‹ All IDOT jobs My Jobs
Job
ExecutedConverting the existing two-way stop controlled condition to all-way stop control with red-flashing beacons, stop ahead signs with dual flashing beacons, lighting upgrades, widening the radii at the intersection, construction of 4-foot wide Hot-Mix Asphalt shoulder along the curve radii with 2-foot aggregate wedge shoulders, new pavement marking, removing and replacing an 18-inch pipe culvert and related collateral work necessary to complete the project. This project is located at the intersecti
- Let date
- Friday, September 18, 2026
- Bids open
- Sep 18, 2026 12:00 PM
- District
- District 4
- County
- Tazewell
- Letting item
- 049
- Added
- Nov 25, 2026 No longer listed