(122)BR,BR-1
Bidders 1
| # | Contractor | Total bid | vs estimate | vs low |
|---|---|---|---|---|
| EE | Engineer's estimate | — | ||
| 1 | D. Construction, Inc. Low bidder | $2,648,383 |
| Seq | Bid code | Description | Qty | Unit | Estimate | #1 D. Construction… |
|---|---|---|---|---|---|---|
| 1 | X0900064 | MEMBR WTRPR SYS B STR | 703 | SQ YD | $58.06 | |
| 2 | X1800010 | FURNISHING TREES | 1 | L SUM | $440.00 | |
| 3 | X2300017 | STL RAILING TY SM SPL | 54 | FOOT | $347.13 | |
| 4 | X4401198 | HMA SURF REM VAR DP | 712 | SQ YD | $13.00 | |
| 5 | Z0004560 | BRIDGE WEAR SURF REM | 100 | SQ YD | $80.00 | |
| 6 | Z0013798 | CONSTRUCTION LAYOUT | 1 | L SUM | $25,000.00 | |
| 7 | Z0034105 | MATL TRANSFER DEVICE | 615 | TON | $10.00 | |
| 8 | Z0054400 | ROCK FILL | 343 | CU YD | $52.50 | |
| 9 | Z0062458 | TEMP PAVEMT VAR DEPTH | 137 | TON | $185.00 | |
| 10 | 20100110 | TREE REMOV 6-15 | 279 | UNIT | $59.00 | |
| 11 | 20100210 | TREE REMOV OVER 15 | 382 | UNIT | $70.00 | |
| 12 | 20200100 | EARTH EXCAVATION | 3,455 | CU YD | $30.00 | |
| 13 | 20300100 | CHANNEL EXCAVATION | 794 | CU YD | $45.00 | |
| 14 | 20700220 | POROUS GRAN EMBANK | 737 | CU YD | $65.00 | |
| 15 | 21001000 | GEOTECH FAB F/GR STAB | 730 | SQ YD | $4.00 | |
| 16 | 21101615 | TOPSOIL F & P 4 | 9,086 | SQ YD | $7.50 | |
| 17 | 25000210 | SEEDING CL 2A | 2.25 | ACRE | $3,822.50 | |
| 18 | 25000400 | NITROGEN FERT NUTR | 203 | POUND | $2.20 | |
| 19 | 25000500 | PHOSPHORUS FERT NUTR | 203 | POUND | $2.20 | |
| 20 | 25000600 | POTASSIUM FERT NUTR | 203 | POUND | $2.20 | |
| 21 | 25100115 | MULCH METHOD 2 | 2.25 | ACRE | $880.00 | |
| 22 | 25100630 | EROSION CONTR BLANKET | 9,293 | SQ YD | $1.54 | |
| 23 | 28000250 | TEMP EROS CONTR SEED | 225 | POUND | $8.80 | |
| 24 | 28000305 | TEMP DITCH CHECKS | 152 | FOOT | $16.50 | |
| 25 | 28000400 | PERIMETER EROS BAR | 3,018 | FOOT | $2.92 | |
| 26 | 28000500 | INLET & PIPE PROTECT | 2 | EACH | $220.00 | |
| 27 | 28100207 | STONE RIPRAP CL A4 | 445 | TON | $65.00 | |
| 28 | 28100705 | STONE DUMP RIP CL A3 | 408 | SQ YD | $68.00 | |
| 29 | 28200200 | FILTER FABRIC | 428 | SQ YD | $5.00 | |
| 30 | 35501324 | HMA BASE CSE 10 | 598 | SQ YD | $75.00 | |
| 31 | 35600716 | HMA BC WID 10 | 1,414 | SQ YD | $75.00 | |
| 32 | 40200900 | AGG SURF CSE B | 30 | CU YD | $75.00 | |
| 33 | 40600275 | BIT MATLS PR CT | 1,404 | POUND | $0.0100 | |
| 34 | 40600295 | P BIT MATLS TACK CT | 2,454 | POUND | $0.0100 | |
| 35 | 40600982 | HMA SURF REM BUTT JT | 493 | SQ YD | $0.0100 | |
| 36 | 40600990 | TEMPORARY RAMP | 232 | SQ YD | $0.0100 | |
| 37 | 40603200 | P HMA BC IL-4.75 N50 | 232 | TON | $165.00 | |
| 38 | 40604060 | HMA SC IL-9.5 D N50 | 383 | TON | $150.00 | |
| 39 | 44000100 | PAVEMENT REM | 260 | SQ YD | $15.00 | |
| 40 | 44004250 | PAVED SHLD REMOVAL | 537 | SQ YD | $15.00 | |
| 41 | 48101200 | AGGREGATE SHLDS B | 707 | TON | $40.00 | |
| 42 | 48203029 | HMA SHOULDERS 8 | 115 | SQ YD | $60.00 | |
| 43 | 48203100 | HMA SHOULDERS | 139 | TON | $115.00 | |
| 44 | 50100100 | REM EXIST STRUCT | 2 | EACH | $35,000.00 | |
| 45 | 50105220 | PIPE CULVERT REMOV | 54 | FOOT | $30.00 | |
| 46 | 50200100 | STRUCTURE EXCAVATION | 1,526 | CU YD | $30.00 | |
| 47 | 50200450 | REM/DISP UNS MATL-STR | 343 | CU YD | $34.00 | |
| 48 | 50400205 | P P CONC DK BM 11 DP | 832 | SQ FT | $100.00 | |
| 49 | 50800205 | REINF BARS, EPOXY CTD | 124,120 | POUND | $2.25 | |
| 50 | 50800515 | BAR SPLICERS | 322 | EACH | $65.00 | |
| 51 | 51500100 | NAME PLATES | 2 | EACH | $700.00 | |
| 52 | 52200010 | TEMP SHT PILING | 687 | SQ FT | $40.00 | |
| 53 | 52200020 | TEMP SOIL RETEN SYSTM | 371 | SQ FT | $95.00 | |
| 54 | 54003000 | CONC BOX CUL | 641 | CU YD | $1,100.00 | |
| 55 | 542D0220 | P CUL CL D 1 15 | 98 | FOOT | $100.00 | |
| 56 | 54260515 | SLOP MET ES 15", 1:6 | 4 | EACH | $1,500.00 | |
| 57 | 63200310 | GUARDRAIL REMOV | 1,691 | FOOT | $6.41 | |
| 58 | 63301210 | REM RE-E SPBGR TY A | 500 | FOOT | $31.02 | |
| 59 | 63301215 | REM RE-E SPBGR TY B | 100 | FOOT | $46.37 | |
| 60 | 63301990 | REM RE-E T B TERM T1 | 4 | EACH | $13.20 | |
| 61 | 66600105 | FUR ERECT ROW MARKERS | 23 | EACH | $350.00 | |
| 62 | 66700205 | PERM SURV MKRS T1 | 2 | EACH | $1,200.00 | |
| 63 | 67000400 | ENGR FIELD OFFICE A | 10 | CAL MO | $4,250.00 | |
| 64 | 67100100 | MOBILIZATION | 1 | L SUM | $120,000.00 | |
| 65 | 70100405 | TRAF CONT-PROT 701321 | 2 | EACH | $25,000.00 | |
| 66 | 70100450 | TRAF CONT-PROT 701201 | 1 | L SUM | $10,000.00 | |
| 67 | 70100500 | TRAF CONT-PROT 701326 | 1 | L SUM | $7,000.00 | |
| 68 | 70103815 | TR CONT SURVEILLANCE | 5 | CAL DA | $450.00 | |
| 69 | 70106500 | TEMP BR TRAF SIGNALS | 2 | EACH | $35,000.00 | |
| 70 | 70107005 | PAVT MK BLKOUT TAPE 5 | 795 | FOOT | $2.31 | |
| 71 | 70107025 | CHANGEABLE MESSAGE SN | 28 | CAL DA | $100.00 | |
| 72 | 70300100 | SHORT TERM PAVT MKING | 4,113 | FOOT | $2.25 | |
| 73 | 70300150 | SHRT TRM PAVT MK REM | 3,618 | SQ FT | $3.00 | |
| 74 | 70307120 | TEMP PVT MK L4 T4 TAPE | 5,535 | FOOT | $2.00 | |
| 75 | 70307210 | TEMP PVT MK L24 T4 TAPE | 50 | FOOT | $2.00 | |
| 76 | 70400100 | TEMP CONC BARRIER | 750 | FOOT | $35.00 | |
| 77 | 70400125 | PIN TEMP CONC BARRIER | 72 | EACH | $20.00 | |
| 78 | 70400200 | REL TEMP CONC BARRIER | 1,200 | FOOT | $15.00 | |
| 79 | 70600250 | IMP ATTN TEMP NRD TL3 | 4 | EACH | $6,000.00 | |
| 80 | 70600350 | IMP ATTN REL NRD TL3 | 8 | EACH | $2,500.00 | |
| 81 | 78009004 | MOD URETH PM LINE 4 | 1,163 | FOOT | $3.25 | |
| 82 | 78009006 | MOD URETH PM LINE 6 | 2,950 | FOOT | $4.46 | |
| 83 | 78100100 | RAISED REFL PAVT MKR | 20 | EACH | $36.89 | |
| 84 | 78300200 | RAISED REF PVT MK REM | 20 | EACH | $12.00 |