D9 BRIDGE OVERLAY 2026-1
- Let date
- Friday, February 27, 2026
- Contract
- 78B34 · job page
- District
- District 9
- County
- Jefferson
- Highway
- Limits
- Bridge deck overlay on 3 sets of dual bridges on I-64: 1) approximately 2 miles east of IL 142, 2) at the Belle Rive interchange, 3) approximately 0.6 miles east of IL 37. (SN 041-0087, 041-0088, 041-0071, 041-0072, 041-0080, and 041-0081)
- Classification
- ·
- Project number
Bidders 2
| # | Contractor | Total bid | vs estimate | vs low |
|---|---|---|---|---|
| EE | Engineer's estimate | — | ||
| 1 | E. T. Simonds Construction Company Low bidder | $5,793,218 | ||
| 2 | Samron Midwest Contracting, Inc. | $5,967,786 | +3.0% |
| Seq | Bid code | Description | Qty | Unit | Estimate | #1 E. T. Simonds C… | #2 Samron Midwest … |
|---|---|---|---|---|---|---|---|
| 1 | X2503100 | MOWING | 150 | UNIT | $71.17 | $25.00 | |
| 2 | X4062952 | HMA STAB 6IN AT SPBGR | 36 | SQ YD | $198.41 | $500.00 | |
| 3 | X5030250 | BR DECK GROOVING LONG | 3,510 | SQ YD | $11.13 | $13.00 | |
| 4 | X5051206 | STRUCT STEEL REPAIR | 44,020 | POUND | $0.0100 | $0.0100 | |
| 5 | X5080530 | BAR TERMINATORS | 636 | EACH | $19.59 | $27.00 | |
| 6 | X5110312 | SLOPEWALL SLUR PUMPNG | 57.1 | CU YD | $644.68 | $480.00 | |
| 7 | X6062700 | CONC GUTTER TA SPL | 154 | FOOT | $53.50 | $76.00 | |
| 8 | X6320100 | GUARDRAIL REMOV SPL | 148 | FOOT | $29.36 | $9.00 | |
| 9 | X7010216 | TRAF CONT & PROT SPL | 1 | L SUM | $22,152.49 | $30,000.00 | |
| 10 | Z0001899 | JACK & REM EX BEARING | 48 | EACH | $840.65 | $500.00 | |
| 11 | Z0004552 | APPROACH SLAB REM | 473 | SQ YD | $64.86 | $30.00 | |
| 12 | Z0029090 | DIAMOND GRIND BR SEC | 5,108 | SQ YD | $14.47 | $14.00 | |
| 13 | Z0048665 | RR PROT LIABILITY INS | 1 | L SUM | $9,350.00 | $55,000.00 | |
| 14 | Z0049790 | RELOC NAME PLATES | 6 | EACH | $699.59 | $500.00 | |
| 15 | Z0073200 | TEMP SHORING & CRIB | 6 | EACH | $12,077.13 | $10,000.00 | |
| 16 | 20200600 | EXC & GR EX SHOULDER | 6 | UNIT | $1,182.70 | $1,500.00 | |
| 17 | 21400100 | GRADING & SHAP DITCH | 200 | FOOT | $9.13 | $25.00 | |
| 18 | 25000210 | SEEDING CL 2A | 0.5 | ACRE | $6,328.36 | $6,500.00 | |
| 19 | 25000400 | NITROGEN FERT NUTR | 30 | POUND | $1.73 | $5.00 | |
| 20 | 25000500 | PHOSPHORUS FERT NUTR | 30 | POUND | $1.73 | $5.00 | |
| 21 | 25000600 | POTASSIUM FERT NUTR | 30 | POUND | $1.73 | $5.00 | |
| 22 | 25100115 | MULCH METHOD 2 | 0.5 | ACRE | $4,292.40 | $652.00 | |
| 23 | 28000250 | TEMP EROS CONTR SEED | 30 | POUND | $16.85 | $5.00 | |
| 24 | 31101900 | SUB GRAN MAT C | 66 | TON | $81.05 | $35.00 | |
| 25 | 40600290 | BIT MATLS TACK CT | 2,390 | POUND | $0.0100 | $0.0100 | |
| 26 | 42000060 | WELDED WIRE REINF | 240 | SQ YD | $29.61 | $15.00 | |
| 27 | 42000080 | PVT CON PCC BR APP SL | 400 | SQ YD | $267.46 | $220.00 | |
| 28 | 44000100 | PAVEMENT REM | 79 | SQ YD | $30.24 | $50.00 | |
| 29 | 44000155 | HMA SURF REM 1 1/2 | 5,134 | SQ YD | $7.04 | $10.00 | |
| 30 | 44000400 | GUTTER REM | 114 | FOOT | $15.51 | $38.00 | |
| 31 | 44004250 | PAVED SHLD REMOVAL | 377 | SQ YD | $25.35 | $25.00 | |
| 32 | 48101200 | AGGREGATE SHLDS B | 29 | TON | $146.08 | $120.00 | |
| 33 | 48203100 | HMA SHOULDERS | 510 | TON | $208.16 | $275.00 | |
| 34 | 48300500 | PCC SHOULDERS 10 | 549 | SQ YD | $103.78 | $110.00 | |
| 35 | 50102400 | CONC REM | 154.8 | CU YD | $2,551.89 | $2,800.00 | |
| 36 | 50104000 | BRIDGE RAIL REMOVAL | 2,201 | FOOT | $12.17 | $10.00 | |
| 37 | 50157300 | PROTECTIVE SHIELD | 630 | SQ YD | $123.76 | $130.00 | |
| 38 | 50200100 | STRUCTURE EXCAVATION | 243 | CU YD | $50.47 | $50.00 | |
| 39 | 50300100 | FLOOR DRAINS | 92 | EACH | $501.38 | $900.00 | |
| 40 | 50300225 | CONC STRUCT | 75.7 | CU YD | $1,881.39 | $2,000.00 | |
| 41 | 50300255 | CONC SUP-STR | 169.1 | CU YD | $2,589.63 | $2,500.00 | |
| 42 | 50300300 | PROTECTIVE COAT | 6,501 | SQ YD | $1.39 | $3.50 | |
| 43 | 50301350 | CONC SUPSTR APP SLAB | 220.4 | CU YD | $667.71 | $750.00 | |
| 44 | 50500405 | F & E STRUCT STEEL | 8,800 | POUND | $6.33 | $8.00 | |
| 45 | 50800205 | REINF BARS, EPOXY CTD | 115,860 | POUND | $1.58 | $1.50 | |
| 46 | 50800515 | BAR SPLICERS | 764 | EACH | $47.29 | $48.00 | |
| 47 | 50900105 | ALUM RAILING TY L | 2,206 | FOOT | $226.59 | $245.00 | |
| 48 | 52000110 | PREF JT STRIP SEAL | 410 | FOOT | $296.22 | $240.00 | |
| 49 | 52100010 | ELAST BEARING ASSY T1 | 48 | EACH | $1,424.01 | $1,400.00 | |
| 50 | 52100510 | ANCHOR BOLTS 3/4 | 192 | EACH | $103.84 | $90.00 | |
| 51 | 52200010 | TEMP SHT PILING | 570 | SQ FT | $72.22 | $100.00 | |
| 52 | 53016001 | DECK SLAB REP (FD-T1) | 44 | SQ YD | $3,364.42 | $2,100.00 | |
| 53 | 53016002 | DECK SLAB REP (FD-T2) | 213 | SQ YD | $2,087.09 | $1,700.00 | |
| 54 | 53101010 | BR DECK SCAR 2 3/4 | 1,592 | SQ YD | $57.88 | $84.00 | |
| 55 | 53101011 | BR DECK SCAR 3" | 3,376 | SQ YD | $57.85 | $82.00 | |
| 56 | 53101611 | BR DK MIC C OVL 3" | 1,592 | SQ YD | $134.27 | $98.00 | |
| 57 | 53101612 | BR DK MIC C OVL 3 1/4 | 3,376 | SQ YD | $131.12 | $99.00 | |
| 58 | 53212754 | STR REP CON DP = < 5 | 36 | SQ FT | $568.61 | $300.00 | |
| 59 | 53212755 | STR REP CON DP OVER 5 | 11 | SQ FT | $630.03 | $310.00 | |
| 60 | 58600101 | GRANULAR BACKFILL STR | 250 | CU YD | $107.48 | $72.00 | |
| 61 | 59100100 | GEOCOMPOSITE WALL DR | 204 | SQ YD | $26.60 | $22.00 | |
| 62 | 59300100 | CONTR LOW-STRENG MATL | 0.1 | CU YD | $19,053.90 | $10,000.00 | |
| 63 | 60100060 | CONC HDWL FOR P DRAIN | 8 | EACH | $376.51 | $200.00 | |
| 64 | 60146304 | P UNDR FOR STRUCT 4 | 227 | FOOT | $32.07 | $25.00 | |
| 65 | 60602500 | CONCRETE GUTTER TY A | 280 | FOOT | $59.47 | $55.00 | |
| 66 | 63100085 | TRAF BAR TERM T6 | 4 | EACH | $7,381.50 | $8,000.00 | |
| 67 | 64200116 | SHOULDER RUM STRIP 16 | 5,609 | FOOT | $2.85 | $5.00 | |
| 68 | 67000400 | ENGR FIELD OFFICE A | 13 | CAL MO | $2,000.00 | $2,000.00 | |
| 69 | 67100100 | MOBILIZATION | 1 | L SUM | $396,571.40 | $350,000.00 | |
| 70 | 70100207 | TRAF CONT-PROT 701402 | 6 | EACH | $47,424.21 | $75,000.00 | |
| 71 | 70100420 | TRAF CONT-PROT 701411 | 1 | EACH | $4,835.06 | $15,000.00 | |
| 72 | 70100700 | TRAF CONT-PROT 701406 | 1 | L SUM | $14,742.53 | $10,000.00 | |
| 73 | 70103815 | TR CONT SURVEILLANCE | 33 | CAL DA | $0.0100 | $0.0100 | |
| 74 | 70107025 | CHANGEABLE MESSAGE SN | 84 | CAL DA | $69.87 | $75.00 | |
| 75 | 70300100 | SHORT TERM PAVT MKING | 1,410 | FOOT | $2.58 | $1.50 | |
| 76 | 70300150 | SHRT TRM PAVT MK REM | 476 | SQ FT | $4.33 | $4.00 | |
| 77 | 70300241 | TEMP PVT MK LINE 6 - PAINT | 30,874 | FOOT | $0.0100 | $0.0100 | |
| 78 | 70300251 | TEMP PVT MK LINE 8 - PAINT | 654 | FOOT | $0.0100 | $0.0100 | |
| 79 | 70400100 | TEMP CONC BARRIER | 3,302 | FOOT | $24.52 | $40.00 | |
| 80 | 70400125 | PIN TEMP CONC BARRIER | 36 | EACH | $57.79 | $25.00 | |
| 81 | 70400200 | REL TEMP CONC BARRIER | 3,139 | FOOT | $3.76 | $7.00 | |
| 82 | 70600251 | IMP ATTN TEMP NRN TL3 | 6 | EACH | $5,240.83 | $5,200.00 | |
| 83 | 70600352 | IMP ATTN REL NRN TL3 | 6 | EACH | $1,592.36 | $1,000.00 | |
| 84 | 78001110 | PAINT PVT MK LINE 4 | 1,266 | FOOT | $4.04 | $4.30 | |
| 85 | 78004630 | PREF PL PM TD STD L 6 | 30,874 | FOOT | $4.20 | $4.50 | |
| 86 | 78004640 | PREF PL PM TD STD L 8 | 654 | FOOT | $13.97 | $15.00 | |
| 87 | 78011035 | GRV RCSD PVT MRKG 7 | 30,874 | FOOT | $0.4800 | $0.5000 | |
| 88 | 78011045 | GRV RCSD PVT MRKG 9 | 654 | FOOT | $0.7200 | $0.6500 | |
| 89 | 78100100 | RAISED REFL PAVT MKR | 387 | EACH | $38.93 | $45.00 | |
| 90 | 78200005 | GRDRAIL REF TYPE A | 4 | EACH | $10.50 | $12.00 | |
| 91 | 78300200 | RAISED REF PVT MK REM | 329 | EACH | $18.95 | $80.00 | |
| 92 | 78300201 | PVT MKG REM GRINDING | 31,752 | SQ FT | $0.7400 | $0.0100 |