$97.82Avg low bid / TON
$96.94Avg of all bids
—Avg engineer's estimate
121Jobs · 351,942 TON
Average low bid by year
| Year | Jobs | Quantity | Avg low | Avg all |
|---|---|---|---|---|
| 2021 | 3 | 3,705 | $127.60 | $101.57 |
| 2020 | 2 | 896 | $141.51 | $125.37 |
| 2019 | 78 | 241,258.5 | $97.52 | $97.32 |
| 2018 | 38 | 106,082.5 | $97.07 | $95.69 |
| Let date | Contract | County / District | Quantity | Unit price | Low bidder |
|---|---|---|---|---|---|
| Nov 5, 2021 | 66F01 | IroquoisDistrict 3 | 45 TON | $185.00 | Iroquois Paving Corporation |
| Jul 30, 2021 | 60X74 | CookDistrict 1 | 538 TON | $139.40 | Copenhaver Construction, Inc. |
| Mar 5, 2021 | 89788 | McdonoughDistrict 4 | 3,122 TON | $124.74 | Gunther Construction, a div of UCM, Inc. |
| Apr 24, 2020 | 68C92 | PeoriaDistrict 4 | 457 TON | $183.31 | R. A. Cullinan and Son, a div of UCM, Inc. |
| Apr 24, 2020 | 87702 | KendallDistrict 3 | 439 TON | $98.00 | Geneva Construction Company |
| Sep 20, 2019 | 61D65 | LakeDistrict 1 | 565 TON | $110.00 | Plote Construction, Inc. |
| Sep 20, 2019 | 61F93 | CookDistrict 1 | 600 TON | $92.50 | J. A. Johnson Paving Company |
| Sep 20, 2019 | 61G00 | LakeDistrict 1 | 144 TON | $130.00 | Berger Excavating Contractors, Inc. |
| Sep 20, 2019 | 62G42 | CookDistrict 1 | 524 TON | $115.86 | R. W. Dunteman Company |
| Sep 20, 2019 | 68C65 | KnoxDistrict 4 | 108 TON | $189.00 | Valley Construction Co. |
| Jul 12, 2019 | 62H83 | MchenryDistrict 1 | 3,957 TON | $82.00 | Arrow Road Construction Co. |
| Jul 12, 2019 | 62G29 | MchenryDistrict 1 | 1,320 TON | $84.00 | Curran Contracting Company |
| Jul 12, 2019 | 62H95 | LakeDistrict 1 | 3,379 TON | $85.50 | Arrow Road Construction Co. |
| Jul 12, 2019 | 62G59 | DupageDistrict 1 | 2,563 TON | $91.75 | R. W. Dunteman Company |
| Jul 12, 2019 | 62J02 | CookDistrict 1 | 5,413 TON | $93.00 | D. Construction, Inc. |
| Jul 12, 2019 | 62G69 | CookDistrict 1 | 930 TON | $90.50 | Arrow Road Construction Co. |
| Jul 12, 2019 | 68D00 | Stark, HenryDistrict 4 | 464 TON | $115.00 | Advanced Asphalt Company |
| Jul 12, 2019 | 62G70 | CookDistrict 1 | 1,220 TON | $83.00 | Bigane Paving Company |
| Jul 12, 2019 | 68D68 | Peoria, MarshallDistrict 4 | 39 TON | $200.00 | Advanced Asphalt Company |
| Jul 12, 2019 | 62H56 | CookDistrict 1 | 1,330 TON | $92.75 | Arrow Road Construction Co. |
| Jul 12, 2019 | 68F10 | HendersonDistrict 4 | 1,196.5 TON | $164.73 | Gunther Construction, a div of UCM, Inc. |
| Jun 14, 2019 | 62G83 | LakeDistrict 1 | 2,608 TON | $127.50 | Peter Baker & Son Co. |
| Jun 14, 2019 | 62B75 | LakeDistrict 1 | 643 TON | $114.80 | Campanella and Sons, Inc. |
| Jun 14, 2019 | 89715 | FultonDistrict 4 | 1,572 TON | $122.32 | Otto Baum Company, Inc. |
| Jun 14, 2019 | 62C06 | MchenryDistrict 1 | 364 TON | $102.00 | Plote Construction, Inc. |
| Jun 14, 2019 | 62C08 | CookDistrict 1 | 231 TON | $87.00 | D. Construction, Inc. |
| Jun 14, 2019 | 62F19 | DupageDistrict 1 | 272 TON | $170.60 | Benchmark Construction Co., Inc. |
| Jun 14, 2019 | 62G30 | LakeDistrict 1 | 2,980 TON | $83.00 | Builders Paving, LLC |
| Apr 26, 2019 | 62H12 | CookDistrict 1 | 5,982 TON | $79.80 | Arrow Road Construction Co. |
| Apr 26, 2019 | 60V94 | CookDistrict 1 | 396 TON | $120.50 | Gallagher Asphalt Corporation |
| Apr 26, 2019 | 61F72 | DupageDistrict 1 | 594 TON | $99.90 | K-Five Construction Corporation |
| Apr 26, 2019 | 61F50 | DupageDistrict 1 | 1,673 TON | $105.00 | K-Five Construction Corporation |
| Apr 26, 2019 | 62H22 | CookDistrict 1 | 11,841 TON | $84.00 | D. Construction, Inc. |
| Apr 26, 2019 | 61D85 | CookDistrict 1 | 1,339 TON | $79.50 | D. Construction, Inc. |
| Apr 26, 2019 | 61F77 | CookDistrict 1 | 1,054 TON | $90.00 | Lindahl Brothers, Inc. |
| Apr 26, 2019 | 61F56 | DupageDistrict 1 | 1,602 TON | $108.00 | J. A. Johnson Paving Company |
| Apr 26, 2019 | 62H36 | LakeDistrict 1 | 5,517 TON | $112.00 | Peter Baker & Son Co. and Plote Construction, Inc JV |
| Apr 26, 2019 | 61F01 | CookDistrict 1 | 1,485 TON | $109.00 | K-Five Construction Corporation |
| Apr 26, 2019 | 62C01 | LakeDistrict 1 | 2,683 TON | $111.75 | Peter Baker & Son Co. |
| Apr 26, 2019 | 60R42 | CookDistrict 1 | 2,822 TON | $83.00 | D. Construction, Inc. |
| Apr 26, 2019 | 61F65 | LakeDistrict 1 | 1,276 TON | $99.91 | Campanella and Sons, Inc. |
| Apr 26, 2019 | 62H44 | CookDistrict 1 | 5,360 TON | $81.20 | Arrow Road Construction Co. |
| Apr 26, 2019 | 61F09 | CookDistrict 1 | 300 TON | $94.32 | R. W. Dunteman Company |
| Apr 26, 2019 | 62G23 | DupageDistrict 1 | 3,668 TON | $125.00 | K-Five Construction Corporation |
| Apr 26, 2019 | 60R52 | WillDistrict 1 | 1,180 TON | $87.00 | D. Construction, Inc. |
| Apr 26, 2019 | 61F67 | WillDistrict 1 | 1,850 TON | $83.00 | D. Construction, Inc. |
| Apr 26, 2019 | 62H45 | CookDistrict 1 | 4,965 TON | $78.00 | Plote Construction, Inc. |
| Apr 26, 2019 | 61F10 | CookDistrict 1 | 307 TON | $104.22 | R. W. Dunteman Company |
| Apr 26, 2019 | 62G96 | LakeDistrict 1 | 2,795 TON | $100.00 | Plote Construction, Inc. |
| Apr 26, 2019 | 60V17 | DupageDistrict 1 | 7,704 TON | $112.00 | K-Five Construction Corporation |
| Apr 26, 2019 | 61F69 | LakeDistrict 1 | 1,130 TON | $109.60 | Peter Baker & Son Co. |
| Apr 26, 2019 | 68D98 | PeoriaDistrict 4 | 462 TON | $125.10 | R. A. Cullinan and Son, a div of UCM, Inc. |
| Apr 26, 2019 | 61F26 | DupageDistrict 1 | 605 TON | $110.00 | A Lamp Concrete Contractors, Inc. |
| Mar 8, 2019 | 62G64 | DupageDistrict 1 | 2,600 TON | $98.00 | K-Five Construction Corporation |
| Mar 8, 2019 | 62F54 | DupageDistrict 1 | 4,307 TON | $93.15 | R. W. Dunteman Company |
| Mar 8, 2019 | 68D22 | PeoriaDistrict 4 | 2,162 TON | $125.00 | Advanced Asphalt Company |
| Mar 8, 2019 | 62G21 | CookDistrict 1 | 1,569 TON | $105.00 | MAT Construction Leasing, Inc. |
| Mar 8, 2019 | 62G67 | CookDistrict 1 | 1,208 TON | $65.00 | K-Five Construction Corporation |
| Mar 8, 2019 | 62F66 | CookDistrict 1 | 2,232 TON | $92.40 | Arrow Road Construction Co. |
| Mar 8, 2019 | 68E28 | WoodfordDistrict 4 | 1,245 TON | $92.50 | Advanced Asphalt Company |
| Mar 8, 2019 | 68B78 | WarrenDistrict 4 | 8,507 TON | $118.25 | Gunther Construction, a div of UCM, Inc. |
| Mar 8, 2019 | 62G80 | CookDistrict 1 | 3,788 TON | $95.00 | Gallagher Asphalt Corporation |
| Mar 8, 2019 | 62G47 | CookDistrict 1 | 8,930 TON | $116.62 | R. W. Dunteman Company |
| Mar 8, 2019 | 60T49 | CookDistrict 1 | 5,447 TON | $77.90 | Arrow Road Construction Co. |
| Mar 8, 2019 | 60P68 | DupageDistrict 1 | 3,849 TON | $97.00 | K-Five Construction Corporation |
| Mar 8, 2019 | 62H07 | CookDistrict 1 | 1,053 TON | $88.00 | Plote Construction, Inc. |
| Mar 8, 2019 | 62G58 | LakeDistrict 1 | 4,209 TON | $70.00 | J. A. Johnson Paving Company |
| Mar 8, 2019 | 89713 | TazewellDistrict 4 | 1,009 TON | $132.32 | Illinois Civil Contractors, Inc. |
| Mar 8, 2019 | 61F54 | CookDistrict 1 | 2,136 TON | $87.00 | Plote Construction, Inc. |
| Mar 8, 2019 | 62H24 | DupageDistrict 1 | 2,117 TON | $78.25 | Geneva Construction Company |
| Mar 8, 2019 | 62G62 | DupageDistrict 1 | 8,820 TON | $90.38 | R. W. Dunteman Company |
| Mar 8, 2019 | 62F49 | Cook, WillDistrict 1 | 11,525 TON | $83.00 | D. Construction, Inc. |
| Mar 8, 2019 | 62H43 | CookDistrict 1 | 3,215 TON | $83.00 | Arrow Road Construction Co. |
| Jan 18, 2019 | 62F48 | LakeDistrict 1 | 16,890 TON | $104.00 | Peter Baker & Son Co. and Plote Construction, Inc JV |
| Jan 18, 2019 | 61F23 | MchenryDistrict 1 | 130 TON | $110.00 | Curran Contracting Company |
| Jan 18, 2019 | 62H47 | CookDistrict 1 | 4,280 TON | $75.00 | Builders Paving, LLC |
| Jan 18, 2019 | 62C07 | CookDistrict 1 | 2,960 TON | $105.00 | Iroquois Paving Corporation |
| Jan 18, 2019 | 68A91 | FultonDistrict 4 | 7,759 TON | $102.62 | R. A. Cullinan and Son, a div of UCM, Inc. |
| Jan 18, 2019 | 62C51 | CookDistrict 1 | 3,002 TON | $70.00 | D. Construction, Inc. |
| Jan 18, 2019 | 68D79 | WoodfordDistrict 4 | 10,087 TON | $117.50 | Rowe Construction, a div of UCM, Inc. |
| Jan 18, 2019 | 62C77 | LakeDistrict 1 | 9,480 TON | $104.00 | Peter Baker & Son Co. |
| Jan 18, 2019 | 62F23 | CookDistrict 1 | 5,325 TON | $107.00 | J. A. Johnson Paving Company |
| Jan 18, 2019 | 61F20 | DupageDistrict 1 | 405 TON | $85.00 | K-Five Construction Corporation |
| Nov 9, 2018 | 62G91 | WillDistrict 1 | 903 TON | $86.50 | Iroquois Paving Corporation |
| Nov 9, 2018 | 61F11 | KaneDistrict 1 | 1,175 TON | $83.00 | D. Construction, Inc. |
| Nov 9, 2018 | 61F14 | CookDistrict 1 | 2,256 TON | $89.00 | Arrow Road Construction Co. |
| Nov 9, 2018 | 62A36 | CookDistrict 1 | 667 TON | $95.00 | Martam Construction Incorporated |
| Nov 9, 2018 | 62C71 | CookDistrict 1 | 2,168 TON | $80.00 | D. Construction, Inc. |
| Nov 9, 2018 | 60T13 | MchenryDistrict 1 | 479 TON | $97.38 | Campanella and Sons, Inc. |
| Nov 9, 2018 | 62F57 | DupageDistrict 1 | 9,910 TON | $87.30 | R. W. Dunteman Company |
| Nov 9, 2018 | 61E75 | KaneDistrict 1 | 283 TON | $107.00 | A Lamp Concrete Contractors, Inc. |
| Sep 21, 2018 | 61E98 | DupageDistrict 1 | 1,411 TON | $89.00 | J. A. Johnson Paving Company |
| Aug 3, 2018 | 61E92 | DupageDistrict 1 | 645 TON | $105.00 | A Lamp Concrete Contractors, Inc. |
| Aug 3, 2018 | 60P66 | KaneDistrict 1 | 541 TON | $108.95 | Martam Construction Incorporated |
| Aug 3, 2018 | 60Y22 | Lake, MchenryDistrict 1 | 198 TON | $118.30 | Alliance Contractors, Inc. |
| Aug 3, 2018 | 61E29 | CookDistrict 1 | 315 TON | $106.00 | Plote Construction, Inc. |
| Jun 15, 2018 | 62F74 | CookDistrict 1 | 4,783 TON | $101.84 | R. W. Dunteman Company |
| Jun 15, 2018 | 62D12 | CookDistrict 1 | 5,161 TON | $86.00 | Arrow Road Construction Co. |
| Jun 15, 2018 | 68D69 | TazewellDistrict 4 | 2,381 TON | $125.00 | Advanced Asphalt Company |
| Jun 15, 2018 | 61E79 | CookDistrict 1 | 525 TON | $110.00 | K-Five Construction Corporation |
| Jun 15, 2018 | 62F76 | CookDistrict 1 | 648 TON | $95.00 | Gallagher Asphalt Corporation |
| Jun 15, 2018 | 60V55 | LakeDistrict 1 | 5,676 TON | $89.00 | Berger Excavating Contractors, Inc. |
| Jun 15, 2018 | 62D16 | DupageDistrict 1 | 5,885 TON | $84.00 | K-Five Construction Corporation |
| Jun 15, 2018 | 68E40 | WarrenDistrict 4 | 133 TON | $216.24 | Gunther Construction, a div of UCM, Inc. |
| Jun 15, 2018 | 61E80 | DupageDistrict 1 | 448 TON | $75.00 | K-Five Construction Corporation |
| Jun 15, 2018 | 62F81 | CookDistrict 1 | 732 TON | $100.00 | Gallagher Asphalt Corporation |
| Jun 15, 2018 | 60Y40 | CookDistrict 1 | 1,519 TON | $107.00 | Herlihy Mid-Continent Company |
| Jun 15, 2018 | 62D64 | CookDistrict 1 | 4,433 TON | $90.50 | K-Five Construction Corporation |
| Jun 15, 2018 | 70D21 | McleanDistrict 5 | 4,550 TON | $118.50 | Rowe Construction, a div of UCM, Inc. |
| Jun 15, 2018 | 62B61 | LakeDistrict 1 | 526 TON | $93.00 | Berger Excavating Contractors, Inc. |
| Jun 15, 2018 | 62F82 | CookDistrict 1 | 890.5 TON | $92.00 | Peter Baker & Son Co. |
| Jun 15, 2018 | 61E46 | CookDistrict 1 | 1,682 TON | $110.00 | K-Five Construction Corporation |
| Jun 15, 2018 | 62D65 | CookDistrict 1 | 5,438 TON | $80.00 | J. A. Johnson Paving Company |
| Jun 15, 2018 | 62C74 | LakeDistrict 1 | 8,030 TON | $95.00 | Peter Baker & Son Co. |
| Jun 15, 2018 | 68825 | McdonoughDistrict 4 | 9,669 TON | $118.59 | Gunther Construction, a div of UCM, Inc. |
| Jun 15, 2018 | 62F83 | CookDistrict 1 | 565 TON | $98.00 | J. A. Johnson Paving Company |
| Jun 15, 2018 | 61E53 | MchenryDistrict 1 | 813 TON | $95.00 | Plote Construction, Inc. |
| Jun 15, 2018 | 62F58 | CookDistrict 1 | 8,368 TON | $105.00 | K-Five Construction Corporation |
| Jun 15, 2018 | 62C84 | MchenryDistrict 1 | 11,133 TON | $95.20 | Peter Baker & Son Co. |
| Jun 15, 2018 | 68D09 | TazewellDistrict 4 | 288 TON | $159.27 | R. A. Cullinan and Son, a div of UCM, Inc. |
| Jun 15, 2018 | 61E77 | CookDistrict 1 | 855 TON | $81.75 | Iroquois Paving Corporation |
| Apr 27, 2018 | 61E54 | CookDistrict 1 | 1,009 TON | $90.00 | J. A. Johnson Paving Company |
| Apr 27, 2018 | 62D51 | CookDistrict 1 | 5,967 TON | $72.35 | Arrow Road Construction Co. |
| Apr 27, 2018 | 62F63 | CookDistrict 1 | 2,743 TON | $77.00 | K-Five Construction Corporation |
| Apr 27, 2018 | 62C75 | LakeDistrict 1 | 1,580 TON | $85.50 | Peter Baker & Son Co. |
| Apr 27, 2018 | 60Y26 | CookDistrict 1 | 512 TON | $92.00 | Iroquois Paving Corporation |
| Apr 27, 2018 | 62F28 | DupageDistrict 1 | 5,807 TON | $78.68 | R. W. Dunteman Company |
| Apr 27, 2018 | 61E72 | CookDistrict 1 | 89 TON | $170.00 | Alliance Contractors, Inc. |
| Apr 27, 2018 | 61E58 | DupageDistrict 1 | 1,439 TON | $78.00 | D. Construction, Inc. |
| Apr 27, 2018 | 62D74 | MchenryDistrict 1 | 7,013 TON | $75.80 | Peter Baker & Son Co. |
| Apr 27, 2018 | 62F65 | CookDistrict 1 | 1,648 TON | $74.29 | Arrow Road Construction Co. |
| Apr 27, 2018 | 62D13 | CookDistrict 1 | 1,860 TON | $81.80 | Arrow Road Construction Co. |
| Apr 27, 2018 | 60Y83 | LakeDistrict 1 | 1,895 TON | $72.00 | Lorig Construction Company |
| Apr 27, 2018 | 62F53 | DupageDistrict 1 | 2,590 TON | $83.00 | Geneva Construction Company |
| Apr 27, 2018 | 62C17 | KaneDistrict 1 | 5,236 TON | $72.00 | Lorig Construction Company |
| Apr 27, 2018 | 61E59 | LakeDistrict 1 | 1,524 TON | $80.00 | Peter Baker & Son Co. |
| Apr 27, 2018 | 62D75 | MchenryDistrict 1 | 1,620 TON | $83.00 | Peter Baker & Son Co. |
| Apr 27, 2018 | 62F68 | CookDistrict 1 | 1,850 TON | $84.19 | R. W. Dunteman Company |
| Apr 27, 2018 | 62D18 | CookDistrict 1 | 2,551 TON | $79.20 | Arrow Road Construction Co. |
| Apr 27, 2018 | 61C86 | KaneDistrict 1 | 220 TON | $90.00 | Plote Construction, Inc. |
| Apr 27, 2018 | 62F55 | LakeDistrict 1 | 5,412 TON | $83.70 | Peter Baker & Son Co. |
| Apr 27, 2018 | 62C54 | CookDistrict 1 | 2,120 TON | $71.00 | D. Construction, Inc. |
| Apr 27, 2018 | 62F24 | CookDistrict 1 | 450 TON | $92.70 | Arrow Road Construction Co. |
| Apr 27, 2018 | 61E61 | DupageDistrict 1 | 802 TON | $80.00 | J. A. Johnson Paving Company |
| Apr 27, 2018 | 61D92 | DupageDistrict 1 | 1,885 TON | $80.10 | Arrow Road Construction Co. |
| Apr 27, 2018 | 68A79 | Tazewell, Woodford, McleanDistrict 4 | 781 TON | $115.00 | Rowe Construction, a Division of UCM, Inc. and Advanced Asphalt Company Joint Venture |
| Apr 27, 2018 | 62D19 | LakeDistrict 1 | 2,439 TON | $74.00 | Lorig Construction Company |
| Apr 27, 2018 | 62F56 | Cook, DupageDistrict 1 | 2,260 TON | $83.12 | R. W. Dunteman Company |
| Apr 27, 2018 | 62C61 | KendallDistrict 1 | 542 TON | $76.00 | D. Construction, Inc. |
| Apr 27, 2018 | 62F26 | LakeDistrict 1 | 8,210 TON | $80.55 | Payne & Dolan, Inc. |