(101)BR
- Let date
- Friday, June 12, 2026
- Contract
- 70D62 · job page
- District
- District 5
- County
- Edgar
- Highway
- Limits
- Replacement of SN 023-0014 with SN 023-0036 over the DandEI Railroad 0.3 miles west of the DandEI Railroad to 0.1 miles east of North 1800th St east of Paris. This requires roadway profile change on the eastern and western approaches to raise the grade of the bridge.
- Classification
- ·
- Project number
Bidders 2
| # | Contractor | Total bid | vs estimate | vs low |
|---|---|---|---|---|
| EE | Engineer's estimate | — | ||
| 1 | William Charles Construction Company, LLC Low bidder | $7,986,429 | ||
| 2 | Sangamo Construction Company | $8,768,622 | +9.8% |
| Seq | Bid code | Description | Qty | Unit | Estimate | #1 William Charles… | #2 Sangamo Constru… |
|---|---|---|---|---|---|---|---|
| 1 | X4400196 | HMA SURF REM SPL | 582 | SQ YD | $11.80 | $26.91 | |
| 2 | X4401198 | HMA SURF REM VAR DP | 296 | SQ YD | $8.78 | $37.05 | |
| 3 | X5030305 | CONC WEARING SURF 5 | 253 | SQ YD | $275.00 | $184.46 | |
| 4 | X5040100 | PREC BRIDGE APP SLAB | 2,150 | SQ FT | $72.00 | $80.40 | |
| 5 | X5080530 | BAR TERMINATORS | 512 | EACH | $42.00 | $31.44 | |
| 6 | X6010003 | PIPE DRAIN REMOVAL | 362 | FOOT | $11.00 | $23.88 | |
| 7 | X6050222 | FILL INLETS TEMPORARY | 14 | EACH | $800.00 | $2,278.49 | |
| 8 | X6050700 | REMOVE INLET BOX | 10 | EACH | $800.00 | $1,078.56 | |
| 9 | X6420112 | CENTERLN RUM STRIP 8 | 2,848 | FOOT | $0.4000 | $0.7000 | |
| 10 | X7200201 | WIDTH RESTRICT SIGN | 1 | L SUM | $3,600.00 | $3,830.29 | |
| 11 | Z0013798 | CONSTRUCTION LAYOUT | 1 | L SUM | $75,000.00 | $70,045.99 | |
| 12 | Z0037000 | PAVT CRACKNG & SEATNG | 2,633 | SQ YD | $10.00 | $7.28 | |
| 13 | Z0038700 | PERMNT BENCH MARKS | 1 | EACH | $1,500.00 | $150.86 | |
| 14 | Z0048665 | RR PROT LIABILITY INS | 1 | L SUM | $50,000.00 | $20,580.67 | |
| 15 | Z0076600 | TRAINEES | 2,000 | HOUR | $0.8000 | $0.8000 | |
| 16 | Z0076604 | TRAINEES TPG | 2,000 | HOUR | $15.00 | $15.00 | |
| 17 | 20200100 | EARTH EXCAVATION | 485 | CU YD | $80.00 | $143.45 | |
| 18 | 20400800 | FURNISHED EXCAVATION | 2,815 | CU YD | $60.00 | $101.18 | |
| 19 | 21000300 | GRAN EMBANK SPEC | 1,402 | TON | $85.00 | $88.71 | |
| 20 | 25000210 | SEEDING CL 2A | 3 | ACRE | $2,395.00 | $2,527.73 | |
| 21 | 25000400 | NITROGEN FERT NUTR | 270 | POUND | $1.70 | $1.79 | |
| 22 | 25000500 | PHOSPHORUS FERT NUTR | 270 | POUND | $1.70 | $1.79 | |
| 23 | 25000600 | POTASSIUM FERT NUTR | 270 | POUND | $1.70 | $1.79 | |
| 24 | 25100115 | MULCH METHOD 2 | 3 | ACRE | $1,595.00 | $1,683.39 | |
| 25 | 28000250 | TEMP EROS CONTR SEED | 1,200 | POUND | $10.00 | $3.71 | |
| 26 | 28000305 | TEMP DITCH CHECKS | 690 | FOOT | $16.00 | $25.07 | |
| 27 | 28000400 | PERIMETER EROS BAR | 4,336 | FOOT | $3.75 | $7.23 | |
| 28 | 28000500 | INLET & PIPE PROTECT | 4 | EACH | $300.00 | $451.88 | |
| 29 | 31200100 | STAB SUBBASE 4 | 231 | SQ YD | $230.00 | $238.31 | |
| 30 | 40200800 | AGG SURF COURSE TY B | 115 | TON | $95.00 | $60.45 | |
| 31 | 40600275 | BIT MATLS PR CT | 5,948 | POUND | $1.61 | $1.69 | |
| 32 | 40600290 | BIT MATLS TACK CT | 8,975 | POUND | $3.90 | $6.07 | |
| 33 | 40600370 | LONG JOINT SEALANT | 3,069 | FOOT | $9.00 | $9.50 | |
| 34 | 40600405 | MATL TRANSFER DEVICE | 2,668 | TON | $0.0100 | $8.39 | |
| 35 | 40600990 | TEMPORARY RAMP | 99 | SQ YD | $100.00 | $78.63 | |
| 36 | 40603080 | HMA BC IL-19.0 N50 | 1,214 | TON | $178.12 | $207.76 | |
| 37 | 40603230 | P HMA BC IL19.0 N50 | 478 | TON | $197.78 | $251.03 | |
| 38 | 40604160 | P HMA SC IL-9.5 D N50 | 1,334 | TON | $239.66 | $241.00 | |
| 39 | 40800029 | BIT MATLS TACK CT | 262 | POUND | $2.04 | $13.03 | |
| 40 | 40800050 | INCIDENTAL HMA SURF | 49 | TON | $792.03 | $657.53 | |
| 41 | 42000060 | WELDED WIRE REINF | 264 | SQ YD | $18.00 | $20.44 | |
| 42 | 42000080 | PVT CON PCC BR APP SL | 264 | SQ YD | $260.00 | $235.69 | |
| 43 | 44000100 | PAVEMENT REM | 457 | SQ YD | $40.00 | $76.74 | |
| 44 | 44000161 | HMA SURF REM 3 | 3,798 | SQ YD | $10.18 | $13.83 | |
| 45 | 44000182 | HMA SURF REM 8 | 1,454 | SQ YD | $14.03 | $20.95 | |
| 46 | 44000300 | CURB REM | 4,082 | FOOT | $5.00 | $1.68 | |
| 47 | 44004250 | PAVED SHLD REMOVAL | 6,302 | SQ YD | $16.00 | $15.36 | |
| 48 | 48102100 | AGG WEDGE SHLD TYPE B | 118 | TON | $188.75 | $71.32 | |
| 49 | 48203023 | HMA SHOULDERS 6 1/2 | 3,473 | SQ YD | $66.32 | $76.83 | |
| 50 | 48203100 | HMA SHOULDERS | 652 | TON | $169.18 | $217.10 | |
| 51 | 50100100 | REM EXIST STRUCT | 1 | EACH | $260,000.00 | $508,529.88 | |
| 52 | 50105220 | PIPE CULVERT REMOV | 234 | FOOT | $40.00 | $26.03 | |
| 53 | 50157300 | PROTECTIVE SHIELD | 326 | SQ YD | $120.00 | $1.00 | |
| 54 | 50200100 | STRUCTURE EXCAVATION | 277 | CU YD | $90.00 | $42.09 | |
| 55 | 50300225 | CONC STRUCT | 313.3 | CU YD | $1,500.00 | $1,549.16 | |
| 56 | 50300255 | CONC SUP-STR | 398.5 | CU YD | $1,800.00 | $2,117.47 | |
| 57 | 50300260 | BR DECK GROOVING | 1,210 | SQ YD | $16.00 | $11.93 | |
| 58 | 50300300 | PROTECTIVE COAT | 1,546 | SQ YD | $3.00 | $3.62 | |
| 59 | 50500105 | F & E STRUCT STEEL | 1 | L SUM | $1,523,500.00 | $1,644,294.87 | |
| 60 | 50500505 | STUD SHEAR CONNECTORS | 4,914 | EACH | $4.00 | $4.19 | |
| 61 | 50800205 | REINF BARS, EPOXY CTD | 123,750 | POUND | $2.20 | $1.73 | |
| 62 | 50800515 | BAR SPLICERS | 1,022 | EACH | $36.00 | $42.09 | |
| 63 | 51100100 | SLOPE WALL 4 | 987 | SQ YD | $235.00 | $232.93 | |
| 64 | 51201610 | FUR STL PILE HP12X63 | 1,999 | FOOT | $130.00 | $134.21 | |
| 65 | 51202305 | DRIVING PILES | 1,999 | FOOT | $1.00 | $0.0300 | |
| 66 | 51203610 | TEST PILE ST HP12X63 | 4 | EACH | $15,000.00 | $10,332.89 | |
| 67 | 51204650 | PILE SHOES | 32 | EACH | $150.00 | $244.26 | |
| 68 | 51500100 | NAME PLATES | 1 | EACH | $1,500.00 | $1,059.72 | |
| 69 | 52000110 | PREF JT STRIP SEAL | 104 | FOOT | $315.00 | $339.56 | |
| 70 | 52100520 | ANCHOR BOLTS 1 | 48 | EACH | $140.00 | $105.86 | |
| 71 | 52200010 | TEMP SHT PILING | 1,343 | SQ FT | $65.00 | $62.81 | |
| 72 | 52200600 | GEOTEX RETAIN WALL | 1,199 | SQ FT | $48.00 | $88.26 | |
| 73 | 53004556 | HMA SURFACE RM (DECK) | 384 | SQ YD | $15.26 | $19.00 | |
| 74 | 542D1069 | P CUL CL D 2 24 | 252 | FOOT | $80.00 | $79.71 | |
| 75 | 54213459 | END SECTIONS 24 | 4 | EACH | $1,100.00 | $516.65 | |
| 76 | 54262712 | METAL FL END SEC 12" | 18 | EACH | $375.00 | $557.33 | |
| 77 | 58600101 | GRANULAR BACKFILL STR | 213 | CU YD | $120.00 | $96.73 | |
| 78 | 59100100 | GEOCOMPOSITE WALL DR | 110 | SQ YD | $40.00 | $31.19 | |
| 79 | 60100060 | CONC HDWL FOR P DRAIN | 12 | EACH | $500.00 | $315.67 | |
| 80 | 60100915 | PIPE DRAINS 6 | 512 | FOOT | $46.00 | $40.18 | |
| 81 | 60100945 | PIPE DRAINS 12 | 879 | FOOT | $53.00 | $42.04 | |
| 82 | 60108206 | PIPE UNDERDR T 2 6 | 230 | FOOT | $36.00 | $50.70 | |
| 83 | 60146304 | P UNDR FOR STRUCT 4 | 193 | FOOT | $25.00 | $39.33 | |
| 84 | 60600605 | CONC CURB TB | 4,015 | FOOT | $52.00 | $44.76 | |
| 85 | 61000050 | CONC THRUST BLOCKS | 18 | EACH | $1,000.00 | $656.52 | |
| 86 | 61000115 | TY E INLET BOX 610001 | 18 | EACH | $4,500.00 | $7,601.89 | |
| 87 | 63000001 | SPBGR TY A 6FT POSTS | 13 | FOOT | $67.25 | $42.22 | |
| 88 | 63100085 | TRAF BAR TERM T6 | 4 | EACH | $5,100.00 | $6,678.72 | |
| 89 | 63100167 | TR BAR TRM T1 SPL TAN | 1 | EACH | $4,575.00 | $3,905.05 | |
| 90 | 63200310 | GUARDRAIL REMOV | 25 | FOOT | $24.10 | $10.55 | |
| 91 | 63301210 | REM RE-E SPBGR TY A | 3,663 | FOOT | $22.50 | $26.39 | |
| 92 | 63301990 | REM RE-E T B TERM T1 | 3 | EACH | $3,750.00 | $2,638.55 | |
| 93 | 64200108 | SHOULDER RUM STRIP 8 | 5,572 | FOOT | $0.8500 | $1.65 | |
| 94 | 66900200 | NON SPL WASTE DISPOSL | 614 | CU YD | $50.00 | $40.23 | |
| 95 | 66900530 | SOIL DISPOSAL ANALY | 2 | EACH | $1,750.00 | $1,899.76 | |
| 96 | 66901001 | REG SUB P-CONST PLAN | 1 | L SUM | $2,300.00 | $3,166.26 | |
| 97 | 66901003 | REG SUB F CON REPORT | 1 | L SUM | $2,300.00 | $1,055.42 | |
| 98 | 66901006 | REG SUB MON | 22 | CAL DA | $1,250.00 | $1,424.82 | |
| 99 | 67000500 | ENGR FIELD OFFICE B | 14 | CAL MO | $3,500.00 | $2,951.57 | |
| 100 | 67100100 | MOBILIZATION | 1 | L SUM | $475,000.00 | $517,348.72 | |
| 101 | 70100405 | TRAF CONT-PROT 701321 | 1 | EACH | $60,000.00 | $32,794.79 | |
| 102 | 70100450 | TRAF CONT-PROT 701201 | 1 | L SUM | $15,000.00 | $11,035.51 | |
| 103 | 70100460 | TRAF CONT-PROT 701306 | 1 | L SUM | $15,000.00 | $4,236.01 | |
| 104 | 70106500 | TEMP BR TRAF SIGNALS | 1 | EACH | $75,000.00 | $52,770.94 | |
| 105 | 70107025 | CHANGEABLE MESSAGE SN | 28 | CAL DA | $200.00 | $204.28 | |
| 106 | 70300100 | SHORT TERM PAVT MKING | 1,792 | FOOT | $5.00 | $3.54 | |
| 107 | 70300150 | SHRT TRM PAVT MK REM | 598 | SQ FT | $3.00 | $3.31 | |
| 108 | 70300221 | TEMP PVT MK LINE 4 - PAINT | 11,174 | FOOT | $0.4200 | $0.4400 | |
| 109 | 70400100 | TEMP CONC BARRIER | 2,050 | FOOT | $55.25 | $53.44 | |
| 110 | 70400125 | PIN TEMP CONC BARRIER | 910 | EACH | $16.75 | $30.41 | |
| 111 | 70400200 | REL TEMP CONC BARRIER | 2,050 | FOOT | $6.45 | $9.68 | |
| 112 | 70600250 | IMP ATTN TEMP NRD TL3 | 2 | EACH | $7,500.00 | $11,194.53 | |
| 113 | 70600350 | IMP ATTN REL NRD TL3 | 1 | EACH | $1,500.00 | $1,610.61 | |
| 114 | 72501000 | TERMINAL MARKER - DA | 1 | EACH | $42.00 | $52.77 | |
| 115 | 78001110 | PAINT PVT MK LINE 4 | 4,465 | FOOT | $0.5500 | $0.5800 | |
| 116 | 78100100 | RAISED REFL PAVT MKR | 59 | EACH | $101.00 | $106.60 | |
| 117 | 78200011 | BARR WALL REF TYPE C | 164 | EACH | $10.00 | $13.22 | |
| 118 | 78300200 | RAISED REF PVT MK REM | 47 | EACH | $100.00 | $33.03 | |
| 119 | 78300202 | PVT MKG REM WTR BLAST | 1,489 | SQ FT | $5.00 | $5.28 |