(57-3)BR
Bidders 1
| # | Contractor | Total bid | vs estimate | vs low |
|---|---|---|---|---|
| EE | Engineer's estimate | — | ||
| 1 | Stark Excavating, Inc. Low bidder | $7,331,185 |
| Seq | Bid code | Description | Qty | Unit | Estimate | #1 Stark Excavatin… |
|---|---|---|---|---|---|---|
| 1 | X4210400 | LUG SYSTEM REMOVAL | 4 | EACH | $4,000.00 | |
| 2 | X4402020 | CONC MEDIAN SURF REM | 981 | SQ FT | $5.25 | |
| 3 | X5030250 | BR DECK GROOVING LONG | 2,756 | SQ YD | $10.50 | |
| 4 | X5051204 | STRUCT STEEL REMOV | 8,430 | POUND | $3.25 | |
| 5 | X5051206 | STRUCT STEEL REPAIR | 14,310 | POUND | $25.00 | |
| 6 | X5080530 | BAR TERMINATORS | 16 | EACH | $24.00 | |
| 7 | X5110308 | SLOPE WALL CRACK SEAL | 72.8 | FOOT | $55.00 | |
| 8 | X5110310 | SLOPE WALL REPAIR | 5 | SQ YD | $1,885.00 | |
| 9 | X6061702 | CONC MED TSM DOW | 1,179 | SQ FT | $35.00 | |
| 10 | X7010118 | TEMP RUMBLE STRIPS SP | 12 | EACH | $2,500.00 | |
| 11 | X7010216 | TRAF CONT & PROT SPL | 1 | L SUM | $213,250.00 | |
| 12 | X7011854 | REAL-TIME TR CONT CBU | 8 | CAL MO | $2,500.00 | |
| 13 | X7011860 | REAL-TIME TR CON W SGN | 64 | CAL MO | $650.00 | |
| 14 | X7011862 | REAL-TIME TR MON SU | 128 | CAL MO | $285.00 | |
| 15 | X7200201 | WIDTH RESTRICT SIGN | 1 | L SUM | $8,000.00 | |
| 16 | Z0001899 | JACK & REM EX BEARING | 42 | EACH | $4,150.00 | |
| 17 | Z0004552 | APPROACH SLAB REM | 294 | SQ YD | $75.00 | |
| 18 | Z0010400 | CLEANING BRIDGE SEATS | 856 | SQ FT | $6.50 | |
| 19 | Z0013798 | CONSTRUCTION LAYOUT | 1 | L SUM | $16,500.00 | |
| 20 | Z0029090 | DIAMOND GRIND BR SEC | 3,226 | SQ YD | $19.50 | |
| 21 | Z0076600 | TRAINEES | 1,500 | HOUR | $0.8000 | |
| 22 | Z0076604 | TRAINEES TPG | 1,500 | HOUR | $15.00 | |
| 23 | 20200100 | EARTH EXCAVATION | 275 | CU YD | $130.00 | |
| 24 | 31101200 | SUB GRAN MAT B 4 | 173 | SQ YD | $38.00 | |
| 25 | 31200100 | STAB SUBBASE 4 | 394 | SQ YD | $135.00 | |
| 26 | 35400400 | PCC BASE CSE W 9 | 173 | SQ YD | $150.00 | |
| 27 | 40600275 | BIT MATLS PR CT | 1,404 | POUND | $1.15 | |
| 28 | 40600290 | BIT MATLS TACK CT | 867 | POUND | $1.15 | |
| 29 | 42000060 | WELDED WIRE REINF | 446 | SQ YD | $32.00 | |
| 30 | 42000080 | PVT CON PCC BR APP SL | 446 | SQ YD | $260.00 | |
| 31 | 44000100 | PAVEMENT REM | 304 | SQ YD | $95.00 | |
| 32 | 44000161 | HMA SURF REM 3 | 3,015 | SQ YD | $22.00 | |
| 33 | 44000500 | COMB CURB GUTTER REM | 462 | FOOT | $15.00 | |
| 34 | 44004250 | PAVED SHLD REMOVAL | 989 | SQ YD | $26.00 | |
| 35 | 48101200 | AGGREGATE SHLDS B | 219 | TON | $110.00 | |
| 36 | 48102100 | AGG WEDGE SHLD TYPE B | 104 | TON | $195.00 | |
| 37 | 48203037 | HMA SHOULDERS 10 | 624 | SQ YD | $190.00 | |
| 38 | 48203100 | HMA SHOULDERS | 505 | TON | $275.00 | |
| 39 | 50102400 | CONC REM | 199 | CU YD | $3,410.00 | |
| 40 | 50104650 | SLOPE WALL REMOV | 327 | SQ YD | $60.00 | |
| 41 | 50157300 | PROTECTIVE SHIELD | 984 | SQ YD | $85.00 | |
| 42 | 50200100 | STRUCTURE EXCAVATION | 350 | CU YD | $53.00 | |
| 43 | 50300100 | FLOOR DRAINS | 60 | EACH | $675.00 | |
| 44 | 50300225 | CONC STRUCT | 132.9 | CU YD | $2,125.00 | |
| 45 | 50300255 | CONC SUP-STR | 143.3 | CU YD | $4,000.00 | |
| 46 | 50300300 | PROTECTIVE COAT | 4,967 | SQ YD | $4.00 | |
| 47 | 50301350 | CONC SUPSTR APP SLAB | 231.4 | CU YD | $715.00 | |
| 48 | 50500405 | F & E STRUCT STEEL | 17,020 | POUND | $8.50 | |
| 49 | 50800205 | REINF BARS, EPOXY CTD | 123,980 | POUND | $2.15 | |
| 50 | 50800515 | BAR SPLICERS | 774 | EACH | $62.00 | |
| 51 | 50800530 | MECHANICAL SPLICERS | 8 | EACH | $115.00 | |
| 52 | 51100100 | SLOPE WALL 4 | 327 | SQ YD | $310.00 | |
| 53 | 52000110 | PREF JT STRIP SEAL | 336 | FOOT | $275.00 | |
| 54 | 52100010 | ELAST BEARING ASSY T1 | 42 | EACH | $1,925.00 | |
| 55 | 52100510 | ANCHOR BOLTS 3/4 | 120 | EACH | $165.00 | |
| 56 | 52200010 | TEMP SHT PILING | 1,236 | SQ FT | $84.00 | |
| 57 | 53004556 | HMA SURFACE RM (DECK) | 1,565 | SQ YD | $8.00 | |
| 58 | 53016000 | DECK SLAB REP (PART) | 115 | SQ YD | $675.00 | |
| 59 | 53016001 | DECK SLAB REP (FD-T1) | 35 | SQ YD | $3,765.00 | |
| 60 | 53016002 | DECK SLAB REP (FD-T2) | 129 | SQ YD | $1,750.00 | |
| 61 | 53101002 | BR DECK SCAR 3/4 | 1,470 | SQ YD | $65.00 | |
| 62 | 53101013 | BR DECK SCAR 3 1/2 | 1,567 | SQ YD | $80.00 | |
| 63 | 53101409 | BR DK LTX C OLY 2 1/2 | 1,470 | SQ YD | $215.00 | |
| 64 | 53101414 | BR DK LTX C OLY 3 3/4 | 1,567 | SQ YD | $300.00 | |
| 65 | 53212754 | STR REP CON DP = < 5 | 847 | SQ FT | $150.00 | |
| 66 | 58600101 | GRANULAR BACKFILL STR | 287 | CU YD | $115.00 | |
| 67 | 58700300 | CONCRETE SEALER | 932 | SQ FT | $3.50 | |
| 68 | 59100100 | GEOCOMPOSITE WALL DR | 155 | SQ YD | $50.00 | |
| 69 | 59300100 | CONTR LOW-STRENG MATL | 103 | CU YD | $265.00 | |
| 70 | 60100060 | CONC HDWL FOR P DRAIN | 2 | EACH | $550.00 | |
| 71 | 60146304 | P UNDR FOR STRUCT 4 | 256 | FOOT | $45.00 | |
| 72 | 63000001 | SPBGR TY A 6FT POSTS | 437.5 | FOOT | $39.00 | |
| 73 | 63100045 | TRAF BAR TERM T2 | 2 | EACH | $2,400.00 | |
| 74 | 63100070 | TRAF BAR TERM T5 | 2 | EACH | $1,750.00 | |
| 75 | 63100085 | TRAF BAR TERM T6 | 6 | EACH | $5,800.00 | |
| 76 | 63100167 | TR BAR TRM T1 SPL TAN | 2 | EACH | $4,500.00 | |
| 77 | 63200310 | GUARDRAIL REMOV | 772 | FOOT | $10.00 | |
| 78 | 64200116 | SHOULDER RUM STRIP 16 | 4,040 | FOOT | $3.50 | |
| 79 | 67000500 | ENGR FIELD OFFICE B | 10 | CAL MO | $3,000.00 | |
| 80 | 67100100 | MOBILIZATION | 1 | L SUM | $439,850.00 | |
| 81 | 70300221 | TEMP PVT MK LINE 4 - PAINT | 24,276 | FOOT | $0.5000 | |
| 82 | 70300281 | TEMP PVT MK LINE 24 - PAINT | 40 | FOOT | $5.00 | |
| 83 | 70307120 | TEMP PVT MK L4 T4 TAPE | 24,276 | FOOT | $1.85 | |
| 84 | 70307210 | TEMP PVT MK L24 T4 TAPE | 40 | FOOT | $10.50 | |
| 85 | 70400100 | TEMP CONC BARRIER | 1,325 | FOOT | $48.50 | |
| 86 | 70400125 | PIN TEMP CONC BARRIER | 186 | EACH | $55.00 | |
| 87 | 70400200 | REL TEMP CONC BARRIER | 450 | FOOT | $18.00 | |
| 88 | 70600260 | IMP ATTN TEMP FRN TL3 | 4 | EACH | $14,750.00 | |
| 89 | 70600332 | IMP ATTN REL FRN TL3 | 2 | EACH | $3,100.00 | |
| 90 | 72501000 | TERMINAL MARKER - DA | 2 | EACH | $50.00 | |
| 91 | 78000100 | THPL PVT MK LTR & SYM | 94 | SQ FT | $6.50 | |
| 92 | 78000400 | THPL PVT MK LINE 6 | 20,127 | FOOT | $1.50 | |
| 93 | 78000500 | THPL PVT MK LINE 8 | 652 | FOOT | $2.00 | |
| 94 | 78000650 | THPL PVT MK LINE 24 | 80 | FOOT | $6.50 | |
| 95 | 78004230 | PREF PL PM TB INL L6 | 2,617 | FOOT | $6.25 | |
| 96 | 78008300 | POLYUREA PM T2 LTR-SY | 62 | SQ FT | $7.25 | |
| 97 | 78008310 | POLYUREA PM T2 LN 4 | 5,953 | FOOT | $2.50 | |
| 98 | 78008330 | POLYUREA PM T2 LN 6 | 1,494 | FOOT | $3.70 | |
| 99 | 78011035 | GRV RCSD PVT MRKG 7 | 22,744 | FOOT | $0.5500 | |
| 100 | 78011045 | GRV RCSD PVT MRKG 9 | 652 | FOOT | $0.8000 | |
| 101 | 78100100 | RAISED REFL PAVT MKR | 100 | EACH | $70.00 | |
| 102 | 78200005 | GRDRAIL REF TYPE A | 8 | EACH | $10.00 | |
| 103 | 78200011 | BARR WALL REF TYPE C | 20 | EACH | $32.00 | |
| 104 | 78300200 | RAISED REF PVT MK REM | 100 | EACH | $45.00 | |
| 105 | 78300202 | PVT MKG REM WTR BLAST | 10,070 | SQ FT | $1.50 | |
| 106 | 89000100 | TEMP TR SIG INSTALL | 2 | EACH | $110,000.00 |