2025-1085-RS
- Let date
- Friday, April 24, 2026
- Contract
- 80B12 · job page
- District
- District 1
- County
- Mchenry
- Highway
- Limits
- (705.72-Ft) HMA surface removal and overlaying consist of pavement patching, pavement widening, and curb removal and repair. Drainage, grading, and landscaping improvements. Located near the intersection of US 12 and Commercial Street, in the Village of Richmond in McHenry County, Illinois.
- Classification
- Pavement patching, pavement widening, and curb removal and repair ·
- Project number
Bidders 2
| # | Contractor | Total bid | vs estimate | vs low |
|---|---|---|---|---|
| EE | Engineer's estimate | — | ||
| 1 | Alliance Contractors, Inc. Low bidder | $393,625 | ||
| 2 | Schroeder Asphalt Services, Inc. | $594,939 | +51.1% |
| Seq | Bid code | Description | Qty | Unit | Estimate | #1 Alliance Contra… | #2 Schroeder Aspha… |
|---|---|---|---|---|---|---|---|
| 1 | X4400503 | CC&G RMVL REPL > 10FT | 188 | FOOT | $93.00 | $89.00 | |
| 2 | X5537800 | SS CLEANED 12 | 268 | FOOT | $15.00 | $1.10 | |
| 3 | X6700407 | ENGRS FLD OFC TY A D1 | 4 | CAL MO | $200.00 | $3,000.00 | |
| 4 | X7010216 | TRAF CONT & PROT SPL | 1 | L SUM | $9,900.00 | $10,000.00 | |
| 5 | X7040652 | REM TEMP CONC BAR SO | 122 | FOOT | $10.00 | $45.00 | |
| 6 | X7200061 | TEMP INFO SIGNING | 51.4 | SQ FT | $18.00 | $25.00 | |
| 7 | Z0013798 | CONSTRUCTION LAYOUT | 1 | L SUM | $2,000.00 | $10,000.00 | |
| 8 | Z0036200 | PAINT CURB | 395 | FOOT | $2.00 | $5.75 | |
| 9 | 20200100 | EARTH EXCAVATION | 365 | CU YD | $20.00 | $70.00 | |
| 10 | 20201200 | REM & DISP UNS MATL | 36 | CU YD | $20.00 | $90.00 | |
| 11 | 21001000 | GEOTECH FAB F/GR STAB | 108 | SQ YD | $5.00 | $5.00 | |
| 12 | 21101505 | TOPSOIL EXC & PLAC | 304 | CU YD | $10.00 | $85.00 | |
| 13 | 25000210 | SEEDING CL 2A | 0.37 | ACRE | $18,000.00 | $4,700.00 | |
| 14 | 25000400 | NITROGEN FERT NUTR | 33 | POUND | $1.00 | $5.00 | |
| 15 | 25000600 | POTASSIUM FERT NUTR | 33 | POUND | $1.00 | $5.00 | |
| 16 | 25100630 | EROSION CONTR BLANKET | 3,538 | SQ YD | $0.1000 | $1.85 | |
| 17 | 28000250 | TEMP EROS CONTR SEED | 100 | POUND | $0.1000 | $9.00 | |
| 18 | 28000400 | PERIMETER EROS BAR | 831 | FOOT | $3.75 | $4.25 | |
| 19 | 28000510 | INLET FILTERS | 3 | EACH | $100.00 | $300.00 | |
| 20 | 28100105 | STONE RIPRAP CL A3 | 106 | SQ YD | $81.00 | $101.00 | |
| 21 | 30300001 | AGG SUBGRADE IMPROVE | 36 | CU YD | $63.00 | $85.00 | |
| 22 | 30300112 | AGG SUBGRADE IMPR 12 | 745 | SQ YD | $23.75 | $28.00 | |
| 23 | 35300300 | PCC BSE CSE 8 | 711 | SQ YD | $75.00 | $92.00 | |
| 24 | 35400300 | PCC BASE CSE W 8 | 34 | SQ YD | $75.00 | $150.00 | |
| 25 | 40600290 | BIT MATLS TACK CT | 1,591 | POUND | $0.0100 | $0.0100 | |
| 26 | 40600370 | LONG JOINT SEALANT | 613 | FOOT | $20.00 | $3.00 | |
| 27 | 40600400 | MIX CR JTS FLANGEWYS | 10 | TON | $300.00 | $450.00 | |
| 28 | 40600982 | HMA SURF REM BUTT JT | 116 | SQ YD | $10.00 | $13.00 | |
| 29 | 40604172 | P HMA SC IL-9.5 E N70 | 450 | TON | $127.75 | $171.00 | |
| 30 | 42000060 | WELDED WIRE REINF | 628 | SQ YD | $5.00 | $19.00 | |
| 31 | 44000100 | PAVEMENT REM | 160 | SQ YD | $35.00 | $25.00 | |
| 32 | 44000157 | HMA SURF REM 2 | 3,200 | SQ YD | $3.25 | $10.00 | |
| 33 | 44200944 | CL B PATCH T4 8 | 628 | SQ YD | $106.00 | $180.00 | |
| 34 | 44201298 | DOWEL BARS 1 1/4 | 300 | EACH | $5.00 | $22.00 | |
| 35 | 44213200 | SAW CUTS | 610 | FOOT | $2.50 | $11.00 | |
| 36 | 44213204 | TIE BARS 3/4 | 61 | EACH | $50.00 | $16.00 | |
| 37 | 48101600 | AGGREGATE SHLDS B 8 | 156 | SQ YD | $15.00 | $45.00 | |
| 38 | 48102100 | AGG WEDGE SHLD TYPE B | 17 | TON | $15.00 | $200.00 | |
| 39 | 60200805 | CB TA 4 DIA T8G | 1 | EACH | $7,500.00 | $4,300.00 | |
| 40 | 60253800 | CB RECON NEW T8G | 2 | EACH | $2,500.00 | $4,900.00 | |
| 41 | 60255410 | CB CLEANED | 3 | EACH | $1,200.00 | $3,300.00 | |
| 42 | 60500050 | REMOV CATCH BAS | 1 | EACH | $1,150.00 | $2,700.00 | |
| 43 | 66900200 | NON SPL WASTE DISPOSL | 350 | CU YD | $45.00 | $110.00 | |
| 44 | 66900530 | SOIL DISPOSAL ANALY | 1 | EACH | $900.00 | $1,000.00 | |
| 45 | 66901001 | REG SUB P-CONST PLAN | 1 | L SUM | $4,600.00 | $4,900.00 | |
| 46 | 66901003 | REG SUB F CON REPORT | 1 | L SUM | $500.00 | $550.00 | |
| 47 | 66901006 | REG SUB MON | 2 | CAL DA | $2,750.00 | $800.00 | |
| 48 | 67100100 | MOBILIZATION | 1 | L SUM | $25,000.00 | $5,000.00 | |
| 49 | 72400500 | RELOC SIN PAN ASSY TA | 1 | EACH | $300.00 | $500.00 | |
| 50 | 78000100 | THPL PVT MK LTR & SYM | 92 | SQ FT | $6.80 | $8.00 | |
| 51 | 78000400 | THPL PVT MK LINE 6 | 1,840 | FOOT | $1.70 | $2.75 | |
| 52 | 78000600 | THPL PVT MK LINE 12 | 476 | FOOT | $3.40 | $4.25 | |
| 53 | 78000650 | THPL PVT MK LINE 24 | 116 | FOOT | $6.80 | $8.00 | |
| 54 | 78009006 | MOD URETH PM LINE 6 | 332 | FOOT | $5.00 | $3.75 | |
| 55 | 78009008 | MOD URETH PM LINE 8 | 490 | FOOT | $7.50 | $6.50 | |
| 56 | 78009024 | MOD URETH PM LINE 24 | 18 | FOOT | $20.00 | $10.75 |