Filtered by: County: Warren Clear all
| Let date | Contract / PPS | County / Division | Highway | Description | Estimate | Status | Low bidder | |
|---|---|---|---|---|---|---|---|---|
| Apr 25, 2025 | 68F43 | WarrenDistrict 4 | Designed overlay on US 34 from 0.1 mile west of 20th St to east of US 67 in Monmouth in Warren County. 7.09 miles gross. | — | Executed | Gunther Construction, a div of UCM, Inc. $9,337,044 · | ||
| Apr 25, 2025 | 68H42 | MercerWarrenDistrict 4 | Designed overlay along US 67 and IL 135 in Mercer and Warren Counties (>7 miles gross) and bridge preservation to SN 066-0016 carrying US 67 over Tom's Creek. | — | Executed | Gunther Construction, a div of UCM, Inc. $6,563,945 · | ||
| Apr 25, 2025 | 68J21 | WarrenDistrict 4 | PPP designed overlay on US 67 from north of 40th Ave and south end of BUS 67; SMART overlay on Roseville Bypass and north end of BUS 67, including IL 116 from 0.2 mile west to 0.2 mile east of US 67 west of Roseville. Approximately 6.65 miles gross length. | — | Executed | Gunther Construction, a div of UCM, Inc. $12,640,388 · | ||
| Apr 25, 2025 | 89780 | WarrenDistrict 4 | Pavement reconstruction on West Harlem Avenue from US 34 to North Main Street in Monmouth. | — | Executed | Brandt Construction Co. $2,855,658 · | ||
| Nov 7, 2025 | 68B60 | WarrenDistrict 4 | Rehabilitation and resurfacing of the existing pavement including vertical adjustments, curve adjustments, shoulder widening, guardrail replacement, culvert replacements and extensions, addition of turn lanes, and all other related collateral work necessary to complete the project located on US 67 (FAP 310) from south of 270th St to south of 220th St_in Monmouth. Nearly 6 mi. | — | Executed | Gunther Construction, a div of UCM, Inc. $35,946,274 · | ||
| Jan 16, 2026 | 89781 | WarrenDistrict 4 | Replace the bridge carrying CH 7 over Cedar Creek, 3.4 miles northeast of Monmouth. | — | Executed | County Contractors, Inc. $1,111,813 · | ||
| Apr 24, 2026 | 68K86 | HendersonWarrenDistrict 4 | Removal and replacement of various installations of guardrail in District 4 along Illinois Route 116 (FAP 665), Illinois Route 135 (FAP 546), and Illinois Routes 94/116 (FAP 534) at various locations in Henderson and Warren Counties. | — | Executed | COLLINS & HERMANN, INC. $879,375 · | ||
| Jun 12, 2026 | 68J50 | WarrenDistrict 4 | Resurfacing 20th St from US 34 to North St in Kirkwood and on North St from 20th St to US 34 in Kirkwood in Warren County. 1.823 gross miles. | — | Executed | Brandt Construction Co. $1,613,831 · | ||
| Jun 12, 2026 | 68K21 | WarrenDistrict 4 | Resurfacing BUS 67 from 0.5 mi. S. of 90th Ave., N. of Roseville to 0.4 mi. S. of 60th Ave., S. of Roseville. 2.79 miles gross length. | — | Executed | Gunther Construction, a div of UCM, Inc. $1,549,883 · | ||
| Jun 12, 2026 | 68K85 | PeoriaTazewellWarrenDistrict 4 | Replacement of traffic signal heads and vehicle detection at various locations in Peoria, East Peoria, Washington, and Monmouth in Peoria, Tazewell, and Warren Counties. | — | Executed | Oberlander Electric Co. $790,676 · |
1–10 of 10
Lettings: IDOT Transportation Bulletin (Notice of Letting and Contract Detail pages). Planned projects: IDOT Multi-Year Highway Improvement Program (roadway, structure and spot layers on the IDOT open data hub), listed by program year, not let date. "Added" is the first date Bid Potato saw the job. Always confirm against the official proposal before bidding.