IDOT Jobs

All dates · 30 jobs · —
★ My Jobs

Filtered by: County: Peoria Clear all

30 jobs · — estimated

ExcelCSV
Let date Contract / PPS County / Division Highway Description Estimate Status Added Low bidder
Jan 17, 2025 68J38 PeoriaDistrict 4 Landscaping maintenance and installation along I-74 from Ellis St. to Illinois River in Peoria. Net length 7,286 ft. — Executed Nov 25 New JIMAX Landscape LLC $307,381 ·
Jan 17, 2025 89865 PeoriaDistrict 4 Construct a shared-use path along North Bradley Avenue from West Sycamore St. to East Cloverdale Avenue, and along East Cloverdale to South Ridgewood Drive in Chillicothe. — Executed Nov 25 New Advanced Asphalt Company $473,305 ·
Mar 7, 2025 68J19 MarshallPeoriaWoodfordDistrict 4 Crack and joint sealing at various locations in Peoria, Marshall, and Woodford Counties. — Executed Nov 25 New Denler, Inc. $858,085 ·
Apr 25, 2025 68J18 PeoriaDistrict 4 Resurfacing of US24/IL 9 from Kingston Mines to W of IL 9 (E). 5.78 miles. — Executed Nov 25 New Advanced Asphalt Company $9,772,668 ·
Apr 25, 2025 68K08 PeoriaDistrict 4 Replacing natural gas to electric generator along with concrete pad at Operations Peoria West Yard. — Executed Nov 25 New Laser Electric, Inc. $189,900 ·
Jun 13, 2025 68J80 PeoriaDistrict 4 Removal and replacement of traffic signal mast arms at US 150 (War Memorial Drive) and Allen Rd/Charter Oak Rd in Peoria. — Executed Nov 25 New Oberlander Electric Co. $239,436 ·
Jun 13, 2025 89869 PeoriaDistrict 4 Resurfacing on Cloverdale Road from west of White Clover Drive to IL 29 in Chillicothe. — Executed Nov 25 New R. A. Cullinan and Son, a div of UCM, Inc. $405,578 ·
Aug 1, 2025 68898 PeoriaDistrict 4 Bridge replacement of structure carrying IL 116 (Harmon Highway) over BNSF and UPRR/Kickapoo Creek. — Executed Nov 25 New ICC Group Inc. $23,160,000 ·
Aug 1, 2025 68B70 PeoriaDistrict 4 0.19 mile ramp widening for an additional left turn lane, traffic signal installation to replace temporary traffic signals, mill and overlay, drainage improvements at IL 40 (Knoxville Ave) and IL 6, Ramp D in Peoria. — Executed Nov 25 New Otto Baum Company, Inc. $1,750,000 ·
Sep 19, 2025 68J62 PeoriaDistrict 4 Resurfacing of IL 8 from East Kickapoo Creek to Main St in Peoria. 1.68 miles. — Executed Nov 25 New R. A. Cullinan and Son, a div of UCM, Inc. $2,699,505 ·
Sep 19, 2025 68K24 PeoriaDistrict 4 Upgrade HPS to LED luminaries along Interstate 74 (I-74) on existing light towers, light poles, and inside tunnels from Sterling Ave. in Peoria to Illinois River in Peoria County. — Executed Nov 25 New Laser Electric, Inc. $1,766,478 ·
Sep 19, 2025 68K25 PeoriaTazewellDistrict 4 Installation of LED luminaries along I-74 on existing light towers, light poles, and inside tunnels from Knoxville Interchange in Peoria to Washington St. Interchange in East Peoria in Peoria and Tazewell Counties. — Executed Nov 25 New Gerstner Electric, Inc. $1,018,866 ·
Nov 7, 2025 89872 PeoriaDistrict 4 Intersection improvements at Northmoor Road and University Street in Peoria. Includes; full-depth HMA, traffic signals, lighting, and storm sewer. — Executed Nov 25 New Otto Baum Company, Inc. $5,897,500 ·
Jan 16, 2026 68K52 PeoriaDistrict 4 1.38 miles of landscaping maintenance and installation along I-74 from Ellis St to the Illinois River. — Executed Nov 25 New JIMAX Landscape LLC $271,496 ·
Jan 16, 2026 89873 PeoriaDistrict 4 Construct a cast-in-place double barrel 10.5' x 10' PCC box culvert to carry Akron Road over a branch of Kickapoo Creek. Includes HMA paving, and landscape. — Executed Nov 25 New Otto Baum Company, Inc. $898,500 ·
Feb 27, 2026 68474 PeoriaDistrict 4 Resurfacing IL 6 from 0.7 mile north of Hoerr's Pond to south of I-74 in Peoria County. 4.2 miles gross length. — Executed Nov 25 New R. A. Cullinan and Son, a div of UCM, Inc. $25,863,073 ·
Feb 27, 2026 68J46 PeoriaDistrict 4 0.24 mile intersection improvement, Extended EP US 150 left-turn lane, widening for addition of SB right-turn lane, and change left-turn signal phasing from protected/permissive to protected only at the US 150 and West Willow Knolls Dr. intersection in Peoria County. — Executed Nov 25 New Otto Baum Company, Inc. $749,500 ·
Feb 27, 2026 68J51 PeoriaDistrict 4 316' bridge preservation project at SN 072-0169 carrying IL 8 (Southport Rd) over UPRR, 0.2 miles east of Reservoir Blvd in Peoria County. — Executed Nov 25 New Stark Excavating, Inc. $878,313 ·
Feb 27, 2026 68J57 PeoriaDistrict 4 7.53 miles of resurfacing on IL 90/IL 91 from IL 91(N) in Princeville to IL 91(S), north of Dunlap; and on IL 90 from the IL Rte 90/IL Rte 91 Junction (E) to IL Rte 40; and on SN 072-0035 carrying IL 90 over Kickapoo Creek Tributary. — Executed Nov 25 New Advanced Asphalt Company $5,129,210 ·
Feb 27, 2026 68K15 PeoriaDistrict 4 6.47 miles of resurfacing on IL 78 from west of US 150 to south of IL 8 in Peoria County. — Executed Nov 25 New R. A. Cullinan and Son, a div of UCM, Inc. $3,624,569 ·
Feb 27, 2026 68K16 PeoriaDistrict 4 3.53 miles of milling and resurfacing and all related collateral work along US Route 150 and IL Route 78 from 0.1 mile north of North Junction Illinois Route 78/US Route 150 to 0.1 mile north of Interstate 74 in Peoria County. — Executed Nov 25 New R. A. Cullinan and Son, a div of UCM, Inc. $3,332,964 ·
Apr 24, 2026 68J88 PeoriaDistrict 4 3.49 miles of resurfacing of IL 8 (W. Southport Rd) from 0.7 mile east of Taylor Rd to I-474 in Peoria County. — Executed Nov 25 New Advanced Asphalt Company $1,996,962 ·
Apr 24, 2026 68J89 PeoriaDistrict 4 6.5 miles of resurfacing and cold in-place recycling on IL 8 from Texas Rd to Taylor Rd in Peoria County. — Executed Nov 25 New Advanced Asphalt Company $4,472,093 ·
Jun 12, 2026 68C93 PeoriaDistrict 4 Resurfacing IL 6 from north of IL 29 to IL 40 (Knoxville Ave) in Peoria in Peoria County. 2.94 miles gross length. — Executed Nov 25 New Advanced Asphalt Company $10,996,119 ·
Jun 12, 2026 68J56 PeoriaDistrict 4 Resurface IL 116 (W. Harmon Highway, W. Lincoln Ave.) from Kickapoo Creek to Griswold St. in Peoria. 1.00 mile gross length. — Executed Nov 25 New R. A. Cullinan and Son, a div of UCM, Inc. $2,771,058 ·
Jun 12, 2026 68K85 PeoriaTazewellWarrenDistrict 4 Replacement of traffic signal heads and vehicle detection at various locations in Peoria, East Peoria, Washington, and Monmouth in Peoria, Tazewell, and Warren Counties. — Executed Nov 25 New Oberlander Electric Co. $790,676 ·
Jun 12, 2026 68K93 PeoriaTazewellDistrict 4 Relocation of high mast light towers to new foundations on I-74 in Peoria and Tazewell Counties. — Executed Nov 25 New Oberlander Electric Co. $1,451,503 ·
Jul 31, 2026 68L01 PeoriaDistrict 4 HMA patching and resurfacing of the intersection at_ IL91/Alta Rd in Peoria. Approximately 0.303 miles gross length. — Executed Nov 25 New R. A. Cullinan and Son, a div of UCM, Inc. $892,489 ·
Jul 31, 2026 68L02 PeoriaDistrict 4 HMA patching on IL 8/IL 78 from Il 8 to Main St in Elmwood. Approximately 0.53 miles gross length. — Executed Nov 25 New Advanced Asphalt Company $253,825 ·
Sep 18, 2026 68E86 PeoriaDistrict 4 Bridge replacement to SN 072-0123 at Closen Rd over I-474 in Bellevue. — Executed Nov 25 New Stark Excavating, Inc. $4,389,144 ·
1–30 of 30

Lettings: IDOT Transportation Bulletin (Notice of Letting and Contract Detail pages). Planned projects: IDOT Multi-Year Highway Improvement Program (roadway, structure and spot layers on the IDOT open data hub), listed by program year, not let date. "Added" is the first date Bid Potato saw the job. Always confirm against the official proposal before bidding.