2024-1015-SCR
- Let date
- Friday, June 12, 2026
- Contract
- 62X52 · job page
- District
- District 1
- County
- Dupage
- Highway
- Limits
- The project consists of a full depth patching of the top slab over the culvert at the unnamed stream, concrete repair of the north headwall. Located at culvert (SN# 022-0567) in the City of Darien in DuPage County.
- Classification
- A full depth patching of the top slab over the culvert at the unnamed stream, concrete repair of the north hea ·
- Project number
Bidders 4
| # | Contractor | Total bid | vs estimate | vs low |
|---|---|---|---|---|
| EE | Engineer's estimate | — | ||
| 1 | D. Construction, Inc. Low bidder | $266,169 | ||
| 2 | Alliance Contractors, Inc. | $303,313 | +14.0% | |
| 3 | MYS, Incorporated | $336,737 | +26.5% | |
| 4 | Herlihy Mid-Continent Company | $419,836 | +57.7% |
| Seq | Bid code | Description | Qty | Unit | Estimate | #1 D. Construction… | #2 Alliance Contra… | #3 MYS, Incorporat… | #4 Herlihy Mid-Con… |
|---|---|---|---|---|---|---|---|---|---|
| 1 | X5021512 | COFFERDAM TYP 1 IS WW | 1 | EACH | $0.0100 | $5,000.00 | $31,322.26 | $36,000.00 | |
| 2 | X6700407 | ENGRS FLD OFC TY A D1 | 12 | CAL MO | $5,000.00 | $500.00 | $2,283.51 | $5,860.00 | |
| 3 | X7010216 | TRAF CONT & PROT SPL | 1 | L SUM | $33,500.00 | $8,000.00 | $22,491.97 | $78,000.00 | |
| 4 | X7200061 | TEMP INFO SIGNING | 89 | SQ FT | $30.00 | $16.00 | $22.23 | $20.00 | |
| 5 | X7830050 | RRPM REFLECTOR REMOVL | 9 | EACH | $20.00 | $12.00 | $8.89 | $8.00 | |
| 6 | X7830052 | RRPM REFLECTOR REPLAC | 9 | EACH | $82.50 | $15.00 | $17.79 | $75.00 | |
| 7 | Z0013798 | CONSTRUCTION LAYOUT | 1 | L SUM | $5,000.00 | $1.00 | $2,106.44 | $6,200.00 | |
| 8 | 20700220 | POROUS GRAN EMBANK | 35.6 | CU YD | $60.00 | $100.00 | $258.20 | $110.00 | |
| 9 | 25000210 | SEEDING CL 2A | 0.25 | ACRE | $5,324.00 | $4,800.00 | $5,335.56 | $4,800.00 | |
| 10 | 25000310 | SEEDING CL 4 | 0.25 | ACRE | $5,324.00 | $4,800.00 | $5,335.56 | $4,800.00 | |
| 11 | 25000400 | NITROGEN FERT NUTR | 23 | POUND | $3.30 | $6.00 | $6.67 | $6.00 | |
| 12 | 25000500 | PHOSPHORUS FERT NUTR | 23 | POUND | $3.30 | $6.00 | $6.67 | $6.00 | |
| 13 | 25000600 | POTASSIUM FERT NUTR | 23 | POUND | $3.30 | $6.00 | $6.67 | $6.00 | |
| 14 | 25100630 | EROSION CONTR BLANKET | 52 | SQ YD | $55.00 | $6.00 | $6.67 | $6.00 | |
| 15 | 28000305 | TEMP DITCH CHECKS | 10 | FOOT | $55.00 | $50.00 | $55.58 | $50.00 | |
| 16 | 28000400 | PERIMETER EROS BAR | 30 | FOOT | $55.00 | $25.00 | $27.79 | $25.00 | |
| 17 | 30300001 | AGG SUBGRADE IMPROVE | 2 | CU YD | $250.00 | $100.00 | $354.39 | $480.00 | |
| 18 | 30300112 | AGG SUBGRADE IMPR 12 | 23 | SQ YD | $100.00 | $25.00 | $47.72 | $68.50 | |
| 19 | 35501316 | HMA BASE CSE 8 | 6 | SQ YD | $0.0100 | $961.43 | $881.63 | $1,000.00 | |
| 20 | 40600290 | BIT MATLS TACK CT | 11 | POUND | $0.0100 | $0.0200 | $14.33 | $0.1000 | |
| 21 | 40604060 | HMA SC IL-9.5 D N50 | 1 | TON | $2,500.00 | $1,603.94 | $2,005.71 | $650.00 | |
| 22 | 44000100 | PAVEMENT REM | 6 | SQ YD | $175.00 | $100.00 | $329.23 | $218.00 | |
| 23 | 44004250 | PAVED SHLD REMOVAL | 18 | SQ YD | $90.00 | $100.00 | $125.33 | $112.00 | |
| 24 | 48203037 | HMA SHOULDERS 10 | 18 | SQ YD | $300.00 | $1,152.86 | $80.88 | $1,000.00 | |
| 25 | 50102400 | CONC REM | 10.2 | CU YD | $800.00 | $100.00 | $135.23 | $650.00 | |
| 26 | 50200100 | STRUCTURE EXCAVATION | 35 | CU YD | $75.00 | $100.00 | $453.66 | $115.00 | |
| 27 | 50800205 | REINF BARS, EPOXY CTD | 600 | POUND | $10.00 | $5.00 | $9.39 | $7.50 | |
| 28 | 52200020 | TEMP SOIL RETEN SYSTM | 160 | SQ FT | $70.00 | $100.00 | $241.03 | $159.00 | |
| 29 | 53212754 | STR REP CON DP = < 5 | 64 | SQ FT | $200.00 | $290.00 | $350.42 | $243.00 | |
| 30 | 53212755 | STR REP CON DP OVER 5 | 16 | SQ FT | $300.00 | $290.00 | $503.06 | $1,200.00 | |
| 31 | 54002020 | EXPAN BOLTS 3/4 | 27 | EACH | $100.00 | $50.00 | $143.27 | $750.00 | |
| 32 | 54003000 | CONC BOX CUL | 2.5 | CU YD | $5,000.00 | $40,000.00 | $12,393.47 | $4,600.00 | |
| 33 | 58700300 | CONCRETE SEALER | 7 | SQ FT | $3.00 | $10.00 | $2.99 | $35.00 | |
| 34 | 66900200 | NON SPL WASTE DISPOSL | 35 | CU YD | $100.00 | $140.00 | $157.56 | $95.00 | |
| 35 | 66900530 | SOIL DISPOSAL ANALY | 1 | EACH | $1,595.00 | $1,450.00 | $1,611.78 | $1,785.00 | |
| 36 | 66901001 | REG SUB P-CONST PLAN | 1 | L SUM | $3,410.00 | $3,100.00 | $3,445.89 | $3,400.00 | |
| 37 | 66901003 | REG SUB F CON REPORT | 1 | L SUM | $1,320.00 | $1,200.00 | $1,333.89 | $500.00 | |
| 38 | 66901006 | REG SUB MON | 20 | CAL DA | $1,000.00 | $680.00 | $755.87 | $715.00 | |
| 39 | 67100100 | MOBILIZATION | 1 | L SUM | $15,500.00 | $39,507.00 | $27,900.47 | $25,000.00 | |
| 40 | 70107025 | CHANGEABLE MESSAGE SN | 70 | CAL DA | $50.00 | $30.00 | $44.47 | $40.00 | |
| 41 | 70300150 | SHRT TRM PAVT MK REM | 1,530 | SQ FT | $0.0100 | $0.4000 | $1.00 | $0.9000 | |
| 42 | 70307120 | TEMP PVT MK L4 T4 TAPE | 4,635 | FOOT | $0.0100 | $1.30 | $1.45 | $1.30 | |
| 43 | 70400100 | TEMP CONC BARRIER | 225 | FOOT | $35.00 | $30.00 | $46.67 | $24.00 | |
| 44 | 70600250 | IMP ATTN TEMP NRD TL3 | 2 | EACH | $6,500.00 | $3,600.00 | $4,223.99 | $3,800.00 | |
| 45 | 72400500 | RELOC SIN PAN ASSY TA | 1 | EACH | $104.50 | $350.00 | $105.60 | $95.00 | |
| 46 | 78000200 | THPL PVT MK LINE 4 | 1,575 | FOOT | $2.59 | $2.01 | $2.61 | $2.35 | |
| 47 | 78000600 | THPL PVT MK LINE 12 | 220 | FOOT | $11.88 | $9.00 | $12.01 | $10.80 | |
| 48 | 78300202 | PVT MKG REM WTR BLAST | 740 | SQ FT | $4.40 | $4.50 | $4.45 | $4.00 |