IDOT Jobs

All dates · 878 jobs · $2,122,483,000 Sign up free
★ My Jobs

Filtered by: District: District 4 Clear all

878 jobs · $2,122,483,000 estimated

ExcelCSV
Let date Contract / PPS County / Division Highway Description Estimate Status Added Low bidder
Jan 19, 2018 68B67 PeoriaDistrict 4 Resurfacing on US 24 from south of IL 9 to north of Pfeiffer Road and on IL 9 from US 24 to 0.27 miles east. — Executed Nov 26 New Advanced Asphalt Company $3,038,514 ·
Jan 19, 2018 68D90 VariousDistrict 4 District wide weed spraying. — Executed Nov 26 New The Daltons Inc. $213,068 ·
Jan 19, 2018 72K18 LoganTazewellDistrict 4 Bituminous surface treatment A-2 and leveling binder on Armington Road from Monroe Street in Armington to US 136 and on Old IL 121 (CR 2500 E) from US 136 to the Tazewell County line. — Executed Nov 26 New Beniach Construction Co., Inc. $353,547 ·
Jan 19, 2018 89664 KnoxDistrict 4 Roadway reconstruction on FAS 393(CH4) from CH 15 to IL 17. — Executed Nov 26 New Halverson Construction Co., Inc. $4,167,747 ·
Jan 19, 2018 89699 KnoxDistrict 4 Rehabilitate the bridge carrying Farnham Street over the BNSF Railroad, 0.3 mile north of East Main Street in Galesburg. — Executed Nov 26 New Sangamo Construction Company $2,191,737 ·
Jan 19, 2018 89709 PeoriaDistrict 4 Reconstruction of Old Galena Road between Boy Scout Road and Cedar Hills Drive, including new traffic signals at Cedar Hills Drive. — Executed Nov 26 New R. A. Cullinan and Son, a div of UCM, Inc. $3,759,289 ·
Jan 19, 2018 89734 MercerDistrict 4 Bridge replacement including minor approach roadway work on FAS 212 (CH 9) at Camp Creek, located 1.8 miles north of Joy. — Executed Nov 26 New Curnyn Construction Co. $669,974 ·
Mar 9, 2018 68339 KnoxWarrenDistrict 4 7.52 miles of resurfacing and bridge rehabilitation on US 34/IL 110 from west of Cameron Road to IL Route 164. — Executed Nov 26 New Gunther Construction, a div of UCM, Inc. $13,135,975 ·
Mar 9, 2018 68887 PeoriaDistrict 4 Bridge rehabilitation to structure numbers: 072-0127, 072-0128, 072-0129, 072-0130, 072-0131 and 072-0132. — Executed Nov 26 New Stark Excavating, Inc. $11,778,628 ·
Mar 9, 2018 68D15 PeoriaDistrict 4 Patching, resurfacing, ADA ramp improvements and signal upgrades on IL 40 from West Corrington Ave. to Pennsylavania Ave. in Peoria. — Executed Nov 26 New R. A. Cullinan and Son, a div of UCM, Inc. $2,429,480 ·
Mar 9, 2018 68D16 PeoriaTazewellDistrict 4 Resurfacing on I-74 from Washington St. to Muller Road, from Morton Ave. to Mainstreet, from Sterling Ave. to the Union Pacific Railroad structure. Also, resurfacing on I-474 Roadway A and B in Peoria. — Executed Nov 26 New Advanced Asphalt Company $6,988,434 ·
Mar 9, 2018 68D94 FultonMcDonoughDistrict 4 26 miles of microsurfacing and cape seal at 4 locations on US 24, IL 100 and US 136. — Executed Nov 26 New A. C. Pavement Striping Co. $1,684,358 ·
Mar 9, 2018 68E04 PeoriaPutnamTazewellDistrict 4 31 miles of crack and joint sealing on US 150, IL 26 and I-155. — Executed Nov 26 New Complete Asphalt Service Co. $164,160 ·
Mar 9, 2018 68E06 PeoriaDistrict 4 Landscaping along I-74 from Ellis Street in Peoria to the Illinois River. — Executed Nov 26 New Central Landscaping, LP $88,972 ·
Mar 9, 2018 89702 MarshallDistrict 4 Removal and replacement of the bridge carrying CH 3 over the South Branch of Crow Creek, 1 mile south of La Rose. — Executed Nov 26 New Stark Excavating, Inc. $878,127 ·
Mar 9, 2018 89726 StarkDistrict 4 Bituminous surface treatment at various locations in Stark County. — Executed Nov 26 New Pavement Maintenance Services, Inc. $333,629 ·
Mar 9, 2018 89736 StarkDistrict 4 Replace the bridge carrying CH 8 over an unnamed tributary of the West Fork River, 2 miles northwest of Osceola. — Executed Nov 26 New Curnyn Construction Co. $264,241 ·
Apr 27, 2018 46494 VariousDistrict 4 Placing epoxy and modified urethane pavement marking lines, letters and symbols and the removal of existing pavement markings as specified by individual work orders. — Executed Nov 26 New ROADSAFE TRAFFIC SYSTEMS, INC. $1,424,915 ·
Apr 27, 2018 46495 VariousDistrict 4 Replacing damaged raised reflective pavement markers on various highways throughout Districts 4 and as directed by the Engineer. — Rejected Nov 26 New P & P Construction Co. $945,307 ·
Apr 27, 2018 68215 McDonoughDistrict 4 Reconstruction of two-lane SN 055-0015 carrying IL 9 over the north fork of the LaMoine River, 2.0 miles west of Bushnell. — Executed Nov 26 New Sangamo Construction Company $2,307,568 ·
Apr 27, 2018 68637 HenryDistrict 4 Remove and replace bridge SN 037-0072 carrying IL 78 over Indian Creek, 0.4 mile south of US 34 near Kewanee. — Executed Nov 26 New Halverson Construction Co., Inc. $1,809,709 ·
Apr 27, 2018 68895 StarkDistrict 4 Replace bridge SN 088-0001 carrying IL 17 over Indian Creek, 0.3 mil west of Toulon. — Executed Nov 26 New Stark Excavating, Inc. $2,035,628 ·
Apr 27, 2018 68A79 McLeanTazewellWoodfordDistrict 4 10.97 miles of pavement rubblization, overlay and new pavement construction with drainage and bridge work from west of the Tazell county line near Deer Creek to east of the Carlock interchange. — Executed Nov 26 New Rowe Construction, a Division of UCM, Inc. and Advanced Asphalt Company Joint Venture $57,888,042 ·
Apr 27, 2018 68D69 TazewellDistrict 4 0.97 mile of patching, milling and resurfacing on US 24/IL 29 from Margaret Drive to north of Lasalle Boulevard in Creve Coeur. — Rejected Nov 26 New Advanced Asphalt Company $1,885,690 ·
Apr 27, 2018 68D81 VariousDistrict 4 Bridge deck sealing on various structures in various counties in District 4. — Executed Nov 26 New All States Painting, Inc. $216,339 ·
Apr 27, 2018 68E01 MarshallMasonTazewellDistrict 4 Wash 9 bridges over the Illinois River. — Executed Nov 26 New All States Painting, Inc. $833,300 ·
Apr 27, 2018 68E05 StarkTazewellDistrict 4 Pollinator habitat restoration and preservation in Stark and Tazewell Counties. — Executed Nov 26 New CSD Environmental Services, Inc. $41,978 ·
Apr 27, 2018 68E07 VariousDistrict 4 Pavement marking on various routes in various counties in District 4. — Executed Nov 26 New America's Parking ReMarking $409,091 ·
Apr 27, 2018 68E08 VariousDistrict 4 Guardrail and cable guardrail repairs at various locations in District Four. — Executed Nov 26 New Northern Contracting, Inc. $667,539 ·
Apr 27, 2018 89733 KnoxDistrict 4 Traffic Signal modernization at nine intersections in the City of Galesburg. — Executed Nov 26 New Oberlander Electric Co. $468,309 ·
Jun 15, 2018 68088 TazewellDistrict 4 Scour mitigation to SN 090-0112 carrying Illinois Route 29 over Lost Creek, 1.5 miles south of Pekin. — Rejected Nov 26 New Lee Hood d/b/a Hood Demolition & Excavation $262,717 ·
Jun 15, 2018 68663 MercerDistrict 4 Remove and replace SN 066-0006 carrying IL 17 over the Edwards River. — Executed Nov 26 New General Constructors Inc. of the Quad Cities $5,354,351 ·
Jun 15, 2018 68825 McDonoughDistrict 4 12.1 miles of partial pavement patching, cold milling, resurfacing, guardrail replacement and ADA ramp construction on IL 9 from the Hancock County line to US 67. — Executed Nov 26 New Gunther Construction, a div of UCM, Inc. $4,722,460 ·
Jun 15, 2018 68B59 KnoxPeoriaDistrict 4 Guardrail removal and culvert extensions at various locations on IL 8 and US 150, culvert replacement at Location 18 on US 150. — Executed Nov 26 New Illinois Civil Contractors, Inc. $1,589,198 ·
Jun 15, 2018 68D09 TazewellDistrict 4 Intersection reconstruction at US 24 and Spring Creek Road. — Executed Nov 26 New R. A. Cullinan and Son, a div of UCM, Inc. $1,212,722 ·
Jun 15, 2018 68D61 TazewellDistrict 4 550 feet of riprap slope repair and culvert lining along IL 116 from Mariner's Way to 0.5 mile south, in East Peoria. — Executed Nov 26 New Illinois Civil Contractors, Inc. $246,702 ·
Jun 15, 2018 68E00 TazewellDistrict 4 Building demolition at 500 West Pearl Street in Tremont. — Executed Nov 26 New Stark Excavating, Inc. $37,009 ·
Jun 15, 2018 68E02 TazewellDistrict 4 Paint 5 bridges in Tazewell County; SN 090-0104, 0105, 0106, 0107 and 090-0141. — Executed Nov 26 New Three Star Painting, Inc. $871,891 ·
Jun 15, 2018 68E03 PeoriaDistrict 4 Installation of traffic signals and an eastbound left-turn lane at the intersection of US 24 and Cameron Lane (IL 9). — Executed Nov 26 New Oberlander Electric Co. $595,444 ·
Jun 15, 2018 68E10 TazewellWoodfordDistrict 4 Patching on US 24 from the McClugage Bridge to Cummings Lane, and on IL 116 from the Upper Spring Bay to Lourdes (CH 19). — Rejected Nov 26 New
Jun 15, 2018 68E15 PeoriaDistrict 4 2.7 miles of shoulder restoration along IL 6 from IL 40 to IL 29. — Rejected Nov 26 New
Jun 15, 2018 68E19 MarshallWoodfordDistrict 4 28.4 miles of Class A pavement patching on I-39, from the McClean County line north to 2.1 miles south of IL 17. — Executed Nov 26 New Kinney Contractors, Inc. $429,762 ·
Jun 15, 2018 68E38 VariousDistrict 4 Milling centerline and edgeline rumble strips, and replacing pavement markings on various routes throughout District 4. — Executed Nov 26 New SURFACE PREPARATION TECHNOLOGIES, LLC $199,799 ·
Jun 15, 2018 68E39 PeoriaTazewellDistrict 4 Installation of turn signals, luminaires, light poles, lighting controller and relocation of existing railroad interconnected traffic signal controller cabinet at various locations. — Executed Nov 26 New Laser Electric, Inc. $183,757 ·
Jun 15, 2018 68E40 WarrenDistrict 4 0.6 mile of partial width resurfacing and longitudinal joint repair on US 34 from 160th Ave. to 0.4 mile east of 165th Ave. near Kirkwood. — Executed Nov 26 New Gunther Construction, a div of UCM, Inc. $146,255 ·
Jun 15, 2018 89663 WoodfordDistrict 4 Resurfacing IL 117 from Eureka Avenue to Reagan Drive in the City of Eureka. — Executed Nov 26 New R. A. Cullinan and Son, a div of UCM, Inc. $150,054 ·
Aug 3, 2018 68C49 MarshallDistrict 4 Insert a new box culvert into an existing box culvert carrying IL 89 over Sandy Creek, 2.6 miles south of IL 18. — Executed Nov 26 New Stark Excavating, Inc. $389,628 ·
Aug 3, 2018 68D96 PeoriaDistrict 4 Construction of an HMA parking lot with fence east of the District 4 materials lab, off US 150 in Edwards. — Rejected Nov 26 New
Aug 3, 2018 68E09 FultonDistrict 4 Replace 4' X 6' culvert and repair slope on IL route 97, 2.5 miles south of Cuba. — Executed Nov 26 New Lee Hood d/b/a Hood Demolition & Excavation $342,404 ·
Aug 3, 2018 68E46 KnoxDistrict 4 Replace pedestrian walkway lighting and lighting fixtures at I-74 Spoon River Rest Areas in Knox County. — Executed Nov 26 New Laser Electric, Inc. $81,493 ·
Aug 3, 2018 68E55 MarshallDistrict 4 Profile correction and installation of underdrains on IL 29, 0.7 mile north of Sparland. — Executed Nov 26 New Advanced Asphalt Company $297,057 ·
Aug 3, 2018 68E56 McDonoughSchuylerDistrict 4 Intermittent centerline joint repair and partial depth patching on US 67 from north of Industry city limits to IL 101. — Rejected Nov 26 New Illinois Valley Paving, a div of UCM, Inc. $262,274 ·
Aug 3, 2018 68E57 FultonMcDonoughDistrict 4 Partial depth patching on IL 41 from Avon city limits north to IL 9. — Rejected Nov 26 New Gunther Construction, a div of UCM, Inc. $418,027 ·
Aug 3, 2018 68E59 VariousDistrict 4 Installatino of fiber cable, duct and communication vaults at various locations in District 4. — Executed Nov 26 New Oberlander Electric Co. $464,500 ·
Aug 3, 2018 89741 MercerDistrict 4 Extend six reinforced concrete box culverts, construction of one concrete box culvert, and the removal and replacement of ten corrugated metal pipe culverts on Joy Road between 160th Avenue and 130th Avenue. — Rejected Nov 26 New
Aug 3, 2018 89746 TazewellDistrict 4 Construction of a shared-use path along West Cruger Road from Nofsinger Road to Main Street in the City of Washington. — Executed Nov 26 New Stark Excavating, Inc. $359,285 ·
Sep 21, 2018 68E47 PeoriaDistrict 4 Scour mitigation at SN 072-0034 carrying IL 90 over Prince Run. — Executed Nov 26 New Illinois Civil Contractors, Inc. $155,436 ·
Sep 21, 2018 68E65 TazewellDistrict 4 Patching and joint repair on the on-ramps and off-ramps at the westbound I-74 Morton interchange. — Executed Nov 26 New G. M. Sipes Construction, Inc. $261,656 ·
Nov 9, 2018 68185 PeoriaDistrict 4 Replacement of the structure carrying Farminton Road over Kickapoo Creek and reconstruction of the Farmington Road/Kickapoo Creek intersection, includes pavement improvements from west of the railroad tracks to west of Redbud Drive. — Executed Nov 26 New Stark Excavating, Inc. $10,061,876 ·
Nov 9, 2018 68D85 TazewellDistrict 4 Bridge repair project, approximately 500' in length, located in the US 24/IL 116 Interchange just east of the McClugage Bridge. — Executed Nov 26 New Halverson Construction Co., Inc. $1,885,363 ·
Nov 9, 2018 68E11 MarshallDistrict 4 Repair Bridge SN 062-0037 carrying IL 18 over Sandy Creek, 0.1 mile west of IL 26. — Executed Nov 26 New Stark Excavating, Inc. $523,628 ·
Nov 9, 2018 68E17 WoodfordDistrict 4 Bridge repairs to SN 102-0007 carrying US Route 24 over Walnut Creek, 0.5 miles west of IL Route 117. — Executed Nov 26 New Stark Excavating, Inc. $434,382 ·
Nov 9, 2018 68E25 HendersonDistrict 4 Bridge joint repoairs to SN 036-0035 carrying US Route 34 over Chinn Street. — Executed Nov 26 New Laverdiere Construction, Inc. $546,342 ·
Nov 9, 2018 68E61 VariousDistrict 4 District-wide weed spraying (off Road). — Executed Nov 26 New Endrizzi Contracting, Inc $187,960 ·
Nov 9, 2018 68E70 VariousDistrict 4 Repair and Maintenance of electrical facilities in District Four. — Executed Nov 26 New Laser Electric, Inc. $267,279 ·
Nov 9, 2018 89747 McDonoughDistrict 4 Replace superstructure on the bridge carrying CH 26 over Hogwallow Branch, 3.5 miles east of the Hancock County Line. — Executed Nov 26 New County Contractors, Inc. $429,858 ·
Jan 18, 2019 68A91 FultonDistrict 4 Resurfacing on US 24 from Maple St. in Lewistown to Little America, and on IL 97 from US 24 to North Clark Rd. — Executed Nov 26 New R. A. Cullinan and Son, a div of UCM, Inc. $3,428,793 ·
Jan 18, 2019 68D59 TazewellDistrict 4 Bridge repair on Washington Street (IL 40) and the Industrial Spur (IL 40). — Executed Nov 26 New Halverson Construction Co., Inc. $3,848,556 ·
Jan 18, 2019 68D79 WoodfordDistrict 4 Resurfacing I-39 from the Mclean County line to 0.25 mile north of US 24, includes repair on bridges SN 102-0058 and 102-0059. — Executed Nov 26 New Rowe Construction, a div of UCM, Inc. $13,273,213 ·
Jan 18, 2019 68E20 PeoriaDistrict 4 Installation of fiber optic cable, communications equipment and CCTV for a new traffic signal system in Peoria. — Rejected Nov 26 New Oberlander Electric Co. $790,000 ·
Jan 18, 2019 68E69 VariousDistrict 4 Dead tree removal throughout District 4. — Executed Nov 26 New Clean Cut Tree Service, Inc. $167,467 ·
Jan 18, 2019 68E74 KnoxDistrict 4 Structural steel repairs to beams on SN 048-0065 carrying Farnham Street over US 34. — Executed Nov 26 New Halverson Construction Co., Inc. $147,930 ·
Jan 18, 2019 68E76 TazewellDistrict 4 Installation and removal of guardrail, inlet adjustments and miscellaneous concrete work to separate US 150 (West Jackson Street) from the adjacent multi-use trial from Beverly Avenue to Cedar Avenue, on the northwest side of Morton — Executed Nov 26 New Illinois Civil Contractors, Inc. $149,100 ·
Jan 18, 2019 68E78 TazewellDistrict 4 Install communications duct, communications vaults, fiber optic cable, CCTV cameras along US 24 and Business Route 24 in and around Washington. — Executed Nov 26 New Bodine Electric of Decatur $427,439 ·
Jan 18, 2019 89712 PeoriaDistrict 4 Pavement reconstruction, PCC pavement, curb and gutter, storm sewers, PCC multi-use path, street lighting and pedestrian signals, on Dirksen Parkway from Middle Road to Airport Road. — Executed Nov 26 New R. A. Cullinan and Son, a div of UCM, Inc. $5,449,818 ·
Jan 18, 2019 89732 PeoriaDistrict 4 Construction of 4' HMA shoulders with rumble strips, 2' aggregate shoulders and the reconstruction of ditches on Kickapoo-Edwards Road from Shamrock Lane to Countryside Lane. — Executed Nov 26 New R. A. Cullinan and Son, a div of UCM, Inc. $1,175,654 ·
Mar 8, 2019 68B78 WarrenDistrict 4 Resurfacing on US 34/US 67/IL 100/IL 164 from 0.25 mile south of 11th Ave. to 0.9 mile east of 11th Street in Monmouth. — Executed Nov 26 New Gunther Construction, a div of UCM, Inc. $7,678,838 ·
Mar 8, 2019 68C63 TazewellDistrict 4 Culvert replacement on IL 98, 0.1 mile east of Cole Hollow Rd (SN 090-1002) — Executed Nov 26 New Kinney Contractors, Inc. $734,500 ·
Mar 8, 2019 68D10 KnoxDistrict 4 Replacement of a single box culvert with a double (SN-048-2008), HMA pavement, guardrail replacement, earthwork, and other collateral work necessary, located 0.6 mile west of IL-180 near Victoria. — Executed Nov 26 New Kinney Contractors, Inc. $979,988 ·
Mar 8, 2019 68D22 PeoriaDistrict 4 Resurfacing, ADA improvements, traffic signal improvements, and drainage improvements along IL Rte 29 south of US Rte 150 to Abington St in Peoria. — Executed Nov 26 New Advanced Asphalt Company $1,972,818 ·
Mar 8, 2019 68E14 TazewellDistrict 4 Substructure repairs to SN 090-0037 carrying US RTE 150 over Farm Creek, TWP Railroad, and Norfolk Southern Railroad. — Executed Nov 26 New Otto Baum Company, Inc. $138,518 ·
Mar 8, 2019 68E28 WoodfordDistrict 4 Cold in-place recycling on IL 117 from IL 116 to Mill St in Eureka. — Executed Nov 26 New Advanced Asphalt Company $1,373,783 ·
Mar 8, 2019 68E36 PeoriaDistrict 4 Bituminous surface treatment- A1 on IL Rte 91 from the Stark county line. — Executed Nov 26 New R. A. Cullinan and Son, a div of UCM, Inc. $169,369 ·
Mar 8, 2019 68E62 PeoriaDistrict 4 Landscaping along I-74 from Ellis St to the Illinois River. — Executed Nov 26 New Central Landscaping, LP $122,806 ·
Mar 8, 2019 68E63 VariousDistrict 4 Pavement markings throughout District 4. — Executed Nov 26 New Varsity Striping & Construction Co. $435,795 ·
Mar 8, 2019 68E64 VariousDistrict 4 Guardrail repairs caused by motorists (MCHD) and cable guardrail repairs (high tensions cable barrier). — Executed Nov 26 New Northern Contracting, Inc. $682,239 ·
Mar 8, 2019 68E66 HendersonDistrict 4 Crack and joint sealing on US 34 (Biggsvile Bypass) and on IL 94/IL 116 from 1425N to 0.14 mile south of 1500N. — Executed Nov 26 New Complete Asphalt Service Co. $160,990 ·
Mar 8, 2019 68E67 VariousDistrict 4 Bridge deck sealing on various structures district wide. — Executed Nov 26 New M & M Concrete, Inc. $250,000 ·
Mar 8, 2019 68E68 MarshallMasonTazewellDistrict 4 Bridge washing of eleven bridges over the Illinois River — Executed Nov 26 New All States Painting, Inc. $881,690 ·
Mar 8, 2019 68E75 TazewellDistrict 4 Crack and joint sealing on I-155 from I-74 to the Tazewell/Logan county line. — Executed Nov 26 New Complete Asphalt Service Co. $197,480 ·
Mar 8, 2019 68E80 PeoriaDistrict 4 Construction of an aggregate parking lot with fence east of District 4 materials lab off of US 150 in Edwards. — Executed Nov 26 New Otto Baum Company, Inc. $218,121 ·
Mar 8, 2019 68E81 TazewellDistrict 4 Longitudinal joint repair, raised pavement markers, pavement striping on US 24 from east of College Drive to east of Cummings Lane. — Executed Nov 26 New R. A. Cullinan and Son, a div of UCM, Inc. $431,734 ·
Mar 8, 2019 89713 TazewellDistrict 4 Resurfacing, sidewalks, street and pedestrian lighting, storm sewer, curb and g gutter, and pavement markings on IL 29 (Main Street) from Poplar Street to Margaret Drive in Creve Coeur. — Executed Nov 26 New Illinois Civil Contractors, Inc. $3,914,270 ·
Apr 26, 2019 68D77 TazewellDistrict 4 Rehabilitation of SN 090-0047 carrying IL 29/IL 116/IL 8/US 24 over Farm Creek west of Camp Street in East Peoria. — Executed Nov 26 New Phoenix Corporation of the Quad Cities $571,771 ·
Apr 26, 2019 68D98 PeoriaDistrict 4 Surfacing maintenance including pavement patching, HMA surface removal, HMA surface course, and the construction of ADA ramps at various locations on IL Rte 40. — Executed Nov 26 New R. A. Cullinan and Son, a div of UCM, Inc. $919,865 ·
Apr 26, 2019 68E37 TazewellDistrict 4 Bridge painting at various locations in Taxewell County. (SN 090-0117, 0116, 0102, 0118, and 090-0119). — Executed Nov 26 New Civil Coatings and Construction Inc. $2,237,590 ·
Apr 26, 2019 89474 KnoxDistrict 4 Replace the bridge carrying CH 4 over Walnut Creek, 0.5 mile west of Altona. — Executed Nov 26 New County Contractors, Inc. $699,269 ·
Jun 14, 2019 46516 VariousDistrict 4 Remove and replace raised reflective pavement markers within limits shown. — Executed Nov 26 New P & P Construction Co. $571,845 ·
Jun 14, 2019 46517 VariousDistrict 4 REMOVAL OF EXISTING PAVEMENT MARKINGS AND REPLACING WITH EPOXY AND MODIFIED URETHANE PAVEMENT MARKING LINES WITHIN THE LIMITS SPECIFIED ON EACH WORK ORDER. — Executed Nov 26 New ROADSAFE TRAFFIC SYSTEMS, INC. $1,098,686 ·
Jun 14, 2019 68D45 FultonDistrict 4 2400' OF SLOPE AND TOE REPAIR ALONG THE EAST SIDE OF IL 78/IL 97 N OF DICKSON MOUNDS RD. THE PROJECT ALSO INCLUDES THE RECONSTRUCTION OF THE SHOULDER AND INSTALLATION OF GUARDRAIL. — Executed Nov 26 New Illinois Civil Contractors, Inc. $865,314 ·
1–100 of 878Next ›

Lettings: IDOT Transportation Bulletin (Notice of Letting and Contract Detail pages). Planned projects: IDOT Multi-Year Highway Improvement Program (roadway, structure and spot layers on the IDOT open data hub), listed by program year, not let date. "Added" is the first date Bid Potato saw the job. Always confirm against the official proposal before bidding.