118RS-3;119RS-4
Bidders 1
| # | Contractor | Total bid | vs estimate | vs low |
|---|---|---|---|---|
| EE | Engineer's estimate | — | ||
| 1 | Gunther Construction, a div of UCM, Inc. Low bidder | $4,722,460 |
| Seq | Bid code | Description | Qty | Unit | Estimate | #1 Gunther Constru… |
|---|---|---|---|---|---|---|
| 1 | XZ013798 | CONSTR STA LAYOUT | 1 | L SUM | $0.0100 | |
| 2 | X0556100 | PART DEPTH PATCH SPL | 1,100 | SQ YD | $36.75 | |
| 3 | X4240420 | PC CONC SIDEWALK 4 SP | 39 | SQ FT | $33.94 | |
| 4 | X4400196 | HMA SURF REM SPL | 3,552 | SQ YD | $6.74 | |
| 5 | X4401198 | HMA SURF REM VAR DP | 640 | SQ YD | $6.91 | |
| 6 | X4421000 | PARTIAL DEPTH PATCH | 246 | TON | $407.78 | |
| 7 | X6330725 | SPBGR (SHORT RADIUS) | 25 | FOOT | $42.00 | |
| 8 | X7015005 | CHANGEABLE MESSAGE SN | 240 | CAL DA | $47.25 | |
| 9 | Z0001002 | GDRL AGG EROS CONT | 1,390 | TON | $71.04 | |
| 10 | Z0033600 | LONG JOINT REPAIR | 3,248 | FOOT | $2.57 | |
| 11 | Z0034105 | MATL TRANSFER DEVICE | 24,297 | TON | $1.99 | |
| 12 | Z0076600 | TRAINEES | 1,000 | HOUR | $0.8000 | |
| 13 | Z0076604 | TRAINEES TPG | 1,000 | HOUR | $15.00 | |
| 14 | 25000750 | MOWING | 35 | ACRE | $120.75 | |
| 15 | 28100207 | STONE RIPRAP CL A4 | 331 | TON | $127.05 | |
| 16 | 35501306 | HMA BASE CSE 5 1/2 | 674 | SQ YD | $81.38 | |
| 17 | 40200800 | AGG SURF CSE B | 66 | TON | $186.42 | |
| 18 | 40600295 | P BIT MATLS TACK CT | 189,664 | POUND | $1.37 | |
| 19 | 40600827 | P LB MM IL-4.75 N50 | 9,669 | TON | $118.59 | |
| 20 | 40600982 | HMA SURF REM BUTT JT | 1,008 | SQ YD | $21.70 | |
| 21 | 40600990 | TEMPORARY RAMP | 285 | SQ YD | $24.55 | |
| 22 | 40603335 | HMA SC "D" N50 | 14,673 | TON | $95.55 | |
| 23 | 40800050 | INCIDENTAL HMA SURF | 254 | TON | $195.95 | |
| 24 | 42400100 | PC CONC SIDEWALK 4 | 2,321 | SQ FT | $17.84 | |
| 25 | 42400800 | DETECTABLE WARNINGS | 509 | SQ FT | $28.24 | |
| 26 | 44000152 | HMA SURF REM 3/4 | 160,178 | SQ YD | $1.64 | |
| 27 | 44000158 | HMA SURF REM 2 1/4 | 10,834 | SQ YD | $3.51 | |
| 28 | 44000600 | SIDEWALK REM | 1,636 | SQ FT | $4.65 | |
| 29 | 44300200 | STRIP REF CR CON TR | 127,876 | FOOT | $0.6200 | |
| 30 | 48101200 | AGGREGATE SHLDS B | 5,904 | TON | $19.95 | |
| 31 | 48203100 | HMA SHOULDERS | 129 | TON | $95.55 | |
| 32 | 56109210 | WATER VALVES ADJUST | 2 | EACH | $815.61 | |
| 33 | 63000001 | SPBGR TY A 6FT POSTS | 4,225 | FOOT | $22.05 | |
| 34 | 63000003 | SPBGR TY A 9FT POSTS | 962.5 | FOOT | $33.60 | |
| 35 | 63000350 | LSG OV CUL 12'6" SPAN | 150 | FOOT | $23.63 | |
| 36 | 63100045 | TRAF BAR TERM T2 | 4 | EACH | $1,365.00 | |
| 37 | 63100085 | TRAF BAR TERM T6 | 12 | EACH | $2,730.00 | |
| 38 | 63100167 | TR BAR TRM T1 SPL TAN | 68 | EACH | $2,625.00 | |
| 39 | 63200310 | GUARDRAIL REMOV | 8,747.5 | FOOT | $3.62 | |
| 40 | 64200108 | SHOULDER RUM STRIP 8 | 606 | FOOT | $13.50 | |
| 41 | 67000400 | ENGR FIELD OFFICE A | 4 | CAL MO | $2,464.79 | |
| 42 | 67100100 | MOBILIZATION | 1 | L SUM | $167,585.25 | |
| 43 | 70100450 | TRAF CONT-PROT 701201 | 1 | L SUM | $19,624.50 | |
| 44 | 70100460 | TRAF CONT-PROT 701306 | 1 | L SUM | $16,653.00 | |
| 45 | 70102640 | TR CONT & PROT 701801 | 1 | L SUM | $467.12 | |
| 46 | 70103815 | TR CONT SURVEILLANCE | 10 | CAL DA | $966.20 | |
| 47 | 70300100 | SHORT TERM PAVT MKING | 25,720 | FOOT | $1.06 | |
| 48 | 70300150 | SHRT TRM PAVT MK REM | 2,122 | SQ FT | $2.62 | |
| 49 | 70300220 | TEMP PVT MK LINE 4 | 176,295 | FOOT | $0.1100 | |
| 50 | 72501000 | TERMINAL MARKER - DA | 68 | EACH | $26.25 | |
| 51 | 78009004 | MOD URETH PM LINE 4 | 176,295 | FOOT | $0.5800 | |
| 52 | 78100100 | RAISED REFL PAVT MKR | 833 | EACH | $25.60 | |
| 53 | 78200005 | GRDRAIL REF TYPE A | 169 | EACH | $8.40 | |
| 54 | 78300200 | RAISED REF PVT MK REM | 254 | EACH | $16.70 |