Filtered by: County: Schuyler Clear all
| Let date | Contract / PPS | County / Division | Highway | Description | Estimate | Status | Low bidder | |
|---|---|---|---|---|---|---|---|---|
| Mar 9, 2018 | 93699 | SchuylerDistrict 6 | Removal and replacement of two structures located 4 miles southwest of Rushville at Horney Branch Creek. | — | Executed | County Contractors, Inc. $1,074,877 · | ||
| Jun 15, 2018 | 72H54 | SchuylerDistrict 6 | 9 miles of resurfacing, ADA upgrades, drainage improvements and bridge deck repairs on IL 100 from just east of US 67 to Dutchman's Creek at the east edge of Browing. | — | Executed | Illinois Valley Paving, a div of UCM, Inc. $3,369,826 · | ||
| Aug 3, 2018 | 68E56 | McDonoughSchuylerDistrict 4 | Intermittent centerline joint repair and partial depth patching on US 67 from north of Industry city limits to IL 101. | — | Rejected | Illinois Valley Paving, a div of UCM, Inc. $262,274 · | ||
| Jan 18, 2019 | 72K69 | SchuylerDistrict 6 | Installing cross road pipe culver, existing pipe culvert removal and fill, and related ditch improvements on IL 99 just south of Vaughn Lane, south of Camden. | — | Executed | County Contractors, Inc. $156,000 · | ||
| Nov 8, 2019 | 72J99 | SchuylerDistrict 6 | Resurfacing, traffic signal upgrades, ADA sidewalk ramps and HMA shoulders at the intersection of US 24 and US 67 on the west side of Rushville. | — | Executed | Illinois Valley Paving, a div of UCM, Inc. $1,495,995 · | ||
| Mar 6, 2020 | 68F23 | FultonSchuylerDistrict 4 | 10.5 miles of patching, cold-in-place recycling, and resurfacing from US 136 to 0.4 mile S of the Schuyler County line. | — | Executed | Illinois Valley Paving, a div of UCM, Inc. $5,653,611 · | ||
| Mar 6, 2020 | 72J31 | SchuylerDistrict 6 | 8.3 miles of milling and resurfacing on IL 100 from just north of Browning to just south of the Fulton County line. | — | Executed | Illinois Valley Paving, a div of UCM, Inc. $3,071,153 · | ||
| Apr 24, 2020 | 72L70 | SchuylerDistrict 6 | Deck repairs on SN 085-0004 carrying IL 103 over Town Branch and SN 085-0005 carrying IL 103 over Crane Creek. | — | Executed | County Contractors, Inc. $268,992 · | ||
| Jun 12, 2020 | 72L57 | SchuylerDistrict 6 | Painting SN 085-0001 carrying US 67 over Crane Creek, 2.5 miles southeast of Rushville. | — | Executed | ERA-Valdivia Contractors, Inc. $128,505 · | ||
| Nov 6, 2020 | 72L97 | SchuylerDistrict 6 | Microsilica overlay of SN 085-0025 carrying IL 101 over Williams Creek, 0.4 miles east of the Hancock County line. | — | Executed | Freesen, a div of UCM, Inc. $597,124 · | ||
| Mar 5, 2021 | 93757 | SchuylerDistrict 6 | Replace the bridge carrying La Prairie Road over South Fork Cedar Creek, east of the Adams County line. | — | Executed | County Contractors, Inc. $537,820 · | ||
| Apr 23, 2021 | 93767 | SchuylerDistrict 6 | Resurfacing approaches to the bridge carrying CH 5 over the Lamoine River Slough, Cape Seal resufacting of CH 5 from County Road 3100E to the Rushville Corporate Limits, and on CH 1 from IL 103 to the Rushville Corporate limits. | — | Executed | A. C. Pavement Striping Co. $1,527,806 · | ||
| Sep 17, 2021 | 72K08 | SchuylerDistrict 6 | Bridge replacement (SN 085-0002) carrying US 67 over Bluff Ditch, 1.8 miles northwest of IL 100. | — | Executed | County Contractors, Inc. $1,553,674 · | ||
| Sep 17, 2021 | 72N01 | SchuylerDistrict 6 | Lot improvements at the Rushville Maintenance Yard. | — | Executed | Lee Hood d/b/a Hood Demolition & Excavation $129,336 · | ||
| Mar 11, 2022 | 93754 | SchuylerDistrict 6 | Guardrail replacement at various locations in Schuyler County. | — | Executed | Clevenger Contractors, Inc. $1,120,325 · | ||
| Aug 5, 2022 | 72011 | SchuylerDistrict 6 | Substructure and erosion repairs on SN 085-0030 and SN 085-0031 carrying IL 99 over Missouri Creek and Little Missouri Creek in southern Schuyler County. | — | Executed | Otto Baum Company, Inc. $98,250 · | ||
| Jun 16, 2023 | 72114 | SchuylerDistrict 6 | Spray-applied pipe liner on IL 100 approximately 0.2 miles east of Old US 67 (Adams Road) in Frederick. | — | Executed | Hoerr Construction, Inc. $120,600 · | ||
| Nov 17, 2023 | 72F14 | SchuylerDistrict 6 | 7.3 miles of milling, resurfacing, bridge overlay (SN 085-0004), slope stabilization and guardrail replacement on IL 103 from 0.1 miles east of US 24 to 1.7 miles west of US 67. | — | Executed | Illinois Valley Paving, a div of UCM, Inc. $11,920,700 · | ||
| Jan 19, 2024 | 72283 | SchuylerDistrict 6 | 0.14 miles of landscaping on US 67 / Bluff Road northwest of Bluffs Ditch, 1.8 miles northwest of IL 100. | — | Executed | Central Landscaping, LP $229,957 · | ||
| Jan 19, 2024 | 72H58 | SchuylerDistrict 6 | 5.7 miles of standard overlay and ADA improvements on IL 101 from 0.2 miles west of Freeman Mine Road to US 67. | — | Executed | Illinois Valley Paving, a div of UCM, Inc. $2,900,266 · | ||
| Apr 26, 2024 | 72620 | SchuylerDistrict 6 | Painting portions of SN 085-0029 carrying IL 99 over Cedar Creek, 0.65 miles north of Camden. | — | Executed | ERA-Valdivia Contractors, Inc. $194,688 · | ||
| Nov 7, 2025 | 72523 | CassSchuylerDistrict 6 | 1.8 miles of tree removal on US 67 / IL 100 near the Illinois River Bridge in Beardstown. | — | Executed | Freesen, a div of UCM, Inc. $765,687 · | ||
| Feb 27, 2026 | 72762 | SchuylerDistrict 6 | 11.7 miles of standard overlay, concrete gutter repairs, riprap and culvert rehabilitation (SN 085-2013) on IL 101 from the Hancock County line to 0.2 miles west of Freeman Mine Road. | — | Executed | Illinois Valley Paving, a div of UCM, Inc. $5,590,001 · | ||
| Feb 27, 2026 | 93852 | SchuylerDistrict 6 | Reconstruction of West Lafayette Street from Jackson Street to Monroe Street in Rushville. Additionally includes concrete curb and gutter, PCC pavement intersections, sidewalks, lighting, landscaping and other required work. | — | Executed | Laverdiere Construction, Inc. $1,249,952 · | ||
| Jun 12, 2026 | 72E73 | SchuylerDistrict 6 | Riprap installation and minor bridge repairs on SN 085-0039 carrying IL 100 over Sugar Creek, 2.3 miles north of Frederick. | — | Executed | Otto Baum Company, Inc. $56,000 · | ||
| Jun 12, 2026 | 72J76 | SchuylerDistrict 6 | Microsilica concrete overlays on IL 99 at Cedar Creek 0.5 miles north of Camden and Missouri Creek and Little Missouri Creek 1 mile and 0.3 miles north of the Brown County line. (085-0031, 085-0030, and 085-0029) | — | Executed | Otto Baum Company, Inc. $1,870,400 · | ||
| Sep 18, 2026 | 72E88 | SchuylerDistrict 6 | Pipe culvert removal and replacement on IL 99, 0.8 miles south of CH 5 (Camden Road / La Prairie Road), south of Camden. | — | Executed | Rees Construction Company of Quincy $81,487 · |
1–27 of 27
Lettings: IDOT Transportation Bulletin (Notice of Letting and Contract Detail pages). Planned projects: IDOT Multi-Year Highway Improvement Program (roadway, structure and spot layers on the IDOT open data hub), listed by program year, not let date. "Added" is the first date Bid Potato saw the job. Always confirm against the official proposal before bidding.