IDOT Jobs

All dates · 18 jobs · — Sign up free
★ My Jobs

Filtered by: County: Peoria, Tazewell Clear all

18 jobs · — estimated

ExcelCSV
Let date Contract / PPS County / Division Highway Description Estimate Status Added Low bidder
Mar 9, 2018 68D16 PeoriaTazewellDistrict 4 Resurfacing on I-74 from Washington St. to Muller Road, from Morton Ave. to Mainstreet, from Sterling Ave. to the Union Pacific Railroad structure. Also, resurfacing on I-474 Roadway A and B in Peoria. — Executed Nov 26 New Advanced Asphalt Company $6,988,434 ·
Jun 15, 2018 68E39 PeoriaTazewellDistrict 4 Installation of turn signals, luminaires, light poles, lighting controller and relocation of existing railroad interconnected traffic signal controller cabinet at various locations. — Executed Nov 26 New Laser Electric, Inc. $183,757 ·
Jun 14, 2019 68D99 PeoriaTazewellDistrict 4 TEMPORARY SIGNUNG FOR I-74 CLOSURE AND DETOUR ROUTES FOR THE MURRAY BAKER BRIDGE REHABILITATION PROJECT. — Executed Nov 26 New T.M.F. Construction Company $824,481 ·
Jun 14, 2019 68E71 PeoriaTazewellDistrict 4 DETOUR ROUTE PREPARATION, INCLUDING TEMPORARY PAVEMENT AND MISCELLANEOUS ELECTRICAL WORK, ALONG IL RTE 40 IN PEORIA AND EAST PEORIA FOR MURRAY BAKER REHABILITATION PROJECT. — Executed Nov 26 New Otto Baum Company, Inc. $1,476,305 ·
Sep 20, 2019 68E16 PeoriaTazewellDistrict 4 CULVERT LINING ON VARIOUS ROUTES WITHIN PEORIA AND TAZEWELL COUNTIES. — Executed Nov 26 New Hoerr Construction, Inc. $769,350 ·
Sep 20, 2019 68E53 PeoriaTazewellDistrict 4 CONSTRUCTION, REPLACEMENT OR CROSSWALKS ALONG IL 29 (ADAMS and JEFFERSON ST) FROM HANCOCK ST TO WAYNE STREET IN PEORIA, IL 8 FROM CHERRY LANE TO MEADOWVIEW LN IN SUNNYLAND, IL 8 AT LEGION RD AND BUS 24 AT BONDURANT ST IN WASHINGTON. — Executed Nov 26 New Otto Baum Company, Inc. $537,618 ·
Mar 6, 2020 68E72 PeoriaTazewellDistrict 4 Installation of dynamic message signs and associated work at four locations along I-74. — Executed Nov 26 New Western Remac, Inc. $1,157,885 ·
Apr 24, 2020 68F20 PeoriaTazewellDistrict 4 Replacement of traffic signal mast arms at various locations in Peoria and Tazewell Counties. — Executed Nov 26 New Oberlander Electric Co. $374,200 ·
Nov 6, 2020 68G05 PeoriaTazewellDistrict 4 Replacement of existing video detection systems at various locations in Peoria various locations in Peoria and Tazewell Counties in District Four. — Executed Nov 26 New Oberlander Electric Co. $406,250 ·
Apr 23, 2021 68G21 PeoriaTazewellDistrict 4 Installation of new traffic signal cabinets, traffic signal controllers, communications equipment, and video detection systems at various locations in District Four. — Executed Nov 26 New Laser Electric, Inc. $482,887 ·
Jan 21, 2022 68G75 PeoriaTazewellDistrict 4 Repair and replace traffic signals, overhead lighting, and ITS facilities at various locations in East Peoria, Peoria, Pekin and Peoria County. — Executed Nov 26 New Oberlander Electric Co. $301,890 ·
Mar 11, 2022 68G28 PeoriaTazewellDistrict 4 Crack and Joint Sealing on US 24/IL 9 from N of Pfeiffer Rd in Bartonville to 0.16 mi SW of IL 9 (E.) and on IL 29 from Margaret Drive in Creve Coeur to N of LaSalle BLVD in Marquette Heights. — Executed Nov 26 New Denler, Inc. $214,975 ·
Nov 18, 2022 68F38 PeoriaTazewellDistrict 4 Bridge Rehabilitation with bridge deck overlay, beam repairs, beam additions, navigation and roadway lighting, traffic signal improvements, drainage improvements, full depth pavement removal and replacement, sidewalk removals, multi-use path construction and related collateral work. Bob Michel Bridge (SN 090-0122) in Peoria and Tazewell Counties on IL 40 (William Kumpf Blvd.) over the Illinois River and Washington Street. — Executed Nov 26 New ICC Group Inc. $24,657,000 ·
Mar 10, 2023 68H21 PeoriaTazewellDistrict 4 Crack and joint sealing at various locations along 1-74 and 1-474 in Peoria and Tazewell Counties. — Executed Nov 26 New Complete Asphalt Service Co. $224,649 ·
Jun 14, 2024 68J24 PeoriaTazewellDistrict 4 D4 highway lighting 2025: Inspection of existing high mast towers, luminaire repair and re-lamping, maintenance of existing lighting controllers in Peoria and Tazewell Counties. — Executed Nov 26 New Laser Electric, Inc. $516,745 ·
Sep 19, 2025 68K25 PeoriaTazewellDistrict 4 Installation of LED luminaries along I-74 on existing light towers, light poles, and inside tunnels from Knoxville Interchange in Peoria to Washington St. Interchange in East Peoria in Peoria and Tazewell Counties. — Executed Nov 25 New Gerstner Electric, Inc. $1,018,866 ·
Jun 12, 2026 68K85 PeoriaTazewellWarrenDistrict 4 Replacement of traffic signal heads and vehicle detection at various locations in Peoria, East Peoria, Washington, and Monmouth in Peoria, Tazewell, and Warren Counties. — Executed Nov 25 New Oberlander Electric Co. $790,676 ·
Jun 12, 2026 68K93 PeoriaTazewellDistrict 4 Relocation of high mast light towers to new foundations on I-74 in Peoria and Tazewell Counties. — Executed Nov 25 New Oberlander Electric Co. $1,451,503 ·
1–18 of 18

Lettings: IDOT Transportation Bulletin (Notice of Letting and Contract Detail pages). Planned projects: IDOT Multi-Year Highway Improvement Program (roadway, structure and spot layers on the IDOT open data hub), listed by program year, not let date. "Added" is the first date Bid Potato saw the job. Always confirm against the official proposal before bidding.