26 | |
| 81 | 70600250 | IMP ATTN TEMP NRD TL3 | 2 | EACH | $3,800.00 | $2,027.98 | $8,160.00 | |
| 82 | 70600260 | IMP ATTN TEMP FRN TL3 | 1 | EACH | $7,200.00 | $4,583.70 | $8,160.00 | |
| 83 | 70600350 | IMP ATTN REL NRD TL3 | 1 | EACH | $650.00 | $431.75 | $1,749.64 | |
| 84 | 72501000 | TERMINAL MARKER - DA | 6 | EACH | $50.00 | $52.50 | $47.69 | |
| 85 | 78001110 | PAINT PVT MK LINE 4 | 1,357 | FOOT | $1.50 | $2.44 | $2.37 | |
| 86 | 78200005 | GRDRAIL REF TYPE A | 10 | EACH | $11.00 | $10.50 | $11.73 | |
| 87 | 78300200 | RAISED REF PVT MK REM | 10 | EACH | $45.00 | $10.02 | $20.71 | |
| 88 | 86200300 | UNINTER POWER SUP EXT | 1 | EACH | $2,500.00 | $495.00 | $2,295.00 |