(55-1414R)RS-1
Bidders 3
| # | Contractor | Total bid | vs estimate | vs low |
|---|---|---|---|---|
| EE | Engineer's estimate | — | ||
| 1 | Gallagher Asphalt Corporation Low bidder | $696,673 | ||
| 2 | D. Construction, Inc. | $752,333 | +8.0% | |
| 3 | Iroquois Paving Corporation | $848,143 | +21.7% |
| Seq | Bid code | Description | Qty | Unit | Estimate | #1 Gallagher Aspha… | #2 D. Construction… | #3 Iroquois Paving… |
|---|---|---|---|---|---|---|---|---|
| 1 | X0320050 | CONSTRUCTN LAYOUT SPL | 1 | L SUM | $1,725.00 | $9,500.00 | $3,300.00 | |
| 2 | X2010400 | STUMP REMOVAL ONLY | 47 | UNIT | $10.00 | $11.00 | $10.00 | |
| 3 | X5537800 | SS CLEANED 12 | 300 | FOOT | $2.00 | $2.20 | $1.50 | |
| 4 | X6030310 | FR & LIDS ADJUST SPL | 40 | EACH | $600.00 | $687.50 | $990.00 | |
| 5 | X7030005 | TEMP PAVT MKING REMOV | 3,970 | SQ FT | $0.0100 | $0.0100 | $0.9000 | |
| 6 | Z0004562 | COMB C C&G REM & REPL | 880 | FOOT | $31.00 | $36.30 | $40.00 | |
| 7 | Z0018500 | DRAINAGE STR CLEANED | 30 | EACH | $275.00 | $220.00 | $300.00 | |
| 8 | Z0030850 | TEMP INFO SIGNING | 102 | SQ FT | $15.00 | $25.00 | $12.00 | |
| 9 | Z0064800 | SELECTIVE CLEARING | 4 | UNIT | $350.00 | $385.00 | $350.00 | |
| 10 | 20100110 | TREE REMOV 6-15 | 114 | UNIT | $30.00 | $33.00 | $30.00 | |
| 11 | 20100210 | TREE REMOV OVER 15 | 30 | UNIT | $40.00 | $44.00 | $40.00 | |
| 12 | 20101350 | TREE PRUN OVER 10 | 4 | EACH | $45.00 | $49.50 | $45.00 | |
| 13 | 20101400 | NITROGEN FERT NUTR | 1 | POUND | $4.00 | $4.40 | $10.00 | |
| 14 | 20101600 | POTASSIUM FERT NUTR | 1 | POUND | $4.00 | $4.40 | $10.00 | |
| 15 | 20200100 | EARTH EXCAVATION | 48 | CU YD | $40.00 | $71.50 | $50.00 | |
| 16 | 21101615 | TOPSOIL F & P 4 | 135 | SQ YD | $9.98 | $10.98 | $10.00 | |
| 17 | 25000312 | SEEDING CL 4A | 0.1 | ACRE | $19,000.00 | $20,900.00 | $10,000.00 | |
| 18 | 25200110 | SODDING SALT TOLERANT | 122 | SQ YD | $15.00 | $16.50 | $10.00 | |
| 19 | 25200200 | SUPPLE WATERING | 1 | UNIT | $75.00 | $82.50 | $117.00 | |
| 20 | 28001100 | TEMP EROS CONTR BLANK | 400 | SQ YD | $3.15 | $3.47 | $6.00 | |
| 21 | 40600290 | BIT MATLS TACK CT | 11,810 | POUND | $0.0100 | $0.0100 | $0.0100 | |
| 22 | 40600400 | MIX CR JTS FLANGEWYS | 27 | TON | $360.00 | $0.0100 | $0.0100 | |
| 23 | 40600827 | P LB MM IL-4.75 N50 | 732 | TON | $100.00 | $78.00 | $87.75 | |
| 24 | 40600982 | HMA SURF REM BUTT JT | 216 | SQ YD | $0.0100 | $0.0100 | $14.00 | |
| 25 | 40601005 | HMA REPL OVER PATCH | 460 | TON | $0.0100 | $1.00 | $99.75 | |
| 26 | 40603340 | HMA SC "D" N70 | 1,480 | TON | $77.00 | $64.00 | $69.75 | |
| 27 | 42001300 | PROTECTIVE COAT | 800 | SQ YD | $0.7500 | $1.10 | $1.50 | |
| 28 | 42300400 | PCC DRIVEWAY PAVT 8 | 25 | SQ YD | $61.00 | $79.20 | $81.50 | |
| 29 | 42400200 | PC CONC SIDEWALK 5 | 5,100 | SQ FT | $6.00 | $7.15 | $6.50 | |
| 30 | 42400800 | DETECTABLE WARNINGS | 443 | SQ FT | $30.00 | $31.90 | $30.00 | |
| 31 | 44000158 | HMA SURF REM 2 1/4 | 17,500 | SQ YD | $1.90 | $1.55 | $2.00 | |
| 32 | 44000200 | DRIVE PAVEMENT REM | 25 | SQ YD | $12.00 | $27.50 | $9.00 | |
| 33 | 44000600 | SIDEWALK REM | 5,100 | SQ FT | $2.00 | $2.20 | $1.50 | |
| 34 | 44002209 | HMA RM OV PATCH 2 1/4 | 2,730 | SQ YD | $5.00 | $0.0100 | $15.00 | |
| 35 | 44201765 | CL D PATCH T2 10 | 700 | SQ YD | $60.00 | $1.00 | $120.00 | |
| 36 | 44201769 | CL D PATCH T3 10 | 665 | SQ YD | $60.00 | $1.00 | $110.00 | |
| 37 | 44201771 | CL D PATCH T4 10 | 950 | SQ YD | $60.00 | $1.00 | $105.00 | |
| 38 | 56109210 | WATER VALVES ADJUST | 3 | EACH | $250.00 | $385.00 | $575.00 | |
| 39 | 60250200 | CB ADJUST | 6 | EACH | $350.00 | $357.50 | $575.00 | |
| 40 | 60252800 | CB RECONST | 2 | EACH | $1,000.00 | $1,320.00 | $1,600.00 | |
| 41 | 60255410 | CB CLEANED | 55 | EACH | $465.00 | $220.00 | $300.00 | |
| 42 | 60260100 | INLETS ADJUST | 7 | EACH | $350.00 | $357.50 | $575.00 | |
| 43 | 60265700 | VV ADJUST | 1 | EACH | $480.00 | $385.00 | $675.00 | |
| 44 | 60404940 | FR & GRATES T23 | 2 | EACH | $400.00 | $440.00 | $400.00 | |
| 45 | 60406100 | FR & LIDS T1 CL | 3 | EACH | $350.00 | $357.50 | $400.00 | |
| 46 | 66900200 | NON SPL WASTE DISPOSL | 48 | CU YD | $100.00 | $100.00 | $100.00 | |
| 47 | 66900450 | SPL WASTE PLNS/REPORT | 1 | L SUM | $200.00 | $2,000.00 | $6,700.00 | |
| 48 | 66900530 | SOIL DISPOSAL ANALY | 1 | EACH | $200.00 | $1,485.00 | $1,400.00 | |
| 49 | 67000400 | ENGR FIELD OFFICE A | 6 | CAL MO | $500.00 | $3,500.00 | $3,000.00 | |
| 50 | 67100100 | MOBILIZATION | 1 | L SUM | $91,561.06 | $45,000.00 | $20,000.00 | |
| 51 | 70102630 | TR CONT & PROT 701601 | 1 | L SUM | $12,800.00 | $1.00 | $5,500.00 | |
| 52 | 70102635 | TR CONT & PROT 701701 | 1 | L SUM | $100.00 | $270,630.00 | $1.00 | |
| 53 | 70102640 | TR CONT & PROT 701801 | 1 | L SUM | $100.00 | $1.00 | $1.00 | |
| 54 | 70300100 | SHORT TERM PAVT MKING | 8,865 | FOOT | $0.0100 | $0.0100 | $0.5500 | |
| 55 | 70300150 | SHRT TRM PAVT MK REM | 740 | SQ FT | $0.0100 | $0.0100 | $1.40 | |
| 56 | 70300210 | TEMP PVT MK LTR & SYM | 220 | SQ FT | $0.0100 | $0.0100 | $2.50 | |
| 57 | 70300220 | TEMP PVT MK LINE 4 | 3,832 | FOOT | $0.0100 | $0.0100 | $0.2000 | |
| 58 | 70300240 | TEMP PVT MK LINE 6 | 1,086 | FOOT | $0.0100 | $0.0100 | $0.2000 | |
| 59 | 70300250 | TEMP PVT MK LINE 8 | 395 | FOOT | $0.0100 | $0.0100 | $0.2000 | |
| 60 | 70300260 | TEMP PVT MK LINE 12 | 776 | FOOT | $0.0100 | $0.0100 | $0.4000 | |
| 61 | 70300280 | TEMP PVT MK LINE 24 | 207 | FOOT | $0.0100 | $0.0100 | $2.50 | |
| 62 | 70300520 | PAVT MARK TAPE T3 4 | 2,216 | FOOT | $0.0100 | $0.0100 | $0.9000 | |
| 63 | 72400500 | RELOC SIN PAN ASSY TA | 1 | EACH | $175.00 | $150.00 | $150.00 | |
| 64 | 78000100 | THPL PVT MK LTR & SYM | 220 | SQ FT | $2.50 | $3.85 | $3.50 | |
| 65 | 78000200 | THPL PVT MK LINE 4 | 3,832 | FOOT | $0.2000 | $0.6100 | $0.5500 | |
| 66 | 78000400 | THPL PVT MK LINE 6 | 1,086 | FOOT | $0.2000 | $0.9000 | $0.8300 | |
| 67 | 78000500 | THPL PVT MK LINE 8 | 395 | FOOT | $0.2000 | $1.39 | $1.25 | |
| 68 | 78000600 | THPL PVT MK LINE 12 | 776 | FOOT | $0.4000 | $2.08 | $1.90 | |
| 69 | 78000650 | THPL PVT MK LINE 24 | 207 | FOOT | $2.50 | $3.85 | $3.50 | |
| 70 | 78100100 | RAISED REFL PAVT MKR | 172 | EACH | $26.00 | $28.60 | $26.00 | |
| 71 | 78300200 | RAISED REF PVT MK REM | 145 | EACH | $6.25 | $7.00 | $10.50 | |
| 72 | 85000200 | MAIN EX TR SIG INSTAL | 1 | EACH | $880.00 | $3,520.00 | $800.00 | |
| 73 | 88600600 | DET LOOP REPL | 155 | FOOT | $22.80 | $24.20 | $22.85 | |
| 74 | 89502376 | REBUILD EX HANDHOLE | 7 | EACH | $2,623.00 | $2,860.00 | $2,635.00 |