Filtered by: County: Peoria, Tazewell Clear all
| Let date | Contract / PPS | County / Division | Highway | Description | Estimate | Status | Low bidder | |
|---|---|---|---|---|---|---|---|---|
| Mar 9, 2018 | 68D16 | PeoriaTazewellDistrict 4 | Resurfacing on I-74 from Washington St. to Muller Road, from Morton Ave. to Mainstreet, from Sterling Ave. to the Union Pacific Railroad structure. Also, resurfacing on I-474 Roadway A and B in Peoria. | — | Executed | Advanced Asphalt Company $6,988,434 · | ||
| Jun 15, 2018 | 68E39 | PeoriaTazewellDistrict 4 | Installation of turn signals, luminaires, light poles, lighting controller and relocation of existing railroad interconnected traffic signal controller cabinet at various locations. | — | Executed | Laser Electric, Inc. $183,757 · | ||
| Jun 14, 2019 | 68D99 | PeoriaTazewellDistrict 4 | TEMPORARY SIGNUNG FOR I-74 CLOSURE AND DETOUR ROUTES FOR THE MURRAY BAKER BRIDGE REHABILITATION PROJECT. | — | Executed | T.M.F. Construction Company $824,481 · | ||
| Jun 14, 2019 | 68E71 | PeoriaTazewellDistrict 4 | DETOUR ROUTE PREPARATION, INCLUDING TEMPORARY PAVEMENT AND MISCELLANEOUS ELECTRICAL WORK, ALONG IL RTE 40 IN PEORIA AND EAST PEORIA FOR MURRAY BAKER REHABILITATION PROJECT. | — | Executed | Otto Baum Company, Inc. $1,476,305 · | ||
| Sep 20, 2019 | 68E16 | PeoriaTazewellDistrict 4 | CULVERT LINING ON VARIOUS ROUTES WITHIN PEORIA AND TAZEWELL COUNTIES. | — | Executed | Hoerr Construction, Inc. $769,350 · | ||
| Sep 20, 2019 | 68E53 | PeoriaTazewellDistrict 4 | CONSTRUCTION, REPLACEMENT OR CROSSWALKS ALONG IL 29 (ADAMS and JEFFERSON ST) FROM HANCOCK ST TO WAYNE STREET IN PEORIA, IL 8 FROM CHERRY LANE TO MEADOWVIEW LN IN SUNNYLAND, IL 8 AT LEGION RD AND BUS 24 AT BONDURANT ST IN WASHINGTON. | — | Executed | Otto Baum Company, Inc. $537,618 · | ||
| Mar 6, 2020 | 68E72 | PeoriaTazewellDistrict 4 | Installation of dynamic message signs and associated work at four locations along I-74. | — | Executed | Western Remac, Inc. $1,157,885 · | ||
| Apr 24, 2020 | 68F20 | PeoriaTazewellDistrict 4 | Replacement of traffic signal mast arms at various locations in Peoria and Tazewell Counties. | — | Executed | Oberlander Electric Co. $374,200 · | ||
| Nov 6, 2020 | 68G05 | PeoriaTazewellDistrict 4 | Replacement of existing video detection systems at various locations in Peoria various locations in Peoria and Tazewell Counties in District Four. | — | Executed | Oberlander Electric Co. $406,250 · | ||
| Apr 23, 2021 | 68G21 | PeoriaTazewellDistrict 4 | Installation of new traffic signal cabinets, traffic signal controllers, communications equipment, and video detection systems at various locations in District Four. | — | Executed | Laser Electric, Inc. $482,887 · | ||
| Jan 21, 2022 | 68G75 | PeoriaTazewellDistrict 4 | Repair and replace traffic signals, overhead lighting, and ITS facilities at various locations in East Peoria, Peoria, Pekin and Peoria County. | — | Executed | Oberlander Electric Co. $301,890 · | ||
| Mar 11, 2022 | 68G28 | PeoriaTazewellDistrict 4 | Crack and Joint Sealing on US 24/IL 9 from N of Pfeiffer Rd in Bartonville to 0.16 mi SW of IL 9 (E.) and on IL 29 from Margaret Drive in Creve Coeur to N of LaSalle BLVD in Marquette Heights. | — | Executed | Denler, Inc. $214,975 · | ||
| Nov 18, 2022 | 68F38 | PeoriaTazewellDistrict 4 | Bridge Rehabilitation with bridge deck overlay, beam repairs, beam additions, navigation and roadway lighting, traffic signal improvements, drainage improvements, full depth pavement removal and replacement, sidewalk removals, multi-use path construction and related collateral work. Bob Michel Bridge (SN 090-0122) in Peoria and Tazewell Counties on IL 40 (William Kumpf Blvd.) over the Illinois River and Washington Street. | — | Executed | ICC Group Inc. $24,657,000 · | ||
| Mar 10, 2023 | 68H21 | PeoriaTazewellDistrict 4 | Crack and joint sealing at various locations along 1-74 and 1-474 in Peoria and Tazewell Counties. | — | Executed | Complete Asphalt Service Co. $224,649 · | ||
| Jun 14, 2024 | 68J24 | PeoriaTazewellDistrict 4 | D4 highway lighting 2025: Inspection of existing high mast towers, luminaire repair and re-lamping, maintenance of existing lighting controllers in Peoria and Tazewell Counties. | — | Executed | Laser Electric, Inc. $516,745 · | ||
| Sep 19, 2025 | 68K25 | PeoriaTazewellDistrict 4 | Installation of LED luminaries along I-74 on existing light towers, light poles, and inside tunnels from Knoxville Interchange in Peoria to Washington St. Interchange in East Peoria in Peoria and Tazewell Counties. | — | Executed | Gerstner Electric, Inc. $1,018,866 · | ||
| Jun 12, 2026 | 68K85 | PeoriaTazewellWarrenDistrict 4 | Replacement of traffic signal heads and vehicle detection at various locations in Peoria, East Peoria, Washington, and Monmouth in Peoria, Tazewell, and Warren Counties. | — | Executed | Oberlander Electric Co. $790,676 · | ||
| Jun 12, 2026 | 68K93 | PeoriaTazewellDistrict 4 | Relocation of high mast light towers to new foundations on I-74 in Peoria and Tazewell Counties. | — | Executed | Oberlander Electric Co. $1,451,503 · |
1–18 of 18
Lettings: IDOT Transportation Bulletin (Notice of Letting and Contract Detail pages). Planned projects: IDOT Multi-Year Highway Improvement Program (roadway, structure and spot layers on the IDOT open data hub), listed by program year, not let date. "Added" is the first date Bid Potato saw the job. Always confirm against the official proposal before bidding.