Filtered by: County: Jefferson Clear all
| Let date | Contract / PPS | County / Division | Highway | Description | Estimate | Status | Low bidder | |
|---|---|---|---|---|---|---|---|---|
| Jan 19, 2018 | 78577 | FranklinJeffersonDistrict 9 | Crack sealing on 6 structures on I-57 in Franklin and Jefferson Counties. | — | Executed | E. T. Simonds Construction Company $110,873 · | ||
| Jan 19, 2018 | 78614 | FranklinJeffersonDistrict 9 | Cleaning and painting 9 bridges on I-57. | — | Executed | ERA-Valdivia Contractors, Inc. $1,214,294 · | ||
| Jan 19, 2018 | 78621 | HamiltonJeffersonWilliamsonDistrict 9 | Cleaning and painting portions of 3 structures. | — | Executed | Thomas Industrial Coatings, Inc. $165,153 · | ||
| Mar 9, 2018 | 78149 | JeffersonDistrict 9 | Removal and replacement of bridge SN 041-0036 carrying IL 37 over Atchison Creek, 8 miles south of IL 148. | — | Executed | E. T. Simonds Construction Company $1,588,926 · | ||
| Apr 27, 2018 | 99598 | JeffersonDistrict 9 | Resurfacing on CH 9 from I-64 to IL Route 15. | — | Executed | Southern Illinois Asphalt Co., Inc. $737,929 · | ||
| Jun 15, 2018 | 78326 | JeffersonDistrict 9 | Replace SN 041-0093 carrying IL 37 over a creek north of Ina with a double 10'x 9' box culvert. | — | Executed | E. T. Simonds Construction Company $582,865 · | ||
| Jun 15, 2018 | 78668 | JeffersonDistrict 9 | 7.3 miles of excavation and grading shoulders, safety shoulders and rumble strips on IL 37 from the Marion County line to Oakton Road. | — | Executed | Southern Illinois Asphalt Co., Inc. $1,299,802 · | ||
| Aug 3, 2018 | 78661 | JeffersonSalineDistrict 9 | Remove box culverts 041-7056 on IL 37 and 083-7059 on IL 142 and replace with elliptical pipes. | — | Executed | Haier Plumbing and Heating, Inc. $191,911 · | ||
| Jan 18, 2019 | 78455 | JeffersonDistrict 9 | Removal and replacement SN 041-055 carrying CH 42 over I-57 at Ina. | — | Executed | Sierra Bravo Contractors, LLC $2,683,572 · | ||
| Mar 8, 2019 | 99614 | JeffersonDistrict 9 | Resurfacing Log Cabin Lane from East Adams to Road to East Ina Road. | — | Executed | E. T. Simonds Construction Company $465,785 · | ||
| Apr 26, 2019 | 78461 | JeffersonDistrict 9 | Replacement of 2 structures on 1-57 over Atchison Creek, 2 miles north of Ina (SN 041-0001 and 041-0002) | — | Executed | The Kilian Corporation $7,123,315 · | ||
| Apr 26, 2019 | 99618 | JeffersonDistrict 9 | Resurfacing Marlow Road from IL 15 to Opdyke Road | — | Executed | Southern Illinois Asphalt Co., Inc. $382,099 · | ||
| Jun 14, 2019 | 78647 | JeffersonDistrict 9 | 10 MILES OF HIGH TENSION GUARDRAIL IN THE MEDIAN, EARTHWORK AND WEED CONTROL MOW STRIP ON I-57 FROM THE JEFFERSON COUNTY LINE TO JUST SOUTH OF THE TRI-LEVEL | — | Rejected | |||
| Jun 14, 2019 | 78712 | JeffersonDistrict 9 | 11 MILES OF PATCHING AND RESURFACING ON I-64 EASTBOUND FROM MILEPOST 62 (WASHINGTON COUNTY LINE) TO MILEPOST 73. | — | Executed | G. M. Sipes Construction, Inc. $569,048 · | ||
| Jun 14, 2019 | 78727 | JeffersonDistrict 9 | 1.3 miles of patching and resurfacing on IL 15 from just east of 44th Street to just west of 25th Street in Mt. Vernon. | — | Executed | Southern Illinois Asphalt Co., Inc. $1,845,801 · | ||
| Jun 14, 2019 | 78728 | FranklinJeffersonDistrict 9 | Patching and resurfacing on I-57 from 1 mile north of the West Frankfort interchange (MP 66) to Bonnie (MP 87.4). | — | Executed | E. T. Simonds Construction Company $4,645,456 · | ||
| Jun 14, 2019 | 78729 | JeffersonDistrict 9 | 3.6 MILES OF HMA SURFACE REMOVAL, INLAYING WITH HMA SURFACE AND BINDER COURSE, PAVEMENT PATCHING, HMA SHOULDERS, STRIPING AND REFLECTIVE PAVEMENT MARKERS ON IL 142 FROM IL 37 TO JUST PAST I-64. | — | Executed | Southern Illinois Asphalt Co., Inc. $1,784,771 · | ||
| Jun 14, 2019 | 99621 | JeffersonDistrict 9 | Resurfacing Riddle Lane from IL 15 East Dubois Road. | — | Executed | Microsurfacing Contractors, LLC, a Division of Byrne and Jones Holding Company $324,064 · | ||
| Jun 14, 2019 | 99626 | JeffersonDistrict 9 | Replace the structure carrying Richview Road over Pierce Creek, 3 miles south-southeast of Boyd. | — | Executed | E. T. Simonds Construction Company $678,298 · | ||
| Jul 12, 2019 | 78741 | JeffersonDistrict 9 | Resurfacing on IL 142 from I-64 to the Hamilton County line. | — | Executed | Southern Illinois Asphalt Co., Inc. $2,952,794 · | ||
| Aug 2, 2019 | 99623 | JeffersonDistrict 9 | Resurfacing Tolle Lane from Fairfield Road to Miller Lake Lane in Mt. Vernon. | — | Executed | Southern Illinois Asphalt Co., Inc. $958,187 · | ||
| Nov 8, 2019 | 78458 | JeffersonDistrict 9 | Replacement of the bridge carrying IL 15 over Elk Horn Creek, approximately 4.4 miles east of the Washington County line. (SN 041-0020) | — | Executed | Samron Midwest Contracting, Inc. $1,228,693 · | ||
| Nov 8, 2019 | 78732 | JeffersonWilliamsonDistrict 9 | Inserting culvert liners at three locations: 1) SN 100-7039 on IL 148 approximately 2 miles northwest of I-57 near Neber Road in Williamson County; 2) SN 041-7075 on IL 15 approximately 0.2 miles west of Shepherd Lane in Jefferson County; 3) SN 041-7076 on IL 15 approximately 0.3 miles east of Shepherd Lane in Jefferson County. | — | Executed | Samron Midwest Contracting, Inc. $219,125 · | ||
| Nov 8, 2019 | 78754 | JeffersonDistrict 9 | 4.4 miles of tree removal on IL 37 from just south of the Casey Fork to Campground Road, north of Bonnie. | — | Executed | Homer Tree Service, Inc. $157,128 · | ||
| Jan 17, 2020 | 78757 | JeffersonDistrict 9 | 4 miles of resurfacing, partial depth patching and raised reflective pavement markers on I-64 from the Washington County line (MP 62) to MP 66. | — | Executed | Samron Midwest Contracting, Inc. $434,416 · | ||
| Mar 6, 2020 | 78726 | JeffersonDistrict 9 | Patching SN 041-0016 and 041-0017 carrying I-57 over Southern Railroad, 0.25 miles north of Dix Exit 103. | — | Executed | E. T. Simonds Construction Company $463,426 · | ||
| Mar 6, 2020 | 78748 | JeffersonDistrict 9 | 10.3 miles of milling and resurfacing in IL 15 from Old Fairfield Road in Mt. Vernon to the Wayne County line. | — | Executed | Southern Illinois Asphalt Co., Inc. $3,915,872 · | ||
| Jun 12, 2020 | 78733 | JeffersonPerryDistrict 9 | Bridge repairs including deck/approach patching, shallow strip seals, substructure repairs, waterproofing and bituminous overlay on SN 041-0046 carrying IL 142 over ICRR in Jefferson County and SN 073-0023 carrying IL 152 over Beaucoup Creek in Perry County. | — | Executed | Samron Midwest Contracting, Inc. $408,447 · | ||
| Jun 12, 2020 | 78753 | JeffersonDistrict 9 | Bridge deck microsilica concrete overlay, approach slab replacements, joint reconstruction, bearing replacements, backwall replacements, slope wall repairs and floor drain extensions on SN 041-0060 carrying I-64 westbound (2nd level structure) over I-57 southbound at the north tri-level, north of Vernon. | — | Executed | E. T. Simonds Construction Company $648,215 · | ||
| Jun 12, 2020 | 78800 | JeffersonDistrict 9 | 3000' of pavement, shoulder, curb and gutter removal; PCC pavement (jointed); PCC shoulders; combination concrete curb and gutter; and pavement striping. | — | Executed | Samron Midwest Contracting, Inc. $608,452 · | ||
| Jun 12, 2020 | 99615 | JeffersonDistrict 9 | Replace the bridge carrying TR 1A over East Creek, 1.5 miles east of Boyd. | — | Executed | Dees, Inc. $210,784 · | ||
| Jul 31, 2020 | 78600 | JeffersonDistrict 9 | 4.2 miles of patching, milling, HMA surface, HMA shoulders and guardrail on I-57 from north of the northern tri-level in Jefferson County to 2 miles south of the Dix interchange. | — | Executed | Southern Illinois Asphalt Co., Inc. $5,210,684 · | ||
| Jul 31, 2020 | 78731 | JeffersonDistrict 9 | 1.3 miles of ADA ramp modifications, flashing left turn arrows, mast arm improvements to properly locate signal heads, controller upgrades and interconnect upgrades due to signal spacing on IL 15 from east of 44th Street to west of 25th Street in Mt. Vernon. | — | Executed | Brown Electric, Inc. $1,546,370 · | ||
| Jul 31, 2020 | 78807 | JeffersonDistrict 9 | 11 miles of patching, partial depth removal and partial depth patching on I-64 from the Washington County line to I-57 / I-64 Tri-level north of Mt. Vernon. | — | Executed | G. M. Sipes Construction, Inc. $450,914 · | ||
| Jul 31, 2020 | 99653 | JeffersonDistrict 9 | Resurfacing CH 8 from IL 15 to 5th Street in Bluford. | — | Executed | Southern Illinois Asphalt Co., Inc. $351,312 · | ||
| Sep 18, 2020 | 46454 | JeffersonJohnsonDistrict 9 | Repairing or replacing damaged or deteriorated overhead sign structures, overhead sign structure components and supports at various locations in Jefferson and Johnson Counties. | — | Executed | COLLINS & HERMANN, INC. $733,275 · | ||
| Mar 5, 2021 | 78804 | HamiltonJeffersonDistrict 9 | Bridge deck overlay and joint repair on SN 041-0040 and bridge deck overlays on SN 041-0041, 041-0042 and 033-0012; all on IL 142 in Jefferson and Hamilton Counties. | — | Executed | Samron Midwest Contracting, Inc. $514,157 · | ||
| Apr 23, 2021 | 78840 | JeffersonDistrict 9 | 0.9 miles of patching, milling and resurfacing on IL 15 from west of Sparrow Lane (west of I-57) to west of Davidson Avenue. | — | Executed | Samron Midwest Contracting, Inc. $719,781 · | ||
| Jun 11, 2021 | 78684 | JeffersonDistrict 9 | Replacing the 3-span bridge with a new triple, cast in place box culvert on IL 37, 1.2 miles south of IL 148. (SN 041-0031) | — | Executed | E. T. Simonds Construction Company $781,564 · | ||
| Jun 11, 2021 | 78846 | AlexanderJeffersonDistrict 9 | Replacing diaphragms on SN 041-0039 carrying IL 37 over Southern Railroad, 3 miles south of Dix and plating floor beams on SN 002-0009 on Old IL 3 over Sexton Creek in Gale. | — | Executed | E. T. Simonds Construction Company $141,043 · | ||
| Jun 11, 2021 | 78854 | JeffersonDistrict 9 | Patching on IL 15 in Mount Vernon from Zachery Street to 44th Street, I-57 NB and SB exit ramps at IL 15, and I-57 at MM 83 in the SB driving lane. | — | Executed | Kinney Contractors, Inc. $181,863 · | ||
| Jun 11, 2021 | 78870 | JeffersonWilliamsonDistrict 9 | PPC I-beam repair and substructure repairs on SN 041-0096 carrying IL 148 over over the Big Muddy River east of Waltonville in Jefferson County and PPC I-beam repair, deck patching and substructure repairs on SN 100-0072 carrying IL 37 over Crab Orchard Creek south of Marion in Williamson County. | — | Executed | Samron Midwest Contracting, Inc. $396,056 · | ||
| Jun 11, 2021 | 78883 | JeffersonDistrict 9 | Patching on I-64 from the Washington County line to the I-57 / I-64 Tri-Level, north of Mt. Vernon. | — | Executed | G. M. Sipes Construction, Inc. $216,264 · | ||
| Jul 30, 2021 | 78550 | JeffersonDistrict 9 | Remove and replace SN 041-0016 and 041-0017 carrying I-57 over Norfolk Southern Railway, 0.25 miles north of the Dix interchange; Remove and replace SN 041-0014 and 041-0015 carrying I-57 over CH 39 at the Dix interchange. | — | Executed | E. T. Simonds Construction Company $16,242,143 · | ||
| Jul 30, 2021 | 99668 | JeffersonDistrict 9 | Resurfacing and aggregate shoulders on East Divide Road from Harmony Lane to Papertown Lane. | — | Executed | Southern Illinois Asphalt Co., Inc. $1,035,795 · | ||
| Jan 21, 2022 | 78904 | JeffersonDistrict 9 | 5.8 miles of HMA surface removal, HMA resurfacing and patching on I-64 from 2.8 miles east of IL 142 to the Wayne County line. | — | Executed | Southern Illinois Asphalt Co., Inc. $6,780,606 · | ||
| Mar 11, 2022 | 78895 | JeffersonWilliamsonDistrict 9 | Bridge deck HMA overlay and joint replacement on SN 100-0054 carrying Cedar Grove Road over I-57, north of Marion; and pier repair and approach slab patching on SN041-0032 carrying IL 37 over Casey Fork, 2 miles south of IL 148. | — | Executed | E. T. Simonds Construction Company $269,455 · | ||
| Apr 29, 2022 | 78841 | JeffersonDistrict 9 | 145 feet of slope repair on the outside slope of northbound I-57, just north of IL 148. | — | Executed | Sierra Bravo Contractors, LLC $478,844 · | ||
| Jun 17, 2022 | 78940 | JeffersonDistrict 9 | 13.2 miles of patching on I-64 from the Washington County line to the north tri-level, north of Mt. Vernon and on I-57 from the north tri-level to Veteran's Drive. Project also includes deck slab repair on SN 041-0012 and 041-0013 on I-57. | — | Executed | Kinney Contractors, Inc. $426,244 · | ||
| Jun 17, 2022 | 99692 | JeffersonDistrict 9 | Resurfacing, HMA shoulders and rumble strips on Dix Irvington Road from east of US 51 to Boyd Road. | — | Rejected | Samron Midwest Contracting, Inc. $4,108,927 · | ||
| Aug 5, 2022 | 78956 | FranklinJeffersonDistrict 9 | Patching, milling and resurfacing on I-57 from 1.5 miles south of IL 154 to 1.25 miles north of the Campground Road overpass bridge. | — | Executed | E. T. Simonds Construction Company $1,169,133 · | ||
| Jan 20, 2023 | 78604 | JeffersonDistrict 9 | 10.8 miles of reconstruction/rehabilitation on I-64 from 0.3 miles east of Shiloh Road to just east of the Washington County line. | — | Executed | Plote Construction, Inc. $94,073,768 · | ||
| Jan 20, 2023 | 78963 | JeffersonDistrict 9 | Joint reconstruction with strip seals, bridge deck and structure repair, crack sealer, and waterproofing with HMA overlay on SN 041-0096 carrying IL 148 over Big Muddy River. | — | Executed | E. T. Simonds Construction Company $830,574 · | ||
| Jun 16, 2023 | 78917 | JeffersonDistrict 9 | Substructure and superstructure repairs on SN 041-0083 and SN 041-0084 carrying I-64 over CN/IC Railroad, east of the Belle River interchange. | — | Executed | E. T. Simonds Construction Company $1,602,470 · | ||
| Sep 22, 2023 | 99714 | JeffersonDistrict 9 | HMA overlay with HMA and Aggregate Shoulders, drainage improvements and signage on Richview Road from East Pleasant Road to North Shiloh Drive. | — | Executed | E. T. Simonds Construction Company $3,038,200 · | ||
| Mar 8, 2024 | 78A31 | JeffersonDistrict 9 | 0.85 miles of seal coating on Game Farm Road from IL 37 to the Game Farm entrance gate. | — | Executed | Illini Asphalt Corporation $63,398 · | ||
| Mar 8, 2024 | 78A34 | JeffersonDistrict 9 | 1.5 miles of patching, HMA surface removal, binder and surface courses on Old IL 37 from IL 37 on the north to IL 37 on the south. | — | Executed | E. T. Simonds Construction Company $763,684 · | ||
| Mar 8, 2024 | 78A46 | JeffersonDistrict 9 | 17.3 miles of patching, HMA surface removal and HMA resurfacing on IL 148 from the Franklin County line to 0.4 miles west of IL 37 in Mt. Vernon. | — | Executed | E. T. Simonds Construction Company $5,064,070 · | ||
| Apr 26, 2024 | 78A08 | HamiltonJeffersonDistrict 9 | Bridge repairs of SN 041-0062 on IL 142 over I-64, 1.5 miles southeast of Mt. Vernon and bridge repairs of SN 033-0038 on IL 14 over Sullivan Creek, 1.5 miles northeast of Macedonia. | — | Executed | Samron Midwest Contracting, Inc. $1,493,637 · | ||
| Apr 26, 2024 | 78A10 | JeffersonDistrict 9 | Bridge deck overlay on SN 041-0099 carrying IL 142 over Rock Branch, 1.4 miles southeast of Belle Rive; and bridge deck overlay on SN 041-0048 carrying IL 142 over Rocky Branch Tributary, 1.4 miles southeast of Belle Rive. | — | Executed | E. T. Simonds Construction Company $294,033 · | ||
| Apr 26, 2024 | 78A61 | JeffersonDistrict 9 | Patching of the ramps and parking lots at the eastbound and westbound Goshen Road Rest Areas on I-57. | — | Executed | Samron Midwest Contracting, Inc. $164,538 · | ||
| Apr 26, 2024 | 78A62 | FranklinJeffersonDistrict 9 | 9.8 miles of patching on I-57 from 2.5 miles south of IL 154 to Atchison Creek, south of Bonnie. | — | Executed | E. T. Simonds Construction Company $1,659,506 · | ||
| Jun 14, 2024 | 78885 | JeffersonDistrict 9 | Expanding approximately 6.4 miles of I-57 (north of the Atchison Creek Bridge, near mile marker 85 to the Tri-Level south of Mt. Vernon) by adding an additional lane in each direction, installing a median barrier, resurfacing the existing lanes, adding storm sewers and drainage structures, replacement of SN 041-0003 over Dodd-s Creek and overlay of SN 041-0005 over Casey Fork Creek. | — | Executed | E. T. Simonds Construction Company $51,942,477 · | ||
| Jun 14, 2024 | 78A28 | JeffersonWhiteDistrict 9 | Bridge repairs/rehabilitation at three locations: 1) SN 041-0051 carrying County Highway 10 (E. Richview Road) over I-57, 0.4 miles north of I-64; 2) SN 041-0053 carrying Township Road 1A (N. Old Centralia Lane) over I-57 in Jefferson County, 2.5 miles north of I-64; 3) SN 097-0045 carrying Township Road 214 (County Road 950 E) over I-64, 3 miles east of Burnt Prairie. | — | Executed | E. T. Simonds Construction Company $968,076 · | ||
| Jun 14, 2024 | 99733 | JeffersonDistrict 9 | Cold-in-Place recycling and resurfacing with aggregate shoulders on Old Fairfield Road from 0.2 mile west of Campground Lane to IL 15. | — | Executed | E. T. Simonds Construction Company $1,383,634 · | ||
| Aug 2, 2024 | 78911 | JeffersonDistrict 9 | Removal and replacement of an existing bridge with a triple barrel reinforced concrete box culvert and single barrel precast box culvert overflow structure on IL 15 west of Mt. Vernon. | — | Executed | Samron Midwest Contracting, Inc. $1,448,907 · | ||
| Nov 8, 2024 | 78A40 | JeffersonDistrict 9 | Resurfacing and ADA sidewalks upgrades on CH 39 (Dix Irving Road) from the I-57 ramps to IL 37 in Dix. | — | Executed | Samron Midwest Contracting, Inc. $575,913 · | ||
| Jan 17, 2025 | 78483 | JeffersonDistrict 9 | Reconstruction of the I-57/I-64 interchange and intersection modifications at various locations in Mt. Vernon. | — | Executed | E. T. Simonds Construction Company $38,661,329 · | ||
| Jan 17, 2025 | 78884 | FranklinJeffersonDistrict 9 | 9.7 miles of additional lane installation on I-57 from 2.5 miles south of IL 154 to Atchison Creek. Includes replacement of SN 028-0011 and SN 0028-0013. | — | Executed | E. T. Simonds Construction Company $104,503,286 · | ||
| Jan 17, 2025 | 99712 | JeffersonDistrict 9 | Resurfacing Old Fairfield Road from Stinson Drive to 0.2 mile west of Campground Lane in Mt. Vernon. | — | Executed | E. T. Simonds Construction Company $387,947 · | ||
| Mar 7, 2025 | 46942 | JeffersonDistrict 9 | Oil and chip, drainage and other improvements to the roads and parking lots near and within Rend Lake State Fish and Wildlife Area. | — | Executed | Illini Asphalt Corporation $1,020,559 · | ||
| Apr 25, 2025 | 78B08 | JeffersonDistrict 9 | 3.5 miles of HMA resurfacing on IL 37 from County Road 1500N outside of Mt. Vernon to SN 041-0039 carrying IL 37 over the Norfolk Southern Railroad. | — | Executed | E. T. Simonds Construction Company $2,371,499 · | ||
| Apr 25, 2025 | 78B11 | JeffersonDistrict 9 | 0.8 miles of resurfacing on IL 15 in Mt. Vernon. | — | Executed | E. T. Simonds Construction Company $963,345 · | ||
| Jun 13, 2025 | 78A72 | JeffersonDistrict 9 | 9.2 miles of patching and resurfacing on IL 15 from the Washington County line to 0.4 miles west of the Mt. Vernon west city limits. | — | Executed | E. T. Simonds Construction Company $2,283,905 · | ||
| Sep 19, 2025 | 78B70 | JeffersonDistrict 9 | 1.2 miles of pavement patching on I-64 ramps at Exit 89. | — | Executed | Samron Midwest Contracting, Inc. $145,862 · | ||
| Jan 16, 2026 | 78B84 | JeffersonDistrict 9 | Crack and joint sealing on I-57 from south of the north I-64 tri-level interchange to the Marion County line. | — | Executed | Complete Asphalt Service Co. $85,172 · | ||
| Jan 16, 2026 | 78B95 | JeffersonDistrict 9 | 1.9 miles of high-tension median cable guardrail at 3 locations on I-57 near the Dix interchange. | — | Executed | COLLINS & HERMANN, INC. $846,520 · | ||
| Jan 16, 2026 | 99762 | JeffersonDistrict 9 | HMA Resurfacing on North Pumphouse Lane from North Tolle Lane to George Street northeast of Mount Vernon. | — | Executed | E. T. Simonds Construction Company $287,612 · | ||
| Feb 27, 2026 | 78B34 | JeffersonDistrict 9 | Bridge deck overlay on 3 sets of dual bridges on I-64: 1) approximately 2 miles east of IL 142, 2) at the Belle Rive interchange, 3) approximately 0.6 miles east of IL 37. (SN 041-0087, 041-0088, 041-0071, 041-0072, 041-0080, and 041-0081) | — | Executed | E. T. Simonds Construction Company $5,793,218 · | ||
| Feb 27, 2026 | 78B52 | JeffersonDistrict 9 | Resurfacing on IL 37 from IL 15 to the north Mount Vernon city limits and on IL 37 from the Northfolk and Southern Railroad (SN 041-0039), 3.5 miles south of Dix, to the Marion County line. | — | Executed | E. T. Simonds Construction Company $4,988,975 · | ||
| Apr 24, 2026 | 78495 | JeffersonDistrict 9 | Replacement of existing box culverts (SN 041-7065 and 041-7066) carrying IL 15 over unnamed ditches near Panzier Lane. | — | Executed | Samron Midwest Contracting, Inc. $663,975 · | ||
| Jun 12, 2026 | 78B49 | JeffersonDistrict 9 | 0.4 miles of pavement removal with PCC replacement, aggregate subgrade improvement, shoulders, curb and gutter, median island and ramp pavement patching on I-64 from Bunny Farm Road to just past the I-64 westbound ramp. | — | Executed | Samron Midwest Contracting, Inc. $4,558,321 · | ||
| Jun 12, 2026 | 99771 | JeffersonDistrict 9 | HMA resurfacing of Tolle Rd. from E. Breezeway Rd. to N. Miller Lake Ln. in Jefferson County. | — | Executed | E. T. Simonds Construction Company $1,680,906 · | ||
| Jul 31, 2026 | 78520 | JeffersonDistrict 9 | 4.4 miles of milling, resurfacing, crown and superelevation corrections, safety shoulders, earthwork and drainage improvements on IL 37 from south of SN 041-0032, carrying IL 37 over the Casey Fork, to Campground Road north of Bonnie. | — | Executed | E. T. Simonds Construction Company $9,952,613 · | ||
| Jul 31, 2026 | 78935 | JeffersonDistrict 9 | Removal and replacement of SN 041-0043 carrying IL 142 over an unnamed creek 1.8 miles south of Mt. Vernon. | — | Executed | E. T. Simonds Construction Company $1,269,718 · |
1–85 of 85
Lettings: IDOT Transportation Bulletin (Notice of Letting and Contract Detail pages). Planned projects: IDOT Multi-Year Highway Improvement Program (roadway, structure and spot layers on the IDOT open data hub), listed by program year, not let date. "Added" is the first date Bid Potato saw the job. Always confirm against the official proposal before bidding.