(119BR-1)B-1
Bidders 1
| # | Contractor | Total bid | vs estimate | vs low |
|---|---|---|---|---|
| EE | Engineer's estimate | — | ||
| 1 | Freesen, a div of UCM, Inc. Low bidder | $566,130 |
| Seq | Bid code | Description | Qty | Unit | Estimate | #1 Freesen, a div … |
|---|---|---|---|---|---|---|
| 1 | X0426200 | DEWATERING | 1 | L SUM | $35,105.68 | |
| 2 | X0900064 | MEMBR WTRPR SYS B STR | 110 | SQ YD | $67.45 | |
| 3 | X2501000 | SEEDING CL 2 SPL | 0.5 | ACRE | $3,150.00 | |
| 4 | X7015005 | CHANGEABLE MESSAGE SN | 28 | CAL DA | $105.00 | |
| 5 | Z0016702 | DETOUR SIGNING | 1 | L SUM | $10,368.75 | |
| 6 | Z0023602 | GRAN CULVERT BACKFILL | 467 | CU YD | $85.08 | |
| 7 | Z0054517 | ROCK FILL - FOUNDATN | 148 | TON | $50.30 | |
| 8 | 20200100 | EARTH EXCAVATION | 930 | CU YD | $26.82 | |
| 9 | 20400800 | FURNISHED EXCAVATION | 50 | CU YD | $27.83 | |
| 10 | 28000250 | TEMP EROS CONTR SEED | 31 | POUND | $4.78 | |
| 11 | 28000305 | TEMP DITCH CHECKS | 60 | FOOT | $6.14 | |
| 12 | 28000400 | PERIMETER EROS BAR | 879 | FOOT | $2.00 | |
| 13 | 28100107 | STONE RIPRAP CL A4 | 308 | SQ YD | $82.67 | |
| 14 | 28200200 | FILTER FABRIC | 308 | SQ YD | $4.01 | |
| 15 | 44200050 | WELDED WIRE REINF | 267 | SQ YD | $27.25 | |
| 16 | 44201013 | CL B PATCH T4 13 | 267 | SQ YD | $132.58 | |
| 17 | 44201299 | DOWEL BARS 1 1/2 | 40 | EACH | $48.50 | |
| 18 | 50100100 | REM EXIST STRUCT | 1 | EACH | $20,717.30 | |
| 19 | 50104400 | CONC HDWL REM | 8 | EACH | $451.49 | |
| 20 | 50105220 | PIPE CULVERT REMOV | 75 | FOOT | $24.08 | |
| 21 | 50200450 | REM/DISP UNS MATL-STR | 85 | CU YD | $30.37 | |
| 22 | 50500505 | STUD SHEAR CONNECTORS | 156 | EACH | $15.16 | |
| 23 | 50800205 | REINF BARS, EPOXY CTD | 22,330 | POUND | $1.46 | |
| 24 | 50900200 | STEEL RAIL TYPE 2399 | 46 | FOOT | $254.84 | |
| 25 | 51204650 | PILE SHOES | 14 | EACH | $184.81 | |
| 26 | 51500100 | NAME PLATES | 1 | EACH | $556.94 | |
| 27 | 52200100 | FUR SOLDIER PILES HP | 533 | FOOT | $92.97 | |
| 28 | 52200150 | DRIVE SOLDIER PILES | 533 | FOOT | $0.0100 | |
| 29 | 52200250 | UNTREATED TIMBER LAG | 640 | SQ FT | $16.25 | |
| 30 | 54003000 | CONC BOX CUL | 132.4 | CU YD | $1,200.69 | |
| 31 | 59100100 | GEOCOMPOSITE WALL DR | 44 | SQ YD | $81.36 | |
| 32 | 63000003 | SPBGR TY A 9FT POSTS | 125 | FOOT | $27.51 | |
| 33 | 63100087 | TRAF BAR TERM T6A | 4 | EACH | $3,171.00 | |
| 34 | 63100167 | TR BAR TRM T1 SPL TAN | 4 | EACH | $2,829.75 | |
| 35 | 63200310 | GUARDRAIL REMOV | 446 | FOOT | $3.43 | |
| 36 | 66700205 | PERM SURV MKRS T1 | 1 | EACH | $560.85 | |
| 37 | 67000500 | ENGR FIELD OFFICE B | 4 | CAL MO | $2,232.18 | |
| 38 | 67100100 | MOBILIZATION | 1 | L SUM | $16,817.09 | |
| 39 | 70101830 | TRAF CONT-PROT BLR 21 | 1 | L SUM | $3,864.00 | |
| 40 | 72501000 | TERMINAL MARKER - DA | 4 | EACH | $39.38 | |
| 41 | 78001110 | PAINT PVT MK LINE 4 | 140 | FOOT | $8.52 | |
| 42 | 78200005 | GRDRAIL REF TYPE A | 8 | EACH | $8.93 |