(105)RS-3
Bidders 1
| # | Contractor | Total bid | vs estimate | vs low |
|---|---|---|---|---|
| EE | Engineer's estimate | — | ||
| 1 | Howell Paving, Inc. Low bidder | $947,329 |
| Seq | Bid code | Description | Qty | Unit | Estimate | #1 Howell Paving, … |
|---|---|---|---|---|---|---|
| 1 | X0327301 | RELOCATE EX MAILBOX | 8 | EACH | $489.02 | |
| 2 | X4060995 | TEMPORARY RAMP SPL | 224 | SQ YD | $65.57 | |
| 3 | X4200408 | PCC PVT 8 SPL | 69 | SQ YD | $204.25 | |
| 4 | X6060097 | CLASS SI CONC OUT SPL | 0.5 | CU YD | $5,245.72 | |
| 5 | X7240505 | RELOC SIGN PANEL&POST | 4 | EACH | $150.00 | |
| 6 | Z0048665 | RR PROT LIABILITY INS | 1 | L SUM | $8,180.63 | |
| 7 | Z0049799 | PROT RESET SURVEY MRK | 3 | EACH | $2,404.56 | |
| 8 | Z0056650 | SS 1 WAT MN 15 | 29 | FOOT | $231.10 | |
| 9 | 20200100 | EARTH EXCAVATION | 195 | CU YD | $235.57 | |
| 10 | 20800150 | TRENCH BACKFILL | 1 | CU YD | $397.18 | |
| 11 | 21101615 | TOPSOIL F & P 4 | 316 | SQ YD | $21.67 | |
| 12 | 25200100 | SODDING | 790 | SQ YD | $49.50 | |
| 13 | 25200200 | SUPPLE WATERING | 23.7 | UNIT | $450.00 | |
| 14 | 35300500 | PCC BSE CSE 10 | 208 | SQ YD | $121.97 | |
| 15 | 40200800 | AGG SURF COURSE TY B | 13 | TON | $145.50 | |
| 16 | 40600290 | BIT MATLS TACK CT | 3,261 | POUND | $3.06 | |
| 17 | 40600370 | LONG JOINT SEALANT | 1,491 | FOOT | $14.49 | |
| 18 | 40600990 | TEMPORARY RAMP | 217 | SQ YD | $26.06 | |
| 19 | 40603219 | P HMA BC IL-9.5FG N90 | 377 | TON | $178.17 | |
| 20 | 40604052 | HMA SC IL-9.5 C N70 | 130 | TON | $193.87 | |
| 21 | 40604164 | P HMA SC IL-9.5 D N90 | 431 | TON | $251.36 | |
| 22 | 42000300 | PCC PVT 8 | 65 | SQ YD | $196.68 | |
| 23 | 42300400 | PCC DRIVEWAY PAVT 8 | 6 | SQ YD | $387.49 | |
| 24 | 42400300 | PC CONC SIDEWALK 6 | 1,015 | SQ FT | $48.27 | |
| 25 | 42400800 | DETECTABLE WARNINGS | 92 | SQ FT | $44.04 | |
| 26 | 44000100 | PAVEMENT REM | 435 | SQ YD | $55.31 | |
| 27 | 44000155 | HMA SURF REM 1 1/2 | 1,265 | SQ YD | $11.90 | |
| 28 | 44000164 | HMA SURF REM 3 3/4 | 3,849 | SQ YD | $10.19 | |
| 29 | 44000200 | DRIVE PAVEMENT REM | 6 | SQ YD | $284.21 | |
| 30 | 44000500 | COMB CURB GUTTER REM | 44 | FOOT | $143.86 | |
| 31 | 44000600 | SIDEWALK REM | 970 | SQ FT | $13.03 | |
| 32 | 44201373 | CL C PATCH T1 12 | 30 | SQ YD | $541.15 | |
| 33 | 44201377 | CL C PATCH T2 12 | 41 | SQ YD | $431.35 | |
| 34 | 44201381 | CL C PATCH T3 12 | 19 | SQ YD | $449.07 | |
| 35 | 44201383 | CL C PATCH T4 12 | 47 | SQ YD | $393.63 | |
| 36 | 48101600 | AGGREGATE SHLDS B 8 | 170 | SQ YD | $86.54 | |
| 37 | 48203029 | HMA SHOULDERS 8 | 429 | SQ YD | $163.38 | |
| 38 | 56109210 | WATER VALVES ADJUST | 2 | EACH | $333.50 | |
| 39 | 60235700 | INLETS TA T3F&G | 1 | EACH | $3,888.40 | |
| 40 | 60255500 | MAN ADJUST | 2 | EACH | $1,112.02 | |
| 41 | 60604400 | COMB CC&G TB6.18 | 127 | FOOT | $135.14 | |
| 42 | 66900200 | NON SPL WASTE DISPOSL | 75 | CU YD | $265.71 | |
| 43 | 66900530 | SOIL DISPOSAL ANALY | 1 | EACH | $1,450.00 | |
| 44 | 66901001 | REG SUB P-CONST PLAN | 1 | L SUM | $2,200.00 | |
| 45 | 66901003 | REG SUB F CON REPORT | 1 | L SUM | $2,200.00 | |
| 46 | 66901006 | REG SUB MON | 2 | CAL DA | $1,225.00 | |
| 47 | 67000400 | ENGR FIELD OFFICE A | 6 | CAL MO | $3,288.53 | |
| 48 | 67000600 | ENGR FIELD LAB | 4 | CAL MO | $4,191.80 | |
| 49 | 67100100 | MOBILIZATION | 1 | L SUM | $25,547.91 | |
| 50 | 70100460 | TRAF CONT-PROT 701306 | 1 | L SUM | $1,224.42 | |
| 51 | 70102620 | TR CONT & PROT 701501 | 1 | L SUM | $58,308.83 | |
| 52 | 70102640 | TR CONT & PROT 701801 | 1 | L SUM | $1,474.42 | |
| 53 | 70103815 | TR CONT SURVEILLANCE | 10 | CAL DA | $0.0100 | |
| 54 | 70107025 | CHANGEABLE MESSAGE SN | 28 | CAL DA | $150.00 | |
| 55 | 70300100 | SHORT TERM PAVT MKING | 717 | FOOT | $4.36 | |
| 56 | 70300150 | SHRT TRM PAVT MK REM | 159 | SQ FT | $19.46 | |
| 57 | 72000100 | SIGN PANEL T1 | 3 | SQ FT | $32.00 | |
| 58 | 72800100 | TELES STL SIN SUPPORT | 33 | FOOT | $29.00 | |
| 59 | 78000100 | THPL PVT MK LTR & SYM | 126 | SQ FT | $14.00 | |
| 60 | 78000200 | THPL PVT MK LINE 4 | 3,516 | FOOT | $2.36 | |
| 61 | 78000400 | THPL PVT MK LINE 6 | 262 | FOOT | $3.54 | |
| 62 | 78000650 | THPL PVT MK LINE 24 | 84 | FOOT | $14.50 | |
| 63 | 78011000 | GRV RCSD PM LTR & SYM | 122 | SQ FT | $14.50 | |
| 64 | 78011025 | GRV RCSD PVT MRKG 5 | 3,265 | FOOT | $1.61 | |
| 65 | 78011035 | GRV RCSD PVT MRKG 7 | 262 | FOOT | $4.00 | |
| 66 | 78011125 | GRV RCSD PVT MRKG 25 | 84 | FOOT | $15.00 |