The realignment and reconstruction of the mainline and interchange pavement and related roadway elements, incl
Executed(2,577-Ft) The work consists of the realignment and reconstruction of the mainline and interchange pavement and related roadway elements, including ramp and cross-road reconstruction, existing bridge removal, enclosed storm sewer system with drainage structures and detention ponds, earth excavation and embankment grading, installation of retaining and noise walls, barrier and moment slab construction, bridge replacement, roadway lighting, traffic signals ITS implementation, erosion and sediment
- Let date
- Friday, January 16, 2026
- Bids open
- Jan 16, 2026 12:00 PM
- District
- District 1
- County
- Will
- Letting item
- 184