(0404-1023K)C,BR 24
- Let date
- Friday, April 24, 2026
- Contract
- 62X31 · job page
- District
- District 1
- County
- Cook, Will
- Highway
- Limits
- (650-Ft) Two culverts (SN 016-2290 and SN 099-0541) will undergo routine maintenance and repairs. Items include structural repair of concrete on headwalls and the removal and replacement of a wingwall. This project is located at FAI Route 57 over Butterfield Creek (0.04 Miles North of Village Commons Drive) and FAI Route 57 over Culvert (0.38 Miles North of Harlem Ave)
- Classification
- ·
- Project number
Bidders 3
| # | Contractor | Total bid | vs estimate | vs low |
|---|---|---|---|---|
| EE | Engineer's estimate | — | ||
| 1 | D. Construction, Inc. Low bidder | $135,363 | ||
| 2 | MYS, Incorporated | $236,344 | +74.6% | |
| 3 | Lorig Construction Company | $268,793 | +98.6% |
| Seq | Bid code | Description | Qty | Unit | Estimate | #1 D. Construction… | #2 MYS, Incorporat… | #3 Lorig Construct… |
|---|---|---|---|---|---|---|---|---|
| 1 | X2010514 | SELECTIVE CLEARING | 0.5 | ACRE | $20,000.00 | $29,000.00 | $25,000.00 | |
| 2 | X2502024 | SEEDING CL 4B MOD | 0.5 | ACRE | $8,140.00 | $8,850.00 | $8,000.00 | |
| 3 | X2511630 | EROS CONT BLANKET SPL | 1,122 | SQ YD | $3.03 | $3.50 | $3.00 | |
| 4 | X5021512 | COFFERDAM TYP 1 IS WW | 2 | EACH | $0.0100 | $2,500.00 | $100.00 | |
| 5 | X7011015 | TR C-PROT EXPRESSWAYS | 1 | L SUM | $35,000.00 | $10,000.00 | $70,000.00 | |
| 6 | 28000400 | PERIMETER EROS BAR | 647 | FOOT | $5.12 | $6.00 | $6.00 | |
| 7 | 28100707 | STONE DUMP RIP CL A4 | 39 | SQ YD | $100.00 | $325.00 | $225.00 | |
| 8 | 50102400 | CONC REM | 2.9 | CU YD | $2,000.00 | $5,700.00 | $4,500.00 | |
| 9 | 50200100 | STRUCTURE EXCAVATION | 15 | CU YD | $150.00 | $570.00 | $250.00 | |
| 10 | 50300225 | CONC STRUCT | 3.5 | CU YD | $2,800.00 | $8,500.00 | $7,700.00 | |
| 11 | 50800205 | REINF BARS, EPOXY CTD | 730 | POUND | $7.50 | $12.50 | $6.50 | |
| 12 | 53212754 | STR REP CON DP = < 5 | 130 | SQ FT | $160.00 | $275.00 | $500.00 | |
| 13 | 58600101 | GRANULAR BACKFILL STR | 15 | CU YD | $90.00 | $525.00 | $275.00 | |
| 14 | 58700300 | CONCRETE SEALER | 135 | SQ FT | $3.00 | $8.00 | $5.00 | |
| 15 | 59000200 | EPOXY CRACK INJECTION | 15 | FOOT | $120.00 | $185.00 | $145.00 | |
| 16 | 63300575 | R&R RAIL ELEM EX GDRL | 200 | FOOT | $35.00 | $75.00 | $41.00 | |
| 17 | 66900200 | NON SPL WASTE DISPOSL | 50 | CU YD | $120.00 | $150.00 | $100.00 | |
| 18 | 66900530 | SOIL DISPOSAL ANALY | 2 | EACH | $1,750.00 | $2,000.00 | $1,500.00 | |
| 19 | 66901001 | REG SUB P-CONST PLAN | 1 | L SUM | $2,250.00 | $3,500.00 | $3,200.00 | |
| 20 | 66901003 | REG SUB F CON REPORT | 1 | L SUM | $2,250.00 | $3,000.00 | $1,200.00 | |
| 21 | 66901006 | REG SUB MON | 20 | CAL DA | $0.0100 | $1,250.00 | $550.00 | |
| 22 | 67100100 | MOBILIZATION | 1 | L SUM | $7,000.00 | $12,500.00 | $14,000.00 |