D4 ELECTRICAL 2022
- Let date
- Friday, January 21, 2022
- Contract
- 68G75 · job page
- District
- District 4
- County
- Peoria, Tazewell
- Highway
- Limits
- Repair and replace traffic signals, overhead lighting, and ITS facilities at various locations in East Peoria, Peoria, Pekin and Peoria County.
Bidders 3
| # | Contractor | Total bid | vs estimate | vs low |
|---|---|---|---|---|
| EE | Engineer's estimate | — | ||
| 1 | Oberlander Electric Co. Low bidder | $301,890 | ||
| 2 | Laser Electric, Inc. | $314,688 | +4.2% | |
| 3 | Bodine Electric of Decatur | $322,631 | +6.9% |
| Seq | Bid code | Description | Qty | Unit | Estimate | #1 Oberlander Elec… | #2 Laser Electric,… | #3 Bodine Electric… |
|---|---|---|---|---|---|---|---|---|
| 1 | X0322281 | W A VID DET SYS COM | 6 | EACH | $20,925.00 | $21,171.00 | $22,634.21 | |
| 2 | X0326812 | CAT 5 ETHERNET CABLE | 1,099 | FOOT | $2.40 | $2.55 | $2.58 | |
| 3 | X0327216 | CCTV CAMERA | 1 | EACH | $4,545.00 | $5,375.00 | $5,383.97 | |
| 4 | X1400434 | DIL ZONE DET SYS | 6 | EACH | $8,120.00 | $8,193.00 | $8,468.45 | |
| 5 | X7010216 | TRAF CONT & PROT SPL | 1 | L SUM | $3,000.00 | $8,000.00 | $4,998.00 | |
| 6 | X8630104 | CONT CAB TYPE IV SPL | 1 | EACH | $1,050.00 | $2,800.00 | $2,822.54 | |
| 7 | X8710029 | FIB OPT CBL 24F SM | 1,404 | FOOT | $2.90 | $6.00 | $5.70 | |
| 8 | Z0033068 | TS BATT BACKUP SYSTEM | 16 | EACH | $5,700.80 | $5,295.00 | $5,480.42 | |
| 9 | 67100100 | MOBILIZATION | 1 | L SUM | $9,250.00 | $15,100.00 | $9,982.94 | |
| 10 | 81028370 | UNDRGRD C PVC 3 | 12 | FOOT | $131.00 | $33.45 | $31.38 | |
| 11 | 81702130 | EC C XLP USE 1C 6 | 612 | FOOT | $2.50 | $2.60 | $2.58 | |
| 12 | 87301225 | ELCBL C SIGNAL 14 3C | 245.5 | FOOT | $1.95 | $1.70 | $1.78 | |
| 13 | 87301245 | ELCBL C SIGNAL 14 5C | 809 | FOOT | $1.80 | $2.00 | $2.19 | |
| 14 | 87301255 | ELCBL C SIGNAL 14 7C | 339.5 | FOOT | $2.85 | $2.55 | $2.66 | |
| 15 | 87301900 | ELCBL C EGRDC 6 1C | 332 | FOOT | $3.00 | $3.25 | $3.05 | |
| 16 | 87800200 | CONC FDN TY D | 3.5 | FOOT | $515.00 | $600.00 | $497.56 | |
| 17 | 87900200 | DRILL EX HANDHOLE | 2 | EACH | $330.00 | $475.00 | $566.92 | |
| 18 | 89502375 | REMOV EX TS EQUIP | 1 | EACH | $1,390.00 | $875.07 | $4,913.95 | |
| 19 | 89502385 | REMOV EX CONC FDN | 1 | EACH | $999.99 | $1,385.00 | $433.70 |