11(N,BR-1,RS-4,W-1)
- Let date
- Friday, November 9, 2018
- Contract
- 68185 · job page
- District
- District 4
- County
- Peoria
- Highway
- Limits
- Replacement of the structure carrying Farminton Road over Kickapoo Creek and reconstruction of the Farmington Road/Kickapoo Creek intersection, includes pavement improvements from west of the railroad tracks to west of Redbud Drive.
Bidders 3
| # | Contractor | Total bid | vs estimate | vs low |
|---|---|---|---|---|
| EE | Engineer's estimate | — | ||
| 1 | Stark Excavating, Inc. Low bidder | $10,061,876 | ||
| 2 | Halverson Construction Co., Inc. | $10,167,865 | +1.1% | |
| 3 | Otto Baum Company, Inc. | $10,244,322 | +1.8% |
| Seq | Bid code | Description | Qty | Unit | Estimate | #1 Stark Excavatin… | #2 Halverson Const… | #3 Otto Baum Compa… |
|---|---|---|---|---|---|---|---|---|
| 1 | X0323569 | STEEL POST REMOVAL | 18 | EACH | $50.00 | $100.00 | $44.74 | |
| 2 | X0326440 | SURF REM VAR DP (SPL) | 3,256 | SQ YD | $5.75 | $5.65 | $6.09 | |
| 3 | X0327301 | RELOCATE EX MAILBOX | 8 | EACH | $315.00 | $400.00 | $404.21 | |
| 4 | X0327980 | PAVMT MRKG REM WTR BL | 4,271 | SQ FT | $1.35 | $2.68 | $2.89 | |
| 5 | X0488100 | REM EX SEPTIC TANK | 1 | EACH | $3,200.00 | $5,000.00 | $1,615.62 | |
| 6 | X1200050 | BOX CULVERT REMOVAL | 303 | FOOT | $59.50 | $41.00 | $46.36 | |
| 7 | X1400095 | LUM LED HM HIGH WATT | 5 | EACH | $1,150.00 | $1,222.08 | $1,233.26 | |
| 8 | X1800010 | FURNISHING TREES | 1 | L SUM | $26,500.00 | $32,000.00 | $34,466.58 | |
| 9 | X4201410 | BR APPR PAVT CONN SPL | 136 | SQ YD | $260.00 | $246.00 | $159.77 | |
| 10 | X4400110 | TEMP PAVT REMOVAL | 5,450 | SQ YD | $5.50 | $11.75 | $6.71 | |
| 11 | X5011100 | FOUNDATION REM | 2 | EACH | $115.00 | $500.00 | $253.04 | |
| 12 | X5030305 | CONC WEARING SURF 5 | 410.6 | SQ YD | $130.00 | $119.00 | $107.13 | |
| 13 | X5040100 | PREC BRIDGE APP SLAB | 3,675 | SQ FT | $35.50 | $32.40 | $28.69 | |
| 14 | X5090810 | PEDESTRIAN RAIL SPL | 340 | FOOT | $235.00 | $220.00 | $236.96 | |
| 15 | X5860110 | GRANULAR BACKFILL STR | 201 | CU YD | $76.25 | $69.00 | $63.01 | |
| 16 | X6022930 | MAN TA 5 DIA SPL F&G | 1 | EACH | $3,000.00 | $2,300.00 | $2,948.04 | |
| 17 | X6023508 | INLETS TA W/SPL F&G | 1 | EACH | $1,300.00 | $860.00 | $1,332.00 | |
| 18 | X6062700 | CONC GUTTER TA SPL | 941 | FOOT | $42.00 | $45.00 | $35.08 | |
| 19 | X6330725 | SPBGR (SHORT RADIUS) | 50 | FOOT | $35.25 | $35.00 | $37.70 | |
| 20 | X6700410 | ENGR FLD OFF A SPL | 24 | CAL MO | $1,050.00 | $2,200.00 | $1,249.87 | |
| 21 | X7010216 | TRAF CONT & PROT SPL | 1 | L SUM | $60,000.00 | $62,460.00 | $67,274.46 | |
| 22 | X7015005 | CHANGEABLE MESSAGE SN | 2,192 | CAL DA | $25.50 | $26.00 | $28.00 | |
| 23 | X7030005 | TEMP PAVT MKING REMOV | 15,703 | SQ FT | $1.50 | $1.00 | $0.6400 | |
| 24 | X7040125 | PIN TEMP CONC BARRIER | 291 | EACH | $22.50 | $27.00 | $25.70 | |
| 25 | X7050167 | TEMP TRBT T1 SPL TAN | 1 | EACH | $2,700.00 | $2,650.00 | $2,854.26 | |
| 26 | X7240300 | SIGN REMOVAL | 24 | EACH | $130.00 | $135.00 | $29.98 | |
| 27 | X7240500 | RELOC EX SIGNS | 13 | EACH | $200.00 | $210.00 | $226.19 | |
| 28 | X8130110 | JUNCTION BOX SPL | 4 | EACH | $1,750.00 | $1,841.12 | $1,857.97 | |
| 29 | X8410102 | TEMP LIGHTING SYSTEM | 1 | L SUM | $11,600.00 | $12,274.15 | $12,386.42 | |
| 30 | Z0001002 | GDRL AGG EROS CONT | 84 | TON | $69.00 | $64.00 | $55.65 | |
| 31 | Z0001900 | ASB BEARING PAD REMOV | 44 | EACH | $22.00 | $34.00 | $24.57 | |
| 32 | Z0007124 | STEEL RAILING SPL | 286 | FOOT | $180.00 | $210.00 | $188.49 | |
| 33 | Z0007601 | BLDG REMOV NO 1 | 1 | L SUM | $39,500.00 | $32,000.00 | $31,235.34 | |
| 34 | Z0013798 | CONSTRUCTION LAYOUT | 1 | L SUM | $88,000.00 | $100,000.00 | $50,978.22 | |
| 35 | Z0018911 | DRILL-GROUT #6 T-BAR | 448 | EACH | $14.00 | $10.60 | $10.88 | |
| 36 | Z0022800 | FENCE REMOVAL | 453 | FOOT | $5.00 | $5.50 | $5.37 | |
| 37 | Z0034105 | MATL TRANSFER DEVICE | 3,256 | TON | $9.60 | $9.00 | $9.69 | |
| 38 | Z0046304 | P UNDR FOR STRUCT 4 | 610 | FOOT | $21.00 | $26.00 | $26.55 | |
| 39 | Z0049801 | R&D FRIABL ASB BLD 1 | 1 | L SUM | $12,500.00 | $8,200.00 | $8,616.65 | |
| 40 | Z0049901 | R&D NON-FR ASB BLD 1 | 1 | L SUM | $750.00 | $10,800.00 | $8,616.65 | |
| 41 | Z0055500 | RUMBLE STRIP | 1,600 | SQ FT | $6.50 | $4.00 | $6.14 | |
| 42 | Z0062456 | TEMP PAVEMENT | 5,450 | SQ YD | $47.00 | $48.50 | $39.98 | |
| 43 | Z0064540 | SEEPAGE COLLAR | 2 | EACH | $950.00 | $350.00 | $681.15 | |
| 44 | Z0075505 | TIMBER RETAIN WALL RM | 34 | FOOT | $22.50 | $38.00 | $11.78 | |
| 45 | Z0076600 | TRAINEES | 2,000 | HOUR | $0.8000 | $0.8000 | $0.8000 | |
| 46 | Z0076604 | TRAINEES TPG | 2,000 | HOUR | $15.00 | $15.00 | $15.00 | |
| 47 | Z0077803 | REMOV WOOD POST | 3 | EACH | $75.00 | $250.00 | $134.23 | |
| 48 | 20100110 | TREE REMOV 6-15 | 159 | UNIT | $31.00 | $30.00 | $38.77 | |
| 49 | 20100210 | TREE REMOV OVER 15 | 271 | UNIT | $46.00 | $45.00 | $42.01 | |
| 50 | 20100500 | TREE REMOV ACRES | 1.75 | ACRE | $15,500.00 | $15,000.00 | $11,610.93 | |
| 51 | 20200100 | EARTH EXCAVATION | 17,455 | CU YD | $14.75 | $5.90 | $23.60 | |
| 52 | 20300100 | CHANNEL EXCAVATION | 11,632 | CU YD | $13.50 | $8.70 | $22.34 | |
| 53 | 20400800 | FURNISHED EXCAVATION | 15,748 | CU YD | $18.50 | $34.45 | $27.06 | |
| 54 | 20800150 | TRENCH BACKFILL | 308 | CU YD | $41.50 | $40.00 | $29.62 | |
| 55 | 21101615 | TOPSOIL F & P 4 | 24,019 | SQ YD | $5.70 | $4.00 | $6.84 | |
| 56 | 25000210 | SEEDING CL 2A | 4.25 | ACRE | $1,050.00 | $1,000.00 | $1,077.08 | |
| 57 | 25000300 | SEEDING CL 3 | 0.5 | ACRE | $1,650.00 | $1,600.00 | $1,723.32 | |
| 58 | 25000310 | SEEDING CL 4 | 0.75 | ACRE | $1,050.00 | $1,000.00 | $1,077.08 | |
| 59 | 25000400 | NITROGEN FERT NUTR | 698 | POUND | $1.05 | $1.00 | $1.08 | |
| 60 | 25000500 | PHOSPHORUS FERT NUTR | 698 | POUND | $1.05 | $1.00 | $1.08 | |
| 61 | 25000600 | POTASSIUM FERT NUTR | 698 | POUND | $1.05 | $1.00 | $1.08 | |
| 62 | 25000750 | MOWING | 51.5 | ACRE | $102.00 | $100.00 | $107.71 | |
| 63 | 25003210 | INTERSEED CL 2A | 2.25 | ACRE | $825.00 | $800.00 | $861.67 | |
| 64 | 25003300 | INTERSEED CL 3 | 0.25 | ACRE | $1,250.00 | $1,200.00 | $1,292.52 | |
| 65 | 25100115 | MULCH METHOD 2 | 2.75 | ACRE | $825.00 | $800.00 | $861.66 | |
| 66 | 25100630 | EROSION CONTR BLANKET | 10,123 | SQ YD | $1.40 | $2.25 | $1.48 | |
| 67 | 25100635 | HD EROS CONTR BLANKET | 730 | SQ YD | $2.05 | $2.00 | $2.15 | |
| 68 | 28000200 | EARTH EXC - EROS CONT | 5 | CU YD | $55.00 | $72.00 | $74.12 | |
| 69 | 28000250 | TEMP EROS CONTR SEED | 550 | POUND | $4.10 | $2.75 | $2.55 | |
| 70 | 28000305 | TEMP DITCH CHECKS | 352 | FOOT | $18.00 | $8.50 | $13.20 | |
| 71 | 28000315 | AGG DITCH CHECKS | 320 | TON | $63.00 | $66.00 | $68.03 | |
| 72 | 28000400 | PERIMETER EROS BAR | 7,361 | FOOT | $3.50 | $4.65 | $2.73 | |
| 73 | 28000500 | INLET & PIPE PROTECT | 15 | EACH | $300.00 | $275.00 | $101.61 | |
| 74 | 28100209 | STONE RIPRAP CL A5 | 5,360 | TON | $91.00 | $88.00 | $90.90 | |
| 75 | 28100807 | STONE DUMP RIP CL A4 | 2,029 | TON | $95.00 | $88.00 | $85.50 | |
| 76 | 28100809 | STONE DUMP RIP CL A5 | 87 | TON | $97.00 | $94.00 | $94.04 | |
| 77 | 28100825 | STONE DUMP RIP CL B3 | 2,235 | TON | $63.00 | $65.00 | $46.63 | |
| 78 | 28200200 | FILTER FABRIC | 7,541 | SQ YD | $2.50 | $2.70 | $2.76 | |
| 79 | 31100300 | SUB GRAN MAT A 4 | 4,855 | SQ YD | $14.20 | $17.25 | $9.36 | |
| 80 | 31100910 | SUB GRAN MAT A 12 | 11,470 | SQ YD | $21.60 | $23.40 | $18.03 | |
| 81 | 35100700 | AGG BASE CSE A 8 | 49 | SQ YD | $34.00 | $42.60 | $23.86 | |
| 82 | 35300300 | PCC BSE CSE 8 | 5,269 | SQ YD | $54.50 | $49.50 | $43.95 | |
| 83 | 35301400 | PCC BSE CSE VAR DP | 938 | SQ YD | $78.50 | $68.00 | $54.68 | |
| 84 | 40200100 | AGG SURF CSE A | 473 | TON | $46.50 | $61.50 | $45.35 | |
| 85 | 40201000 | AGGREGATE-TEMP ACCESS | 300 | TON | $56.50 | $31.00 | $24.50 | |
| 86 | 40600295 | P BIT MATLS TACK CT | 15,204 | POUND | $2.25 | $2.20 | $2.37 | |
| 87 | 40600829 | P LB MM IL-9.5FG N50 | 674 | TON | $115.00 | $112.50 | $121.17 | |
| 88 | 40600982 | HMA SURF REM BUTT JT | 237 | SQ YD | $47.00 | $46.00 | $49.55 | |
| 89 | 40600990 | TEMPORARY RAMP | 428 | SQ YD | $21.00 | $20.00 | $21.54 | |
| 90 | 40603080 | HMA BC IL-19.0 N50 | 239 | TON | $215.00 | $214.00 | $230.50 | |
| 91 | 40603535 | P HMA SC "D" N50 | 717 | TON | $110.00 | $110.00 | $118.48 | |
| 92 | 40700100 | BIT MATLS TACK CT | 8,113 | POUND | $1.65 | $1.60 | $1.72 | |
| 93 | 40701841 | HMA PAVT FD 8 | 4,162 | SQ YD | $63.00 | $62.75 | $67.59 | |
| 94 | 40800029 | BIT MATLS TACK CT | 359 | POUND | $3.30 | $3.25 | $3.50 | |
| 95 | 40800050 | INCIDENTAL HMA SURF | 88 | TON | $250.00 | $248.00 | $267.12 | |
| 96 | 42300300 | PCC DRIVEWAY PAVT 7 | 168 | SQ YD | $89.50 | $96.00 | $63.51 | |
| 97 | 44000100 | PAVEMENT REM | 7,807 | SQ YD | $16.25 | $11.50 | $11.58 | |
| 98 | 44000200 | DRIVE PAVEMENT REM | 1,654 | SQ YD | $7.00 | $11.50 | $7.14 | |
| 99 | 44000400 | GUTTER REM | 1,380 | FOOT | $5.00 | $7.35 | $9.01 | |
| 100 | 44004000 | PAVED DITCH REMOVAL | 1,219 | FOOT | $9.00 | $14.60 | $9.77 | |
| 101 | 44004250 | PAVED SHLD REMOVAL | 150 | SQ YD | $5.50 | $62.30 | $7.94 | |
| 102 | 44201106 | CL B PATCH T4 20 | 57 | SQ YD | $240.00 | $220.00 | $170.72 | |
| 103 | 44213208 | TIE BARS 1 1/4 | 128 | EACH | $19.00 | $21.25 | $21.01 | |
| 104 | 48101600 | AGGREGATE SHLDS B 8 | 1,072 | SQ YD | $24.50 | $25.60 | $18.45 | |
| 105 | 48203029 | HMA SHOULDERS 8 | 4,221 | SQ YD | $63.00 | $62.30 | $67.10 | |
| 106 | 48203100 | HMA SHOULDERS | 69 | TON | $210.00 | $205.00 | $220.80 | |
| 107 | 50100300 | REM EXIST STRUCT N1 | 1 | EACH | $185,000.00 | $241,690.00 | $191,070.74 | |
| 108 | 50100400 | REM EXIST STRUCT N2 | 1 | EACH | $3,600.00 | $5,000.00 | $690.49 | |
| 109 | 50102400 | CONC REM | 7.5 | CU YD | $90.00 | $180.00 | $1,850.40 | |
| 110 | 50104400 | CONC HDWL REM | 6 | EACH | $400.00 | $320.00 | $629.39 | |
| 111 | 50105220 | PIPE CULVERT REMOV | 606 | FOOT | $18.00 | $27.00 | $20.11 | |
| 112 | 50200100 | STRUCTURE EXCAVATION | 278 | CU YD | $28.00 | $32.00 | $35.84 | |
| 113 | 50300225 | CONC STRUCT | 424.1 | CU YD | $1,010.00 | $850.00 | $1,451.36 | |
| 114 | 50300255 | CONC SUP-STR | 557.7 | CU YD | $1,210.00 | $1,040.00 | $1,310.15 | |
| 115 | 50300260 | BR DECK GROOVING | 2,132 | SQ YD | $6.50 | $5.35 | $6.45 | |
| 116 | 50300300 | PROTECTIVE COAT | 2,648 | SQ YD | $2.20 | $2.15 | $1.99 | |
| 117 | 50500105 | F & E STRUCT STEEL | 1 | L SUM | $1,300,000.00 | $1,421,980.00 | $1,148,023.69 | |
| 118 | 50500405 | F & E STRUCT STEEL | 8,510 | POUND | $3.75 | $5.75 | $7.33 | |
| 119 | 50500505 | STUD SHEAR CONNECTORS | 11,884 | EACH | $2.85 | $4.25 | $3.73 | |
| 120 | 50800105 | REINFORCEMENT BARS | 43,120 | POUND | $1.60 | $2.58 | $1.42 | |
| 121 | 50800205 | REINF BARS, EPOXY CTD | 249,850 | POUND | $1.40 | $1.35 | $1.29 | |
| 122 | 50800515 | BAR SPLICERS | 1,881 | EACH | $38.50 | $30.00 | $37.26 | |
| 123 | 50800530 | MECHANICAL SPLICERS | 252 | EACH | $113.00 | $113.00 | $105.31 | |
| 124 | 50901750 | PARAPET RAILING | 325 | FOOT | $75.00 | $77.00 | $75.40 | |
| 125 | 51201600 | FUR STL PILE HP12X53 | 825 | FOOT | $65.50 | $52.00 | $58.12 | |
| 126 | 51202305 | DRIVING PILES | 825 | FOOT | $0.0100 | $0.1000 | $0.0100 | |
| 127 | 51203600 | TEST PILE ST HP12X53 | 2 | EACH | $5,050.00 | $6,500.00 | $7,120.04 | |
| 128 | 51204650 | PILE SHOES | 24 | EACH | $67.00 | $150.00 | $123.86 | |
| 129 | 51500100 | NAME PLATES | 1 | EACH | $625.00 | $650.00 | $513.46 | |
| 130 | 51602000 | PERMANENT CASING | 284 | FOOT | $200.00 | $325.00 | $335.54 | |
| 131 | 51603000 | DRILLED SHAFT IN SOIL | 238.2 | CU YD | $850.00 | $1,090.00 | $598.91 | |
| 132 | 51604000 | DRILLED SHAFT IN ROCK | 126.5 | CU YD | $2,000.00 | $660.00 | $1,359.53 | |
| 133 | 52000110 | PREF JT STRIP SEAL | 119 | FOOT | $190.00 | $191.00 | $175.21 | |
| 134 | 52100520 | ANCHOR BOLTS 1 | 120 | EACH | $77.00 | $90.00 | $76.54 | |
| 135 | 52200010 | TEMP SHT PILING | 1,972 | SQ FT | $30.50 | $17.50 | $34.37 | |
| 136 | 52200600 | GEOTEX RETAIN WALL | 702 | SQ FT | $78.50 | $49.00 | $20.77 | |
| 137 | 542A0229 | P CUL CL A 1 24 | 98 | FOOT | $61.00 | $65.00 | $75.01 | |
| 138 | 542A0241 | P CUL CL A 1 36 | 87 | FOOT | $125.00 | $102.00 | $119.47 | |
| 139 | 542A0253 | P CUL CL A 1 48 | 99 | FOOT | $150.00 | $152.00 | $145.57 | |
| 140 | 542A0265 | P CUL CL A 1 60 | 88 | FOOT | $242.00 | $230.00 | $221.36 | |
| 141 | 542A5485 | P CUL CL A 1 EQRS 30 | 57 | FOOT | $150.00 | $151.00 | $137.35 | |
| 142 | 542D0217 | P CUL CL D 1 12 | 5 | FOOT | $185.00 | $114.00 | $128.38 | |
| 143 | 542D0220 | P CUL CL D 1 15 | 94 | FOOT | $66.00 | $44.00 | $52.15 | |
| 144 | 542D1081 | P CUL CL D 2 36 | 111 | FOOT | $90.00 | $93.00 | $88.57 | |
| 145 | 54210182 | PIPE ELBOW 12 | 4 | EACH | $700.00 | $400.00 | $778.08 | |
| 146 | 54213657 | PRC FLAR END SEC 12 | 3 | EACH | $800.00 | $615.00 | $680.45 | |
| 147 | 54213663 | PRC FLAR END SEC 18 | 1 | EACH | $1,000.00 | $825.00 | $887.07 | |
| 148 | 54213669 | PRC FLAR END SEC 24 | 2 | EACH | $1,200.00 | $1,040.00 | $1,241.61 | |
| 149 | 54213681 | PRC FLAR END SEC 36 | 3 | EACH | $1,650.00 | $1,300.00 | $1,646.31 | |
| 150 | 54213693 | PRC FLAR END SEC 48 | 2 | EACH | $2,500.00 | $2,350.00 | $2,569.37 | |
| 151 | 54214515 | PRC FL END S EQ RS 30 | 2 | EACH | $1,800.00 | $1,420.00 | $1,665.78 | |
| 152 | 54215460 | CIP RC END SEC 60 | 2 | EACH | $16,600.00 | $16,265.00 | $9,049.21 | |
| 153 | 54260415 | SLOP MET ES 15", 1:4 | 3 | EACH | $675.00 | $540.00 | $758.42 | |
| 154 | 54260436 | SLOP MET ES 36", 1:4 | 4 | EACH | $2,700.00 | $2,380.00 | $3,898.33 | |
| 155 | 54261712 | STEEL FL END SEC 12" | 2 | EACH | $550.00 | $193.00 | $469.37 | |
| 156 | 550A0050 | STORM SEW CL A 1 12 | 150 | FOOT | $75.25 | $50.25 | $63.86 | |
| 157 | 550A0340 | STORM SEW CL A 2 12 | 7 | FOOT | $120.00 | $62.25 | $94.42 | |
| 158 | 550A0380 | STORM SEW CL A 2 18 | 70 | FOOT | $75.50 | $55.25 | $76.91 | |
| 159 | 550A0450 | STORM SEW CL A 2 36 | 94 | FOOT | $96.50 | $118.00 | $118.56 | |
| 160 | 56109210 | WATER VALVES ADJUST | 1 | EACH | $320.00 | $2,750.00 | $261.07 | |
| 161 | 56500300 | DOM MET VLTS ADJ | 1 | EACH | $540.00 | $1,000.00 | $705.18 | |
| 162 | 56500400 | DOM MET VLTS REM | 1 | EACH | $640.00 | $400.00 | $156.11 | |
| 163 | 59100100 | GEOCOMPOSITE WALL DR | 113 | SQ YD | $28.50 | $36.00 | $20.44 | |
| 164 | 60100905 | PIPE DRAINS 4 | 5 | FOOT | $89.00 | $39.00 | $42.53 | |
| 165 | 60100945 | PIPE DRAINS 12 | 71 | FOOT | $67.00 | $68.00 | $50.67 | |
| 166 | 60100955 | PIPE DRAINS 15 | 12 | FOOT | $95.00 | $51.00 | $76.02 | |
| 167 | 60219100 | MAN TA 4 DIA T9F&G | 1 | EACH | $2,650.00 | $2,690.00 | $2,373.62 | |
| 168 | 60224446 | MAN TA 7 DIA T1F CL | 1 | EACH | $5,400.00 | $4,535.00 | $5,498.93 | |
| 169 | 60240303 | INLETS TB T9F&G | 4 | EACH | $1,750.00 | $1,870.00 | $1,870.07 | |
| 170 | 60403400 | GRATES TA | 1 | EACH | $725.00 | $775.00 | $217.87 | |
| 171 | 60500060 | REMOV INLETS | 2 | EACH | $225.00 | $265.00 | $371.49 | |
| 172 | 60600095 | CLASS SI CONC OUTLET | 3.2 | CU YD | $800.00 | $900.00 | $841.12 | |
| 173 | 60608600 | COMB CC&G TM6.06 | 49 | FOOT | $61.00 | $60.00 | $52.34 | |
| 174 | 60610400 | COMB CC&G TM6.24 | 28 | FOOT | $75.00 | $78.00 | $61.77 | |
| 175 | 60618300 | CONC MEDIAN SURF 4 | 255 | SQ FT | $5.85 | $6.15 | $5.16 | |
| 176 | 61000050 | CONC THRUST BLOCKS | 2 | EACH | $1,200.00 | $450.00 | $454.17 | |
| 177 | 61000115 | TY E INLET BOX 610001 | 2 | EACH | $2,350.00 | $4,240.00 | $2,843.40 | |
| 178 | 63000001 | SPBGR TY A 6FT POSTS | 87.5 | FOOT | $25.50 | $25.00 | $26.93 | |
| 179 | 63100085 | TRAF BAR TERM T6 | 3 | EACH | $3,350.00 | $3,300.00 | $3,554.37 | |
| 180 | 63100167 | TR BAR TRM T1 SPL TAN | 3 | EACH | $2,900.00 | $2,850.00 | $3,069.68 | |
| 181 | 63200310 | GUARDRAIL REMOV | 788 | FOOT | $6.20 | $6.50 | $7.00 | |
| 182 | 63500105 | DELINEATORS | 54 | EACH | $56.00 | $55.00 | $59.24 | |
| 183 | 64300240 | IMP ATTEN FRD NAR TL2 | 1 | EACH | $14,700.00 | $14,980.00 | $18,542.24 | |
| 184 | 66201120 | CONC SHLD CURB | 52 | FOOT | $60.00 | $37.50 | $29.34 | |
| 185 | 66600105 | FUR ERECT ROW MARKERS | 43 | EACH | $240.00 | $250.00 | $284.49 | |
| 186 | 66700205 | PERM SURV MKRS T1 | 1 | EACH | $214.00 | $500.00 | $421.43 | |
| 187 | 66900200 | NON SPL WASTE DISPOSL | 2,700 | CU YD | $51.00 | $1.00 | $44.32 | |
| 188 | 66900450 | SPL WASTE PLNS/REPORT | 1 | L SUM | $5,100.00 | $150,000.00 | $5,385.40 | |
| 189 | 66900530 | SOIL DISPOSAL ANALY | 5 | EACH | $950.00 | $2,400.00 | $996.30 | |
| 190 | 66900535 | PRI POLL GRNDWAT ANAL | 5 | EACH | $1,150.00 | $1,520.00 | $1,211.72 | |
| 191 | 67000600 | ENGR FIELD LAB | 24 | CAL MO | $700.00 | $1,600.00 | $758.45 | |
| 192 | 67100100 | MOBILIZATION | 1 | L SUM | $478,000.00 | $600,000.00 | $528,897.70 | |
| 193 | 70103815 | TR CONT SURVEILLANCE | 160 | CAL DA | $0.0100 | $0.1000 | $750.50 | |
| 194 | 70300100 | SHORT TERM PAVT MKING | 615 | FOOT | $1.10 | $1.25 | $1.35 | |
| 195 | 70300150 | SHRT TRM PAVT MK REM | 203 | SQ FT | $1.00 | $4.00 | $2.72 | |
| 196 | 70300210 | TEMP PVT MK LTR & SYM | 210 | SQ FT | $19.50 | $2.50 | $2.69 | |
| 197 | 70300220 | TEMP PVT MK LINE 4 | 41,115 | FOOT | $0.6000 | $0.1900 | $0.2000 | |
| 198 | 70300280 | TEMP PVT MK LINE 24 | 95 | FOOT | $15.25 | $2.25 | $2.42 | |
| 199 | 70300904 | PAVT MARK TAPE T4 4 | 4,795 | FOOT | $1.35 | $1.10 | $1.43 | |
| 200 | 70400100 | TEMP CONC BARRIER | 975 | FOOT | $38.50 | $26.75 | $17.91 | |
| 201 | 70400200 | REL TEMP CONC BARRIER | 1,187.5 | FOOT | $7.75 | $4.25 | $4.21 | |
| 202 | 70500100 | TEMP SPBGR TY A | 112.5 | FOOT | $24.50 | $24.00 | $25.85 | |
| 203 | 70500670 | TEMP TR BAR TERM T6A | 1 | EACH | $3,400.00 | $3,200.00 | $3,446.66 | |
| 204 | 70600255 | IMP ATTN TEMP FRN TL2 | 3 | EACH | $7,500.00 | $7,500.00 | $8,051.18 | |
| 205 | 70600322 | IMP ATTN REL FRN TL2 | 6 | EACH | $1,100.00 | $1,500.00 | $1,270.96 | |
| 206 | 72000100 | SIGN PANEL T1 | 166 | SQ FT | $24.00 | $24.75 | $26.66 | |
| 207 | 72000200 | SIGN PANEL T2 | 44 | SQ FT | $30.00 | $30.80 | $33.17 | |
| 208 | 72501000 | TERMINAL MARKER - DA | 3 | EACH | $30.50 | $30.00 | $32.31 | |
| 209 | 72800100 | TELES STL SIN SUPPORT | 354 | FOOT | $10.50 | $11.25 | $12.12 | |
| 210 | 73000100 | WOOD SIN SUPPORT | 52 | FOOT | $33.00 | $33.00 | $35.54 | |
| 211 | 73100100 | BASE TEL STL SIN SUPP | 30 | EACH | $150.00 | $149.50 | $161.02 | |
| 212 | 78009000 | MOD URETH PM LTR-SYM | 478 | SQ FT | $4.60 | $4.50 | $4.85 | |
| 213 | 78009004 | MOD URETH PM LINE 4 | 10,167 | FOOT | $0.7500 | $0.7400 | $0.8000 | |
| 214 | 78009006 | MOD URETH PM LINE 6 | 2,664 | FOOT | $1.15 | $1.12 | $1.21 | |
| 215 | 78009008 | MOD URETH PM LINE 8 | 1,123 | FOOT | $1.50 | $1.49 | $1.60 | |
| 216 | 78009012 | MOD URETH PM LINE 12 | 393 | FOOT | $2.50 | $2.45 | $2.64 | |
| 217 | 78009024 | MOD URETH PM LINE 24 | 65 | FOOT | $4.50 | $4.45 | $4.79 | |
| 218 | 78100100 | RAISED REFL PAVT MKR | 231 | EACH | $25.00 | $24.23 | $26.10 | |
| 219 | 78200005 | GRDRAIL REF TYPE A | 8 | EACH | $8.00 | $8.00 | $8.62 | |
| 220 | 78200020 | CURB REFLECTORS | 15 | EACH | $14.50 | $14.00 | $20.46 | |
| 221 | 78300200 | RAISED REF PVT MK REM | 231 | EACH | $15.50 | $26.50 | $11.11 | |
| 222 | 80500200 | SERV INSTALL TY B | 1 | EACH | $2,650.00 | $2,796.37 | $2,821.95 | |
| 223 | 81028340 | UNDRGRD C PVC 1 1/2 | 1,939 | FOOT | $40.00 | $41.63 | $42.01 | |
| 224 | 81028350 | UNDRGRD C PVC 2 | 268 | FOOT | $39.00 | $40.56 | $40.93 | |
| 225 | 81100500 | CON AT ST 1 1/2 GALVS | 70 | FOOT | $22.00 | $23.37 | $23.59 | |
| 226 | 81200230 | CON EMB STR 2 PVC | 280 | FOOT | $35.00 | $36.29 | $36.62 | |
| 227 | 81300835 | JUN BX SS AS 18X18X10 | 2 | EACH | $1,850.00 | $1,953.19 | $1,971.06 | |
| 228 | 81400700 | HANDHOLE PCC | 3 | EACH | $1,250.00 | $1,302.13 | $1,314.04 | |
| 229 | 81702120 | EC C XLP USE 1C 8 | 1,876 | FOOT | $2.00 | $2.03 | $2.05 | |
| 230 | 82500300 | LT CONT PM 240V 30 | 1 | EACH | $3,500.00 | $3,663.03 | $3,696.54 | |
| 231 | 83060450 | LT P GS 45MH 15MA | 5 | EACH | $4,700.00 | $4,936.34 | $4,981.50 | |
| 232 | 83600300 | LIGHT POLE FDN 30D | 32.5 | FOOT | $270.00 | $283.91 | $286.50 | |
| 233 | 83800205 | BKWY DEV TR B 15BC | 5 | EACH | $1,000.00 | $1,051.31 | $1,060.92 | |
| 234 | 87301245 | ELCBL C SIGNAL 14 5C | 2,207.5 | FOOT | $1.90 | $1.99 | $2.00 | |
| 235 | 88040020 | SH P LED 1F 1S BM | 6 | EACH | $1,100.00 | $1,136.69 | $1,147.09 | |
| 236 | 88200510 | TS BACKPLATE RET-REFL | 6 | EACH | $210.00 | $218.80 | $220.80 | |
| 237 | 89502400 | REM EX FB INSTAL COMP | 1 | EACH | $5,400.00 | $5,646.11 | $5,697.76 |